Refine your search:     
Report No.
 - 
Search Results: Records 1-20 displayed on this page of 74

Presentation/Publication Type

Initialising ...

Refine

Journal/Book Title

Initialising ...

Meeting title

Initialising ...

First Author

Initialising ...

Keyword

Initialising ...

Language

Initialising ...

Publication Year

Initialising ...

Held year of conference

Initialising ...

Save select records

Journal Articles

Development and validation of analysis code for spallation products behavior in LBE coolant system of ADS comparing with the distribution data in MEGAPIE spallation target

Miyahara, Shinya*; Arita, Yuji*; Nakano, Keita; Maekawa, Fujio; Sasa, Toshinobu; Obayashi, Hironari; Takei, Hayanori

Nuclear Engineering and Design, 403, p.112147_1 - 112147_17, 2023/03

 Times Cited Count:0 Percentile:0.01(Nuclear Science & Technology)

It is important to evaluate the inventories and the release and transport behavior of the spallation products (SPs) in the Lead-Bismuth Eutectic (LBE) coolant system of Accelerator Driven System (ADS) for the safety studies of the radiological hazard both in the cases of normal operation and accident. University of Fukui and JAEA have been developing the computer analysis code TRAIL (Transport of RAdionuclides In Liquid metal systems) which predicts the time dependent behavior of SPs within the LBE coolant system of ADS for the wide range of operational events. The source term of both radioactive and stable SPs in the LBE coolant is given as input and the radioactive decay chain model for the radioactive SPs is implemented in the code to evaluate the effect of precursors on the SPs mobility. This paper presents the recent advancement status of the code development and the validation results comparing with the distribution data of volatile SPs in MEGAPIE spallation target.

Journal Articles

Investigation of random beam trips in a linear accelerator at the Japan Proton Accelerator Research Complex for the development of an accelerator-driven nuclear transmutation system

Takei, Hayanori

Journal of Nuclear Science and Technology, 14 Pages, 2023/00

 Times Cited Count:0 Percentile:0.18(Nuclear Science & Technology)

In the proton linear accelerator (linac), the proton beam is unexpectedly interrupted due to the electrical discharge originating from the radio frequency, failure of the device/equipment, or other factors. Do these beam trips occur randomly? Conventionally, it has been implicitly assumed that beam trips occur randomly. In this study, we investigated whether beam trips in the linac of the Japan Proton Accelerator Research Complex (J-PARC) occur randomly to estimate the beam trip frequency in a superconducting proton linac for an accelerator-driven nuclear transmutation system. First, the J-PARC linac was classified into five subsystems. Then, the reliability function for the operation time in each subsystem was obtained using the Kaplan--Meier estimation, a reliability engineering methods. Using this reliability function, the randomness of beam trips was examined. Analysis of five-year operational data for five subsystems of the J-PARC linac showed that beam trips occurred randomly in some subsystems. However, beam trips did not occur randomly in many subsystems of the proton linac, including the ion source and the acceleration cavity, the primary subsystems of the proton linac.

Journal Articles

R&D on Accelerator Driven Nuclear Transmutation System (ADS) at J-PARC, 2; Transmutation Experimental Facility at J-PARC

Maekawa, Fujio; Takei, Hayanori

Purazuma, Kaku Yugo Gakkai-Shi, 98(5), p.206 - 210, 2022/05

In developing an accelerator-driven nuclear transmutation system (ADS), it is necessary to solve technical issues related to proton beams, such as the development of materials that can withstand high-intensity proton beams and the characterization of subcritical cores driven by proton beams. Therefore, at the high-intensity proton accelerator facility J-PARC, a transmutation experimental facility that actually conducts various tests using a high-intensity proton beam is being planned. This paper introduces the outline and future direction of the transmutation experimental facility.

Journal Articles

R&D on Accelerator Driven Nuclear Transmutation System (ADS) at J-PARC, 5; Research and developments of a superconducting linac for ADS

Kondo, Yasuhiro; Takei, Hayanori; Yee-Rendon, B.; Tamura, Jun

Purazuma, Kaku Yugo Gakkai-Shi, 98(5), p.222 - 226, 2022/05

A superconducting accelerating cavity is indispensable to realize a driver linac that meets the requirements of ADS. The low-energy section of the accelerators, which is normal conducting one, was redesigned to reflect the recent progress in the development of superconducting accelerator cavities. In addition, we are developing a prototype cavity for the spoke-type cavity that has not been developed well. This section reports on the latest research and development of ADS linacs at the Japan Atomic Energy Agency.

