Refine your search:     
Report No.
 - 
Search Results: Records 1-9 displayed on this page of 9
  • 1

Presentation/Publication Type

Initialising ...

Refine

Journal/Book Title

Initialising ...

Meeting title

Initialising ...

First Author

Initialising ...

Keyword

Initialising ...

Language

Initialising ...

Publication Year

Initialising ...

Held year of conference

Initialising ...

Save select records

Journal Articles

IFMIF; Overview of the validation activities

Knaster, J.*; Arbeiter, F.*; Cara, P.*; Favuzza, P.*; Furukawa, Tomohiro; Groeschel, F.*; Heidinger, R.*; Ibarra, A.*; Matsumoto, Hiroshi*; Mosnier, A.*; et al.

Nuclear Fusion, 53(11), p.116001_1 - 116001_18, 2013/11

AA2013-0294.pdf:2.55MB

 Times Cited Count:62 Percentile:94.3(Physics, Fluids & Plasmas)

The IFMIF/EVEDA project under the Broader Approach Agreement between Japan and EU aims at allowing a rapid construction phase of IFMIF in due time. The three main facilities, (1) the Accelerator Facility, (2) the Target Facility and (3) the Test Facility, are the subject of validation activities that include the construction of either full scale prototypes or smartly devised scaled down facilities that will allow a straightforward extrapolation to IFMIF needs. The installation of a Linac of 1.125 MW (125 mA and 9 MeV) of deuterons started in March 2013 in Rokkasho. The world largest liquid Li test loop is running in Oarai with an ambitious experimental programme for the years ahead. A full scale high flux test module that will house $$sim$$ 1000 small specimens developed jointly in Europe and Japan has been constructed in Germany together with its He gas loop. A full scale medium flux test module to carry out on-line creep measurement has been constructed in Switzerland.

Journal Articles

Values of construction of IFMIF accelerator prototype and targeted issues

Sugimoto, Masayoshi; Garin, P.*; Vermare, C.*; Shidara, Hiroyuki; Kimura, Haruyuki; Suzuki, Hiromitsu; Ohira, Shigeru; Okumura, Yoshikazu; Mosnier, A.*; Facco, A.*; et al.

Kasokuki, 7(2), p.110 - 118, 2010/07

International Fusion Materials Irradiation Facility (IFMIF) is an accelerator-based neutron irradiation facility dedicated for development of fusion materials. Engineering Validation and Engineering Design Activities (EVEDA) phase of IFMIF project has been initiated in June 2007 and a prototype of the IFMIF accelerator (40 MeV - 125 mA CW Deuteron) is under construction in Rokkasho, Aomori. The target of the prototype is 9 MeV - 125 mA CW beam operation, which is full scale prototyping up to the first tank of superconducting linac section. In this report, the major technical specifications and issues of this extremely high-power machine are overviewed and expected results through operation in future are summarized.

Journal Articles

Commissioning of the IFMIF/EVEDA accelerator prototype; Objectives & plans

Vermare, C.*; Garin, P.*; Shidara, H.*; Beauvais, P. Y.*; Mosnier, A.*; Ibarra, A.*; Heidinger, R.*; Facco, A.*; Pisent, A.*; Maebara, Sunao; et al.

Proceedings of 1st International Particle Accelerator Conference (IPAC '10) (Internet), p.777 - 779, 2010/05

Journal Articles

The Accelerator prototype of the IFMIF/EVEDA project

Mosnier, A.*; Beauvais, P. Y.*; Branas, B.*; Comunian, M.*; Facco, A.*; Garin, P.*; Gobin, R.*; Gournay, J. F.*; Heidinger, R.*; Ibarra, A.*; et al.

Proceedings of 1st International Particle Accelerator Conference (IPAC '10) (Internet), p.588 - 590, 2010/05

Journal Articles

Progress of the accelerator in Broader Approach IFMIF/EVEDA project

Shinto, Katsuhiro; Vermare, C.*; Harami, Taikan*; Sugimoto, Masayoshi; Garin, P.*; Maebara, Sunao; Sakaki, Hironao; Ohira, Shigeru; Okumura, Yoshikazu; Mosnier, A.*; et al.

Proceedings of 5th Annual Meeting of Particle Accelerator Society of Japan and 33rd Linear Accelerator Meeting in Japan (CD-ROM), p.255 - 258, 2008/00

Oral presentation

Overview of the accelerator in broader approach IFMIF/EVEDA project

Shinto, Katsuhiro; Vermare, C.*; Sugimoto, Masayoshi; Garin, P.*; Maebara, Sunao; Mosnier, A.*

no journal, , 

Oral presentation

Present status of the IFMIF/EVEDA prototype accelerator construction

Shidara, Hiroyuki; Vermare, C.*; Sugimoto, Masayoshi; Garin, P.*; Maebara, Sunao; Shinto, Katsuhiro; Mosnier, A.*; Ibarra, A.*; Facco, A.*

no journal, , 

no abstracts in English

Oral presentation

Fusion technology activities through the Broader Approach IFMIF-EVEDA project

Matsumoto, Hiroshi; Knaster, J.*; Heidinger, R.*; Sugimoto, Masayoshi; Ibarra, A.*; Mosnier, A.*; Heinzel, V.*; Massaut, V.*; Micciche, G.*; M$"o$slang, A.*

no journal, , 

The International Fusion Materials Irradiation Facility (IFMIF) Engineering Design and Engineering Validation Activities (EVEDA) started in 2007 under the framework of the Broader Approach (BA) Agreement between EU and Japan with the objective of developing a complete engineering design of the IFMIF together with accompanying sub projects to validate the major elements of the technologies essential for the IFMIF Plant. The validation sub projects include design and construction of the prototype deuteron beam accelerator, Lithium Loop Test Facility, and irradiation test of samples in Rigs for High Flux Test Modules. The recent achievements from these activities will be presented.

Oral presentation

IFMIF/EVEDA; Progress of validation and design activities under the Broader Approach framework

Sugimoto, Masayoshi; Knaster, J.*; Arbeiter, F.*; Cara, P.*; Favuzza, P.*; Furukawa, Tomohiro; Gioacchino, M.*; Groeschel, F.*; Heidinger, R.*; Ibarra, A.*; et al.

no journal, , 

Under the framework of the Broader Approach agreement between Japan and EURATOM the concept of the International Fusion Materials Irradiation Facility (IFMIF) to provide the intense neutron irradiation test facility for developing the fusion reactor materials has been evolved since 2007, through the activities to prepare the engineering design documents for IFMIF with the associated R&D of prototypical components, named as IFMIF Engineering Validation and Engineering Design Activities (EVEDA) project. Recently the Intermediate IFMIF Engineering Design Report for IFMIF (IIEDR) was delivered in July 2013, which is supported by the major outcomes of the validation activities of the prototypical components: Linear IFMIF Prototype Accelerator, EVEDA Lithium Test Loop, High Flux Test Module capsule, etc. In this article, the progresses of the IIEDR and validation tests and also the outcomes to be achieved till mid 2017, the completion time of IFMIF/EVEDA, will be comprehensively overviewed.

9 (Records 1-9 displayed on this page)
  • 1