Refine your search:     
Report No.
 - 
Search Results: Records 1-9 displayed on this page of 9
  • 1

Presentation/Publication Type

Initialising ...

Refine

Journal/Book Title

Initialising ...

Meeting title

Initialising ...

First Author

Initialising ...

Keyword

Initialising ...

Language

Initialising ...

Publication Year

Initialising ...

Held year of conference

Initialising ...

Save select records

Journal Articles

Beam commissioning of the linac for iBNCT

Naito, Fujio*; Anami, Shozo*; Ikegami, Kiyoshi*; Uota, Masahiko*; Ouchi, Toshikatsu*; Onishi, Takahiro*; Oba, Toshiyuki*; Obina, Takashi*; Kawamura, Masato*; Kumada, Hiroaki*; et al.

Proceedings of 13th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.1244 - 1246, 2016/11

The proton linac installed in the Ibaraki Neutron Medical Research Center is used for production of the intense neutron flux for the Boron Neutron Capture Therapy (BNCT). The linac consists of the 3-MeV RFQ and the 8-MeV DTL. Design average beam current is 10mA. Target is made of Beryllium. First neutron production from the Beryllium target was observed at the end of 2015 with the low intensity beam as a demonstration. After the observation of neutron production, a lot of improvement s was carried out in order to increase the proton beam intensity for the real beam commissioning. The beam commissioning has been started on May 2016. The status of the commissioning is summarized in this report.

Journal Articles

Status of the J-PARC RFQ

Hasegawa, Kazuo; Kobayashi, Tetsuya; Kondo, Yasuhiro; Morishita, Takatoshi; Oguri, Hidetomo; Hori, Yoichiro*; Kubota, Chikashi*; Matsumoto, Hiroshi*; Naito, Fujio*; Yoshioka, Masakazu*

Proceedings of 1st International Particle Accelerator Conference (IPAC '10) (Internet), p.621 - 623, 2010/05

The J-PARC RFQ accelerates a negative hydrogen beam from 50 keV to 3 MeV. Beam commissioning of the J-PARC linac started in November 2006 and the linac has delivered beams to the 3 GeV synchrotron since September 2007. Trip rates of the RFQ, however, unexpectedly increased in September 2008. We tried to recover by tender conditioning, improvement of vacuum properties, etc. User operations for the Material and Life Experimental Facilities were successfully carried out at 20 kW in June 2009, and the beam power was increased to 120 kW in November. The high power operation at 300 kW for one hour was also demonstrated. Status and improvement of the J-PARC RFQ are presented.

Journal Articles

Status of the J-PARC RFQ

Hasegawa, Kazuo; Morishita, Takatoshi; Kondo, Yasuhiro; Oguri, Hidetomo; Kobayashi, Tetsuya; Naito, Fujio*; Yoshioka, Masakazu*; Matsumoto, Hiroshi*; Kawamata, Hiroshi*; Hori, Yoichiro*; et al.

Proceedings of 6th Annual Meeting of Particle Accelerator Society of Japan (CD-ROM), p.693 - 695, 2010/03

The J-PARC RFQ (length 3.1m, 4-vane type, 324 MHz) accelerates a beam from the ion source to the DTL. The beam test of the linac was started in November 2006 and 181 MeV beam was successfully accelerated in January 2007. Since then, the linac has been delivered beams for commissioning of the linac itself, downstream accelerators and facilities. Trip rates of the RFQ, however, suddenly increased in Autumn 2008, and we are suffering from this issue for user run operation. We tried to recover by tender conditioning, modification of RF control, improvement of vacuum and so on. We manage to have beam operation. In this report, we describe the status of the RFQ.

Oral presentation

Crystallization of $$beta$$-lactoglobulin, $$alpha$$-amylase, 2Zn-insulin, cubic-insulin and RNase a for neutron diffraction experiment

Yagi, Daichi*; Ebata, Toshinobu*; Ichige, Toshikatsu*; Kobayashi, Yoichiro*; Ishikawa, Takuya*; Yamashita, Masahiro*; Onishi, Yuki*; Tanaka, Ichiro*; Kurihara, Kazuo; Niimura, Nobuo*

no journal, , 

no abstracts in English

Oral presentation

Research and development on preceding processing methods for contaminated water management waste at Fukushima Daiichi Nuclear Power Station, 12; Modeling the dissolution behavior of solidified body of cement and Alkali Activated Material

Kobayashi, Yutaro*; Haga, Kazuko*; Kaneda, Yoshihisa*; Kuroda, Kazuma*; Sato, Tsutomu*; Osugi, Takeshi; Sone, Tomoyuki; Kuroki, Ryoichiro

no journal, , 

no abstracts in English

Oral presentation

Research and development on preceding processing methods for contaminated water management wasteat Fukushima Daiichi Nuclear Power Station, 24; Experimental and modeling studies on the dissolution behavior of cement solidified body with modified wastes

Kobayashi, Yutaro*; Haga, Kazuko*; Kaneda, Yoshihisa*; Sato, Tsutomu*; Kakuda, Ayaka; Osugi, Takeshi; Sone, Tomoyuki; Kuroki, Ryoichiro

no journal, , 

no abstracts in English

Oral presentation

Research and development on preceding processing methods for contaminated water management waste at Fukushima Daiichi Nuclear Power Station, 23; Interaction between Iron Slurry and Alkali Activated Materials

Raudhatul Islam, C.*; Kobayashi, Yutaro*; Haga, Kazuko*; Kaneda, Yoshihisa*; Kakuda, Ayaka; Osugi, Takeshi; Sone, Tomoyuki; Kuroki, Ryoichiro; Sato, Tsutomu*

no journal, , 

Oral presentation

Research and development on preceding processing methods for contaminated water management waste at Fukushima Daiichi Nuclear Power Station, 43; Crystallization of amorphous phases formed in Alkali Activated Material solidified body

Kobayashi, Yutaro*; Osawa, Norihisa*; Haga, Kazuko*; Kaneda, Yoshihisa*; Chaerun Raudhatul, I.*; Sato, Tsutomu*; Taniguchi, Takumi; Kuroki, Ryoichiro; Osugi, Takeshi

no journal, , 

no abstracts in English

9 (Records 1-9 displayed on this page)
  • 1