Refine your search:     
Report No.
 - 
Search Results: Records 1-1 displayed on this page of 1
  • 1

Presentation/Publication Type

Initialising ...

Refine

Journal/Book Title

Initialising ...

Meeting title

Initialising ...

First Author

Initialising ...

Keyword

Initialising ...

Language

Initialising ...

Publication Year

Initialising ...

Held year of conference

Initialising ...

Save select records

Journal Articles

The Manufacturing of the superconducting magnet system for the JT-60SA

Yoshida, Kiyoshi; Kizu, Kaname; Tsuchiya, Katsuhiko; Murakami, Haruyuki; Kamiya, Koji; Payrot, M.*; Zani, L.*; Wanner, M.*; Barabaschi, P.*; Heller, R.*; et al.

IEEE Transactions on Applied Superconductivity, 22(3), p.4200304_1 - 4200304_4, 2012/06

 Times Cited Count:22 Percentile:70.63(Engineering, Electrical & Electronic)

The JT-60SA is progressing as a "satellite" facility for ITER in the Broader Approach agreement. The fabrications of the conductor for CS and EF coils were started in 2008. The first superconducting conductor of EF4 coil was manufactured at March 2010. The manufacturing tools for EF coils are design and prepared from 2009. The double pancake using the superconductor has been started at 2011. The TF coil case encloses the winding pack and is the main structural component of the magnet system. The interface between TF case and CS and EF coil were designed. The conductor for TF coils fabrication has been started. The cryogenic system is equivalent to be about 9 kW refrigeration at 4.5 K. Each coil is electrically connected through the in-cryostat feeder and the coil terminal boxes. The 26 current leads using high temperature superconductor. The manufacturing of superconducting magnet for JT-60SA are started by solving its cost and technology.

1 (Records 1-1 displayed on this page)
  • 1