Journal Articles

Development of proton beam control technology for transmutation characteristic test

Takei, Hayanori

Isotope News, (779), p.11 - 15, 2022/02

The Japan Atomic Energy Agency (JAEA) has designed a Transmutation Physics Experimental Facility (TEF-P) as an experimental facility in the Japan Proton Accelerator Research Complex (J-PARC). The TEF-P is a critical assembly driven by a low-power proton beam, a maximum of 10 W, which is extracted from a high-power beam source, such as 250 kW of 400 MeV proton beam of the J-PARC Linac. To extract such a low-power proton beam from the high-power proton beam, we developed a laser charge exchange (LCE) device and employed its technique, which is one of the non-contact beam extraction techniques. For the proof of performance of the LCE device to the TEF-P, a low-power proton beam was extracted using a negative-hydrogen Linac having an energy of 3 MeV, and a bright laser. This paper summarizes the experimental results.

Journal Articles

Fast fault recovery scenarios for the JAEA-ADS linac

Yee-Rendon, B.; Tamura, Jun; Kondo, Yasuhiro; Nakano, Keita; Takei, Hayanori; Maekawa, Fujio; Meigo, Shinichiro

Proceedings of 18th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.61 - 65, 2021/10

Japan Atomic Energy Agency (JAEA) is designing a 30 MW CW superconducting proton linac as a major component for the accelerator-driven subcritical system (ADS) project. The main challenge of the linac operation is the high reliability required to suppress thermal stress in the subcritical reactor. To this end, we implemented fault compensation schemes to enable a fast beam recovery; consequently, reducing the beam trip duration. This work presents strategies to increase the fault-tolerance capacity of the JAEA-ADS linac.

Journal Articles

Low-power proton beam extraction by the bright continuous laser using the 3-MeV negative-hydrogen linac in Japan Proton Accelerator Research Complex

Takei, Hayanori; Tsutsumi, Kazuyoshi*; Meigo, Shinichiro

Journal of Nuclear Science and Technology, 58(5), p.588 - 603, 2021/05

 Times Cited Count:0 Percentile:0.01(Nuclear Science & Technology)

The Japan Atomic Energy Agency (JAEA) has designed a Transmutation Physics Experimental Facility (TEF-P) as an experimental facility in the Japan Proton Accelerator Research Complex (J-PARC). The TEF-P is a critical assembly driven by a low-power proton beam, a maximum of 10 W, which is extracted from a high-power beam source, such as 250 kW of 400 MeV proton beam of the J-PARC Linac. To extract such a low-power proton beam from the high-power proton beam, we developed a laser charge exchange (LCE) device and employed its technique, which is one of the non-contact beam extraction techniques. For the proof of performance of the LCE device to the TEF-P, a low-power proton beam was extracted using a negative-hydrogen (H$$^{-}$$) Linac having an energy of 3 MeV, and a bright continuous laser. Proton beam with the power of 0.57 mW was successfully extracted with a laser stripping efficiency of $$2.3times10^{-5}$$. These experimental values are in good agreement with the estimated ones.

Journal Articles

Long beam pulse extraction by the laser charge exchange method using the 3-MeV linac in J-PARC

Takei, Hayanori; Hirano, Koichiro; Meigo, Shinichiro; Tsutsumi, Kazuyoshi*

Proceedings of 8th International Beam Instrumentation Conference (IBIC 2019) (Internet), p.595 - 599, 2020/06

Japan Proton Accelerator Research Complex (J-PARC) has a plan to build the Transmutation Physics Experimental Facility (TEF-P), in which a 400-MeV proton beam will be delivered from negative hydrogen (H$$^{-}$$) accelerated by the linac. Since the TEF-P requires a stable proton beam with a power of less than 10 W, a steady and meticulous beam extraction method is required to extract a small amount of the proton beam from the high power beam using 250 kW. To fulfill this requirement, we have developed beam extraction based on the Laser Charge Exchange (LCE) method. For the demonstration present beam extraction technique, an experiment was conducted using H$$^{-}$$ beam accelerated by the 3-MeV linac at RFQ test-stand in J-PARC. As a result of the experiment with continuous wave (CW) of the Laser, a charge-exchanged long-pulsed H$$^{+}$$ beam with a power of about 0.70 W equivalent was successfully obtained under the TEF-P beam condition.

