Refine your search:     
Report No.
 - 
Search Results: Records 1-19 displayed on this page of 19
  • 1

Presentation/Publication Type

Initialising ...

Refine

Journal/Book Title

Initialising ...

Meeting title

Initialising ...

First Author

Initialising ...

Keyword

Initialising ...

Language

Initialising ...

Publication Year

Initialising ...

Held year of conference

Initialising ...

Save select records

Journal Articles

Operational experience of CW SRF injector and main linac cryomodules at the Compact ERL

Sakai, Hiroshi*; Enami, Kazuhiro*; Furuya, Takaaki*; Kako, Eiji*; Kondo, Yoshinari*; Michizono, Shinichiro*; Miura, Takako*; Qiu, F.*; Sato, Masato*; Shinoe, Kenji*; et al.

Proceedings of 56th ICFA Advanced Beam Dynamics Workshop on Energy Recovery Linacs (ERL 2015) (Internet), p.63 - 66, 2015/12

no abstracts in English

Journal Articles

Construction of cERL cryomodules for injector and main linac

Umemori, Kensei*; Furuya, Takaaki*; Kako, Eiji*; Noguchi, Shuichi*; Sakai, Hiroshi*; Sato, Masato*; Shishido, Toshio*; Watanabe, Ken*; Yamamoto, Yasuchika*; Shinoe, Kenji*; et al.

Proceedings of 15th International Conference on RF Superconductivity (SRF 2011) (Internet), p.956 - 961, 2011/07

The Compact ERL (cERL) project is advanced in Japan. Its aim is to demonstrate the circulation of 100 mA electron beams with energy of 35-200 MeV. Superconducting cavities are key components for realizing ERL and used for injector part and main linac part. Critical issue for the injector part is the development of input power coupler. Prototype input couplers were fabricated and high power test was performed. Cooling ability of HOM coupler is also important for CW operation of cavity. At main linac part, HOM damped 9-cell cavities are applied to avoid BBU instabilities. Prototypes were fabricated for the cavity, the input coupler and the HOM absorber. Their performance was investigated. For both parts, cryomodules are under construction and will be completed in 2012.

Journal Articles

Recent progress in the energy recovery linac project in Japan

Sakanaka, Shogo*; Akemoto, Mitsuo*; Aoto, Tomohiro*; Arakawa, Dai*; Asaoka, Seiji*; Enomoto, Atsushi*; Fukuda, Shigeki*; Furukawa, Kazuro*; Furuya, Takaaki*; Haga, Kaiichi*; et al.

Proceedings of 1st International Particle Accelerator Conference (IPAC '10) (Internet), p.2338 - 2340, 2010/05

Future synchrotron light source using a 5-GeV energy recovery linac (ERL) is under proposal by our Japanese collaboration team, and we are conducting R&D efforts for that. We are developing high-brightness DC photocathode guns, two types of cryomodules for both injector and main superconducting (SC) linacs, and 1.3 GHz high CW-power RF sources. We are also constructing the Compact ERL (cERL) for demonstrating the recirculation of low-emittance, high-current beams using above-mentioned critical technologies.

Journal Articles

KEK ERL cryomodule development

Sakai, Hiroshi*; Furuya, Takaaki*; Kako, Eiji*; Noguchi, Shuichi*; Sato, Masato*; Sakanaka, Shogo*; Shishido, Toshio*; Takahashi, Takeshi*; Umemori, Kensei*; Watanabe, Ken*; et al.

Proceedings of 45th Advanced ICFA Beam Dynamics Workshop on Energy Recovery Linacs (ERL '09) (Internet), p.57 - 62, 2010/05

Development of a SC Cavity Injector Cryomodule and Main linac Cryomodule for the compact ERL is being continued at KEK since 2006. Design of an injector cryomodule containing three 2-cell 1.3-GHz cavities for Injector Cryomodule and two 9-cell 1.3-GHz cavities for Main linac Cryomodule are almost completed. Status of R&D and design details are reported.

Journal Articles

Compact ERL linac

Umemori, Kensei*; Furuya, Takaaki*; Kako, Eiji*; Noguchi, Shuichi*; Sakai, Hiroshi*; Sato, Masato*; Shishido, Toshio*; Takahashi, Takeshi*; Watanabe, Ken*; Yamamoto, Yasuchika*; et al.

Proceedings of 14th International Conference on RF Superconductivity (SRF 2009) (Internet), p.896 - 901, 2009/09

Construction of the Compact ERL is planned in Japan, in order to test the key technology to realize a future ERL based X-ray light source. The operation of 60-200 MeV beam energy and 100 mA beam current are proposed. The superconducting cavity is one of the key components and applied for the injector part and the main linac part. At the injector part, most challenging issue is an input coupler, which has to handle more than 300 kW input power per cavity. On the other hand, strong HOM damping is required for the main linac, in order to avoid beam instabilities and large heat load at cryomodules. Status of cavity developments, together with cryomodule developments, including input couplers and HOM couplers/absorbers, are described in this paper.

