Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Miura, Hikaru*; Kuribara, Yuichi; Yamamoto, Masayoshi*; Sakaguchi, Aya*; Yamaguchi, Noriko*; Sekizawa, Oki*; Nitta, Kiyofumi*; Higaki, Shogo*; Tsumune, Daisuke*; Itai, Takaaki*; et al.
Scientific Reports (Internet), 10, p.11421_1 - 11421_9, 2020/07
Times Cited Count:18 Percentile:67.97(Multidisciplinary Sciences)Okumura, Yoshikazu; Gobin, R.*; Knaster, J.*; Heidinger, R.*; Ayala, J.-M.*; Bolzon, B.*; Cara, P.*; Chauvin, N.*; Chel, S.*; Gex, D.*; et al.
Review of Scientific Instruments, 87(2), p.02A739_1 - 02A739_3, 2016/02
Times Cited Count:8 Percentile:34.96(Instruments & Instrumentation)IFMIF is an accelerator based neutron facility having two set of linear accelerators each producing 125mA/CW deuterium ion beams (250mA in total) at 40MeV. The LIPAc (Linear IFMIF Prototype Accelerator) being developed in the IFMIF-EVEDA project consists of an injector, a RFQ accelerator, and a part of superconducting Linac, whose target is to demonstrate 125mA/CW deuterium ion beam acceleration up to 9MeV. The injector has been developed in CEA Saclay and already demonstrated 140mA/100keV deuterium beam. The injector was disassembled and delivered to the International Fusion Energy Research Center (IFERC) in Rokkasho, Japan, and the commissioning has started after its reassembly 2014; the first beam production has been achieved in November 2014. Up to now, 100keV/120mA/CW hydrogen ion beam has been produced with a low beam emittance of 0.2 .mm.mrad (rms, normalized).
Okumura, Yoshikazu; Ayala, J.-M.*; Bolzon, B.*; Cara, P.*; Chauvin, N.*; Chel, S.*; Gex, D.*; Gobin, R.*; Harrault, F.*; Heidinger, R.*; et al.
Proceedings of 12th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.203 - 205, 2015/09
Under the framework of Broader Approach (BA) agreement between Japan and Euratom, IFMIF/EVEDA project was launched in 2007 to validate the key technologies to realize IFMIF. The most crucial technology to realize IFMIF is two set of linear accelerator each producing 125mA/CW deuterium ion beams up to 40MeV. The prototype accelerator, whose target is 125mA/CW deuterium ion beam acceleration up to 9MeV, is being developed in International Fusion Research Energy Center (IFERC) in Rokkasho, Japan. The injector developed in CEA Saclay was delivered in Rokkasho in 2014, and is under commissioning. Up to now, 100keV/120mA/CW hydrogen ion beams and 100keV/90mA/CW duty deuterium ion beams are successfully produced with a low beam emittance of 0.21 .mm.mrad (rms, normalized). Delivery of RFQ components will start in 2015, followed by the installation of RF power supplies in 2015.
Takahashi, Hiroki; Maebara, Sunao; Kojima, Toshiyuki; Narita, Takahiro; Tsutsumi, Kazuyoshi; Sakaki, Hironao; Suzuki, Hiromitsu; Sugimoto, Masayoshi
Fusion Engineering and Design, 89(9-10), p.2066 - 2070, 2014/10
Times Cited Count:0 Percentile:0.01(Nuclear Science & Technology)Shinto, Katsuhiro; Ichikawa, Masahiro; Takahashi, Yasuyuki*; Kubo, Takashi*; Tsutsumi, Kazuyoshi; Kikuchi, Takayuki; Kasugai, Atsushi; Sugimoto, Masayoshi; Gobin, R.*; Girardot, P.*; et al.
Proceedings of 11th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.1009 - 1012, 2014/10
The prototype accelerator is being developed as an engineering validation for the International Fusion Materials Irradiation Facility (IFMIF) equipped with an accelerator-driven-type neutron source for developing fusion reactor materials. This prototype accelerator is a deuteron linear accelerator consisting of an injector, an RFQ, a superconducting linac and their auxiliaries. It aims to produce a CW D beam with the energy and current of 9 MeV/125 mA. The injector test was completed at CEA/Saclay in 2012 for producing a CW H beam and a CW D beam with the energy and current of 100 keV/140 mA. After the beam test at CEA/Saclay, the injector was transported to the International Fusion Energy Research Centre (IFERC) located in Rokkasho, Aomori, Japan. In the end of 2013, installation of the injector was started at IFERC for the injector beam test beginning from summer 2014 in order to obtain better beam qualities to be satisfied with the injection and acceleration of the following accelerators. In this paper, some results of the injector beam test performed at CEA/Saclay and the status quo of the installation of the injector at IFERC are presented.