Journal Articles

Development of profile monitors on target for high-intensity proton accelerators

Meigo, Shinichiro; Takei, Hayanori; Matsuda, Hiroki; Yuri, Yosuke*; Yuyama, Takahiro*

Proceedings of 16th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.515 - 519, 2019/07

no abstracts in English

Journal Articles

Investigations of accelerator reliability and decay heat removal for accelerator-driven system

Sugawara, Takanori; Takei, Hayanori; Tsujimoto, Kazufumi

Annals of Nuclear Energy, 125, p.242 - 248, 2019/03

 Times Cited Count:2 Percentile:21.58(Nuclear Science & Technology)

To realize the feasible accelerator-driven system (ADS) concept, the investigations for the reliable accelerator and conceptual plant design considering safety issues were performed. As the reliable accelerator concept, the double-accelerator concept was proposed to reduce the beam-trip frequency. The estimated beam-trip frequency with the double-accelerator concept using the J-PARC LINAC operation data showed that the beam-trip frequency was significantly improved with the comparison of the single accelerator result. The basic investigation of the primary reactor auxiliary coolant system (PRACS) was performed for the safety design of the LBE cooled ADS. The concept which the PRACS heat exchanger was integrated to the steam generator was proposed and the transient analysis in the loss of heat sink accident was carried out. The result presented that the decay heat removal was appropriate when the operation of the PRACS succeeded.

Journal Articles

Evaluation of mean time between accidental interruptions for accelerator klystron systems based on the reliability engineering method

Takei, Hayanori; Furukawa, Kazuro*; Yano, Yoshiharu*; Ogawa, Yujiro*

Journal of Nuclear Science and Technology, 55(9), p.996 - 1008, 2018/09

 Times Cited Count:2 Percentile:20.93(Nuclear Science & Technology)

Experiences with existing high-power proton accelerators indicate that frequent beam trips are inevitable. One of the reasons for such frequent beam trips is the accidental interruption to protect accelerators against fatal failures. Generally, the failure frequency for the general machinery can be evaluated based on a reliability database for its components. On the other hand, the beam-trip frequency for the accidental interruption was not evaluated based on the reliability database because it has not yet been established. A principal reason for the lack of this reliability database is the inconsistency of data collection and analysis methods among laboratories. For example, there are at least three methods to estimate Mean Time Between accidental Interruptions (MTBI) for klystron systems. In the present study, the MTBI of the klystron systems of an electron/positron injector linac at the High Energy Accelerator Research Organization (KEK) was evaluated based on the reliability engineering method, in order to build the reliability database using the unified data collection and analysis method. As the result, the mean values of the MTBI by the traditional three methods were evaluated as 30.9, 32.0, and 50.4 hours. On the other hand, that by the reliability engineering method was evaluated as 57.3 hours, i.e., more than 1.14 times of the traditional results. Although these results are obviously different from traditional results, it appears that the present estimation based on the reliability engineering method is suitable for the MTBI of accelerator components as typified by the klystron system.

Journal Articles

Development of profile monitors on target for high-intensity proton accelerators

Meigo, Shinichiro; Takei, Hayanori; Matsuda, Hiroki; Yuri, Yosuke*; Yuyama, Takahiro*

Proceedings of 15th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.1035 - 1039, 2018/08

no abstracts in English

Journal Articles

Research and development activities for accelerator-driven system in JAEA

Sugawara, Takanori; Takei, Hayanori; Iwamoto, Hiroki; Oizumi, Akito; Nishihara, Kenji; Tsujimoto, Kazufumi

Progress in Nuclear Energy, 106, p.27 - 33, 2018/07

 Times Cited Count:16 Percentile:85.18(Nuclear Science & Technology)

The Japan Atomic Energy Agency (JAEA) has investigated an accelerator-driven system (ADS) to transmute minor actinides which will be partitioned from the high level waste. There are various inherent issues for the research and development on the ADS. The recent two activities to realize a feasible and reliable ADS concept are introduced in this paper. For the feasibility, the design of a beam window which is a boundary of the accelerator and the subcritical core, is one of the most important issues. To mitigate the design condition of the beam window, namely to reduce the proton beam current, the subcritical core concept with subcriticality adjustment rods were investigated. For the reliability, the beam-trip is the inherent and serious issue for the ADS design because it induces rapid temperature change to coolant and structures in the subcritical core. To improve the beam-trip frequencies, a double-accelerator concept was proposed and its beam-trip frequency was estimated.

Journal Articles

Target test facility for ADS and cross-section experiment in J-PARC

Meigo, Shinichiro; Iwamoto, Hiroki; Matsuda, Hiroki; Takei, Hayanori

Journal of Physics; Conference Series, 1021(1), p.012072_1 - 012072_4, 2018/06

 Times Cited Count:0 Percentile:0.11(Nuclear Science & Technology)

no abstracts in English

Journal Articles

Beam extraction by the laser charge exchange method using the 3-MeV LINAC in J-PARC

Takei, Hayanori; Hirano, Koichiro; Tsutsumi, Kazuyoshi; Meigo, Shinichiro

Plasma and Fusion Research (Internet), 13(Sp.1), p.2406012_1 - 2406012_6, 2018/03