Journal Articles

Progress in R&D efforts on the energy recovery linac in Japan

Sakanaka, Shogo*; Ago, Tomonori*; Enomoto, Atsushi*; Fukuda, Shigeki*; Furukawa, Kazuro*; Furuya, Takaaki*; Haga, Kaiichi*; Harada, Kentaro*; Hiramatsu, Shigenori*; Honda, Toru*; et al.

Proceedings of 11th European Particle Accelerator Conference (EPAC '08) (CD-ROM), p.205 - 207, 2008/06

Future synchrotron light sources based on the energy-recovery linacs (ERLs) are expected to be capable of producing super-brilliant and/or ultra-short pulses of synchrotron radiation. Our Japanese collaboration team is making efforts for realizing an ERL-based hard X-ray source. We report recent progress in our R&D efforts.

Journal Articles

Construction of the vertical test system for the superconducting cavity in KEK-STF

Yamamoto, Yasuchika*; Hayano, Hitoshi*; Kako, Eiji*; Noguchi, Shuichi*; Sato, Masato*; Shishido, Toshio*; Umemori, Kensei*; Watanabe, Ken*; Sakai, Hiroshi*; Shinoe, Kenji*; et al.

Proceedings of 5th Annual Meeting of Particle Accelerator Society of Japan and 33rd Linear Accelerator Meeting in Japan (CD-ROM), p.888 - 891, 2008/00

In KEK, the new Superconducting RF Test Facility(STF) is being constructed, including the electro-polish system (EP), the high pressure rinsing system (HPR), the clean-room, the refrigerator system, the high power RF source system, and the vertical test system. The cavity is generally measured in the vertical cryostat for the performance test. The new vertical test facility was constructed since the last year, and completed at the beginning of March. The first test was done for the total system check at the beginning of July.

Journal Articles

Pulsed operation of the 972 MHz prototype cryomodule for ADS superconducting linac

Kako, Eiji*; Noguchi, Shuichi*; Ouchi, Norihito*; Shishido, Toshio*; Tsuchiya, Kiyosumi*; Akaoka, Nobuo*; Chishiro, Etsuji; Hori, Toshihiko; Kobayashi, Hideki*; Nakata, Morihiro*; et al.

Physica C, 441(1-2), p.220 - 224, 2006/07

 Times Cited Count:0 Percentile:0(Physics, Applied)

A prototype cryomodule containing two 9-cell superconducting cavities of $$beta$$=0.725 and $$f$$$$_{0}$$=972 MHz had been constructed under the collaboration of Japan Atomic Energy Research Institute (JAERI) and High Energy Accelerator Research Organization (KEK) on the development of superconducting LINAC for Accelerator Driven System (ADS). Cool-down tests to 2 K of the cryomodule and high power rf tests with a 972 MHz pulsed klystron have been carried out. Rf power of 350 kW in pulsed operation of 3 msec and 25 Hz was transferred to a nine-cell cavity through an input coupler. Accelerating gradients of 14 MV/m (compared to the specification of 10 MV/m) have been achieved in both cavities. Compensation of Lorentz-force detuning by a piezo tuner was successfully demonstrated.

Journal Articles

Development of superconducting proton linac for ADS

Ouchi, Nobuo; Akaoka, Nobuo*; Asano, Hiroyuki*; Chishiro, Etsuji; Namekawa, Yuya*; Suzuki, Hiroyuki*; Ueno, Tomoaki*; Noguchi, Shuichi*; Kako, Eiji*; Ouchi, Norihito*; et al.

Proceedings of 4th International Workshop on the Utilisation and Reliability of High Power Proton Accelerators, p.175 - 183, 2005/11

no abstracts in English

Journal Articles

High power test of the prototype cryomodule for ADS superconducting linac

Kako, Eiji*; Noguchi, Shuichi*; Ouchi, Norihito*; Shishido, Toshio*; Tsuchiya, Kiyosumi*; Akaoka, Nobuo; Chishiro, Etsuji; Hori, Toshihiko; Kobayashi, Hideki*; Nakata, Morihiro*; et al.