Maebara, Sunao; Antonio, P.*; Ichikawa, Masahiro; Takahashi, Hiroki; Suzuki, Hiromitsu; Sugimoto, Masayoshi
Proceedings of 10th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.561 - 563, 2014/06
no abstracts in English
Takahashi, Hiroki; Maebara, Sunao; Sakaki, Hironao; Ichikawa, Masahiro; Suzuki, Hiromitsu; Sugimoto, Masayoshi
Progress in Nuclear Science and Technology (Internet), 4, p.261 - 263, 2014/04
An development of accelerator-based neutron irradiation facility is planning to develop materials for a demonstration fusion reactor. To obtain a 14 MeV neutron energy using the neutron-generating D-Li stripping reaction, an injection into liquid lithium flow by a 40 MeV deuteron beam is employed in IFMIF design concept. In the acceleration of deuteron beam, the activation due to the beam loss is critical issue. The activation analyses for the air in an accelerator vault are carried out by PHITS code and DCHAIN code using the experimental data for deuteron induced thick target neutron yield at 5 MeV and 9 MeV for source term.
Maebara, Sunao; Palmieri, A.*; Mereu, P.*; Ichikawa, Masahiro; Takahashi, Hiroki; Comunian, M.*; Suzuki, Hiromitsu; Pisent, A.*; Sugimoto, Masayoshi
Fusion Engineering and Design, 88(9-10), p.2740 - 2743, 2013/10
Times Cited Count:3 Percentile:25.59(Nuclear Science & Technology)Takahashi, Hiroki; Maebara, Sunao; Sakaki, Hironao; Suzuki, Hiromitsu; Sugimoto, Masayoshi
JAEA-Conf 2013-002, p.109 - 112, 2013/10
Shinto, Katsuhiro; Vermare, C.*; Asahara, Hiroo; Sugimoto, Masayoshi; Garin, P.*; Maebara, Sunao; Takahashi, Hiroki; Sakaki, Hironao; Kojima, Toshiyuki; Ohira, Shigeru; et al.
Proceedings of 6th Annual Meeting of Particle Accelerator Society of Japan (CD-ROM), p.668 - 670, 2010/03
Progress of the IFMIF/EVEDA prototype accelerator in fiscal year of 2008 is described. All the sub-systems of the prototype accelerator have started to design, settled the plan of the manufacturing and component tests and fixed the design parameters. As a result of the analysis of planning for the engineering validation of the IFMIF accelerator system, the project duration to be prolonged to the end of 2014 including some months for contingency was approved by the BA Steering Committee. In this article, the design status of each accelerator component, the interface between the accelerator components and the IFMIF/EVEDA Accelerator Building settled in International Fusion Energy Research Centre (IFERC) in Rokkasho and the proposed accelerator commissioning plan for the engineering validation will be presented.
Takahashi, Kenji*; Sakai, Shingo*; Tezuka, Hiroaki*; Hiejima, Yusuke*; Katsumura, Yosuke; Watanabe, Masayoshi*
Journal of Physical Chemistry B, 111(18), p.4807 - 4811, 2007/05
Times Cited Count:41 Percentile:68.9(Chemistry, Physical)Sato, Kazuyoshi; Uehara, Masaharu*; Tamura, Kosaku*; Hashimoto, Masayoshi*; Ogino, Shunji*; Yagenji, Akira; Nagamatsu, Nobuhide*; Sekiya, Shigeki*; Takahashi, Hideo*; Motohashi, Keiichi*; et al.
JAEA-Technology 2006-024, 114 Pages, 2006/03
no abstracts in English
Sato, Kazuyoshi; Hashimoto, Masayoshi*; Nagamatsu, Nobuhide*; Yagenji, Akira; Sekiya, Shigeki*; Takahashi, Hideo*; Motohashi, Keiichi*; Ogino, Shunji*; Kataoka, Takahiro*; Ohashi, Hironori*; et al.
JAEA-Technology 2006-006, 587 Pages, 2006/03
no abstracts in English
Kimura, Hiromi*; Sasaki, Masayoshi*; Morimoto, Yasutomi*; Takeda, Tsuyoshi*; Kodama, Hiroshi*; Yoshikawa, Akira*; Oyaizu, Makoto*; Takahashi, Koji; Sakamoto, Keishi; Imai, Tsuyoshi; et al.
