JAEA Reports

MK-III Function Tests in JOYO; Primary main Cooling Pump

Isozaki, Kazunori; Saito, Takakazu; Sumino, Kozo; Yamazaki, Yuji*; Karube, Koji; Terano, Toshihiro; Sakaba, Hideo

JNC TN9410 2004-014, 172 Pages, 2004/06

JNC-TN9410-2004-014.pdf:48.0MB

This technical report describes MK-III function tests on the primary main cooling pump. MK-III function tests (SKS-1) before MK-III core configuration completed from October 17, 2001 to October 23, 2001. MK-III function tests (SKS-2) after MK-III core configuration completed from January 27, 2003 to February 13, 2003. The results of function tests were shown as follows; (1) The primary main pump was confirmed to do stable control on both CAS (cascade) mode and MAN (manual) mode in the flow control system. And also this was confirmed no-emanation trend both flow and revolution per minute against flow step response, too. (2) The main motor was shifted run-back operation in about 54 seconds after scram. Run-back operation of the main motor (A) was 167m3/h with 117 rpm. 185 m$$^{3}$$/h with 118 rpm was the main motor (B). And they were controlled within the limit of run-back operational revolution 122 rpm $$pm$$ 8 rpm. The flow was confirmed to maintain in 10 percent and over of the rated flow. (3) Succeeding operation to the pony motor was confirmed to do in about 39 seconds after the primary main pump trip. The pony motor (A) operation was 180m3/h with 124rpm. 190 m$$^{3}$$/h with 123 rpm was the pony motor (B). They were enough satisfied with the forgiven revolution per minute which was 93 rpm and over. And the flow was confirmed to maintain in 10 percent and over of the rated flow. (4) Free flow coast down characteristic of the primary main pump was confirmed that time constant was 10 seconds at both the trip and run-back operation time of the primary main pump. (5) Over flow column sodium level of the main pump duty operation was NL-1,550 mm Na by column (A), NL-1,468mm Na by column (B). They were smaller than NL-1,581 mm Na by the design value. Pressure loss value of the new IHX had more conservative value than the design value. (6) The primary main pump was confirmed which the rated flow could be restored no-scram by the instantaneous power loss within 0.6 second.

JAEA Reports

Experimanetal Fast Reactor JOYO MK-III Functional Test; Primary Auxiliary Cooling System Test

Karube, Koji; Akagi, S.; Terano, Toshihiro; Onuki, Osamu; Ito, Hideaki; Aoki, Hiroshi; Odo, Toshihiro

JNC TN9430 2004-004, 36 Pages, 2004/03

JNC-TN9430-2004-004.pdf:1.03MB

This paper describes the results of primary auxiliary cooling system,which were done as a part of JOYO MK-III function test. The aim of the tests was to confirm the operational performance of primary auxiliary EMP and the protection system including siphon breaker of primary auxiliary cooling ststem. The items of the tests were:(1) Test No.:SKS-117/Test item/EMP start up test (2) Test No.:SKS-118-1/Test item:EMP start up test when pony mortor running (3) Test NO.:SKS-121/Test item:Function test of siphon breaker The results of the tests satisfied the required performance,and demonstrated succeccful operation of primary auxiliary cooling system.

JAEA Reports

Operation experience report of experimental fast reactor JOYO; Operation expelience of primary main and auxiliary cooling systems of JOYO

Karube, Koji; ; ; ; Kawai, Masashi;

PNC TN9440 93-012, 83 Pages, 1993/04

PNC-TN9440-93-012.pdf:5.27MB

This report describes the operating experience of the primary main cooling system from January 1982 to March 1992, and of the primary auxiliary cooling system from october 1986 to March 1992. 0ut lines of the operating experience ale followings; There have been no serious troubles in this period. (1)The main system; Operation time of the circulation pumps are about 67675 hours. Accumulated operation time of the pumps are about 105970 hours. The pumps has been started 212 times. (2)The auxiliary system; Operation time of the circulation pump (EMP) is about 4767 hours. Accumulated operation time of the pump is about 8667 hours. The pump has been automatically started 31 times with the scheduled test.

Oral presentation

Experimental Fast Reactor Joyo emergency operation act in Northeastern Japan earthquake 3.11

Karube, Koji; Aita, Tsuyoshi; Okawa, Toshikatsu

no journal, , 

no abstracts in English