Proceedings of 2nd Annual Meeting of Particle Accelerator Society of Japan and 30th Linear Accelerator Meeting in Japan, p.191 - 193, 2005/07

no abstracts in English

Journal Articles

High power test of the prototype cryomodule for ADS superconducting linac

Kako, Eiji*; Noguchi, Shuichi*; Ouchi, Norihito*; Shishido, Toshio*; Tsuchiya, Kiyosumi*; Akaoka, Nobuo*; Chishiro, Etsuji; Hori, Toshihiko; Kobayashi, Hideki*; Nakata, Morihiro*; et al.

Proceedings of 2005 Particle Accelerator Conference (PAC '05) (CD-ROM), p.3579 - 3581, 2005/00

no abstracts in English

Journal Articles

Status of a superconducting linac for the J-PARC ADS

Hasegawa, Kazuo; Ouchi, Nobuo; Chishiro, Etsuji; Kako, Eiji*; Noguchi, Shuichi*; Ouchi, Norihito*; Shishido, Toshio*; Tsuchiya, Kiyosumi*

Proceedings of 34th ICFA Advanced Beam Dynamics Workshop on High Power Superconducting Ion, Proton and Multi-Species Linacs (HPSL 2005) (Internet), 5 Pages, 2005/00

no abstracts in English

Journal Articles

RF property of the prototype cryomodule for ADS superconducting linac

Kako, Eiji*; Noguchi, Shuichi*; Ouchi, Norihito*; Shishido, Toshio*; Akaoka, Nobuo*; Kobayashi, Hideki*; Ouchi, Nobuo; Ueno, Tomoaki*; Hara, Hiroshi*; Matsuoka, Masanori*; et al.

Proceedings of 9th European Particle Accelerator Conference (EPAC 2004) (CD-ROM), p.1042 - 1044, 2004/07

no abstracts in English

Journal Articles

High-power test of J-PARC SC cavity input coupler

Kako, Eiji*; Noguchi, Shuichi*; Shishido, Toshio*; Asano, Hiroyuki*; Chishiro, Etsuji; Suzuki, Hiroyuki*; Hori, Toshihiko*; Yamazaki, Masayoshi*

Proceedings of 28th Linear Accelerator Meeting in Japan, p.324 - 326, 2004/06

no abstracts in English

Journal Articles

Cryogenic performance of the prototype cryomodule for ADS superconducting linac

Ouchi, Norihito*; Kako, Eiji*; Noguchi, Shuichi*; Shishido, Toshio*; Tsuchiya, Kiyosumi*; Akaoka, Nobuo*; Kobayashi, Hideki*; Ouchi, Nobuo; Ueno, Tomoaki*; Hara, Hiroshi*; et al.

Proceedings of 9th European Particle Accelerator Conference (EPAC 2004), p.1033 - 1035, 2004/00

no abstracts in English

Journal Articles

Development of superconducting linac for the KEK/JAERI joint project

Ouchi, Nobuo; Mizumoto, Motoharu; Kusano, Joichi; Chishiro, Etsuji; Hasegawa, Kazuo; Akaoka, Nobuo*; Saito, Kenji*; Noguchi, Shuichi*; Kako, Eiji*; Inoue, Hitoshi*; et al.

Proceedings of 20th International Linac Conference (CD-ROM), 1 Pages, 2000/00

no abstracts in English

Oral presentation

Training courses, exercises and drill in Japan

Shishido, Toshio

no journal, , 

In the workshop, education and training which are performed for nuclear disaster prevention in Japan are introduced. Firstly, present legal background and guideline of Japanese nuclear disaster prevention countermeasures are introduced. And the functions of response organization such as national government, local government and licensees are described. The guideline of nuclear disaster prevention countermeasure recommends the content of education and training that should be carried out. The list of education and training course are presented based on the guideline. The Off-Site Center is established as a facility for the immediate emergency countermeasure base. The activity at the Off-Site center is important to collect, share and issue the information. Lastly the national exercise and the functional group drill are introduced as examples of training.

Oral presentation

Development for ERL superconducting accelerator cavities

Sawamura, Masaru; Umemori, Kensei*; Sakanaka, Shogo*; Suwada, Tsuyoshi*; Takahashi, Takeshi*; Furuya, Takaaki*; Noguchi, Shuichi*; Kako, Eiji*; Shishido, Toshio*; Watanabe, Ken*; et al.

no journal, , 

Superconducting accelerator cavities are essential for the energy-recovery linac. The superconducting cavities are used in an injector and a main linac. A new model has been designed for the ERL. A center-single-cell cavity, an end-single-cell cavity and 9-cell cavity have been constructed. Vertical tests were performed for the center-single-cell cavity and the end-single cell cavity. A 2-cell cavity for the injector is under construction.

Oral presentation

Support activity for training, exercises and drill

Shishido, Toshio

no journal, , 

no abstracts in English

19 (Records 1-19 displayed on this page)
  • 1