Journal of Nuclear Materials, 337-339, p.614 - 618, 2005/03
Times Cited Count:7 Percentile:44.84(Materials Science, Multidisciplinary)no abstracts in English
Sasaki, Masayoshi*; Morimoto, Yasutomi*; Kimura, Hiromi*; Takahashi, Koji; Sakamoto, Keishi; Imai, Tsuyoshi; Okuno, Kenji*
Journal of Nuclear Materials, 329-333(Part1), p.899 - 903, 2004/08
A CVD diamond has been the reference material of a torus widow for a rf heating system in a fusion reactor. Since the window is in the circumstance of tritium, helium and radio activated dust, it is important to elucidate the effect of ions on chemical structure of the diamond, existing states of tritium and tritium inventory. Polycrystalline CVD diamond disks(=10.0mm, t=0.21mm) used in this study are the same grade as rf windows. After sputtering the surface with 1.0 keV Ar to remove oxygen impurity, the sample was irradiated with deuterium (D) or helium ions (He) at an angle of 0 degrees to the surface normal. The irradiation energies of deuterium and helium are 0.25 keV D and 0.45 keV He, respectively. The structural change of the irradiated sample was measured by X-ray Photoelectron Spectroscopy (XPS) technique. The C1s peak shift toward lower binding energy side was observed when deuterium ions irradiated. This result indicates that the diamond changes to amorphous carbon due to formation of C-D bond.
Sasaki, Masayoshi*; Morimoto, Yasutomi*; Kimura, Hiromi*; Takahashi, Koji; Sakamoto, Keishi; Imai, Tsuyoshi; Okuno, Kenji*
Journal of Nuclear Materials, 329-333(1), p.899 - 903, 2004/08
Times Cited Count:4 Percentile:29.18(Materials Science, Multidisciplinary)no abstracts in English
Nakashima, Hiroshi; Takada, Hiroshi; Kasugai, Yoshimi; Meigo, Shinichiro; Maekawa, Fujio; Kai, Tetsuya; Konno, Chikara; Ikeda, Yujiro; Oyama, Yukio; Watanabe, Noboru; et al.
Proceedings of 6th Meeting of the Task Force on Shielding Aspects of Accelerators, Targets and Irradiation Facilities (SATIF-6), (OECD/NEA No.3828), p.27 - 36, 2004/00
no abstracts in English
Nakashima, Hiroshi; Takada, Hiroshi; Kasugai, Yoshimi; Meigo, Shinichiro; Maekawa, Fujio; Kai, Tetsuya; Konno, Chikara; Ikeda, Yujiro; Oyama, Yukio; Watanabe, Noboru; et al.
Journal of Nuclear Science and Technology, 39(Suppl.2), p.1155 - 1160, 2002/08
no abstracts in English
Shimomura, Yasuo; Tsunematsu, Toshihide; Yamamoto, Shin; Maruyama, So; Mizoguchi, Tadanori*; Takahashi, Yoshikazu; Yoshida, Kiyoshi; Kitamura, Kazunori*; Ioki, Kimihiro*; Inoue, Takashi; et al.
Purazuma, Kaku Yugo Gakkai-Shi, 78(Suppl.), 224 Pages, 2002/01
no abstracts in English
Kubo, Takashi; Maebara, Sunao; Ohira, Shigeru; Takahashi, Hiroki; Yonemoto, Kazuhiro; Kojima, Toshiyuki; Kikuchi, Takayuki; Sakaki, Hironao; Kimura, Haruyuki; Okumura, Yoshikazu; et al.
no journal, ,
IFMIF/EVEDA Prototype Accelerator Building is a facility for validation of prototype accelerator which will be made for the Engineering Validation and Engineering Design Activity (EVEDA) of the International Fusion Material Irradiation Facility (IFMIF). This building is constructed the International Fusion Energy Research Center in Rokkasho village, Aomori prefecture, as a part of the Broader Approach activity which is an international cooperation between Japan and EU. The detail design was completed in 2007, and its construction work was started in March, 2008. The building is an one story, steel construction. The width of east-west is 58 m, north-south is 37 m, maximum height is 10.95 m, and floor area is 2019.5 m. The Accelerator Vault which made of concrete is in center of the building. The southern side is HVAC and cooling machines room, and the other side is Radio Frequebcy power supply area. Its underground was constructed in 2008, and the Accelerator Vault was constructed in May, 2009. Now, roofing work is doing. The building will be completed in May, 2010.