The Japan Proton Accelerator Research Complex (J-PARC) has a plan to build the Transmutation Physics Experimental Facility (TEF-P), in which a 400-MeV negative proton (H$$^{-}$$) beam will be delivered from the J-PARC linac. Since the TEF-P requires a stable proton beam with a power of less than 10 W, a stable and meticulous beam extraction method is required to extract a small amount of the proton beam from the high power beam using 250 kW. To fulfil this requirement, the Laser Charge Exchange (LCE) method has been developed. To demonstrate the charge exchange of the H$$^{-}$$, a preliminary LCE experiment was conducted using a linac with energy of 3 MeV in J-PARC. As a result of the experiment, a charge-exchanged H$$^{+}$$ beam with a power of about 8 W equivalent and an accuracy of about 2% was obtained under the J-PARC linac beam condition.

Journal Articles

Beam extraction by the laser charge exchange method using the 3-MeV linac in J-PARC

Takei, Hayanori; Hirano, Koichiro; Meigo, Shinichiro; Tsutsumi, Kazuyoshi*

Proceedings of 6th International Beam Instrumentation Conference (IBIC 2017) (Internet), p.435 - 439, 2018/03

The Japan Proton Accelerator Research Complex (J-PARC) has a plan to build the Transmutation Physics Experimental Facility (TEF-P), in which a 400-MeV negative proton (H$$^{-}$$) beam will be delivered from the J-PARC linac. Since the TEF-P requires a stable proton beam with a power of less than 10 W, a stable and meticulous beam extraction method is required to extract a small amount of the proton beam from the high power beam using 250 kW. To fulfil this requirement, the Laser Charge Exchange (LCE) method has been developed. To demonstrate the charge exchange of the H$$^{-}$$, a preliminary LCE experiment was conducted using a linac with energy of 3 MeV in J-PARC. As a result of the experiment, a charge-exchanged H$$^{+}$$ beam with a power of about 8 W equivalent and an accuracy of about 2% was obtained under the J-PARC linac beam condition.

Journal Articles

Profile monitor on target for spallation neutron source

Meigo, Shinichiro; Matsuda, Hiroki; Takei, Hayanori

Proceedings of 6th International Beam Instrumentation Conference (IBIC 2017) (Internet), p.373 - 376, 2018/03

no abstracts in English

Journal Articles

A 3 MeV linac for development of accelerator components at J-PARC

Kondo, Yasuhiro; Asano, Hiroyuki*; Chishiro, Etsuji; Hirano, Koichiro; Ishiyama, Tatsuya; Ito, Takashi; Kawane, Yusuke; Kikuzawa, Nobuhiro; Meigo, Shinichiro; Miura, Akihiko; et al.

Proceedings of 28th International Linear Accelerator Conference (LINAC 2016) (Internet), p.298 - 300, 2017/05

We have constructed a linac for development of various accelerator components at J-PARC. The ion source is same as the J-PARC linac's, and the RFQ is a used one in the J-PARC linac. The beam energy is 3 MeV and nominal beam current is 30 mA. The accelerator has been already commissioned, and the first development program, laser-charge-exchange experiment for the transmutation experimental facility, has been started. In this paper, present status of this 3-MeV linac is presented.

Journal Articles

Present status of the laser charge exchange test using the 3-MeV linac in J-PARC

Takei, Hayanori; Chishiro, Etsuji; Hirano, Koichiro; Kondo, Yasuhiro; Meigo, Shinichiro; Miura, Akihiko; Morishita, Takatoshi; Oguri, Hidetomo; Tsutsumi, Kazuyoshi

Proceedings of 5th International Beam Instrumentation Conference (IBIC 2016) (Internet), p.736 - 739, 2017/03

The Accelerator-driven System (ADS) is one of the candidates for transmuting long-lived nuclides, such as minor actinide (MA), produced by nuclear reactors. For efficient transmutation of the MA, a precise pre-diction of neutronics of ADS is required. In order to obtain the neutronics data for the ADS, the Japan Pro-ton Accelerator Research Complex (J-PARC) has a plan to build the Transmutation Physics Experimental Facility (TEF-P), in which a 400-MeV negative proton (H$$^{-}$$) beam will be delivered from the J-PARC linac. Since the TEF-P requires a stable proton beam with a power of less than 10W, a stable and meticulous beam extraction method is required to extract a small amount of the proton beam from the high power beam using 250kW. To fulfil this requirement, the Laser Charge Exchange (LCE) method has been developed. The LCE strips the electron of the H$$^{-}$$ beam and neutral protons will separate at the bending magnet in the proton beam transport. To demonstrate the charge exchange of the H$$^{-}$$, a preliminary LCE experiment was conducted using a linac with energy of 3MeV in J-PARC. As a result of the experiment, a charge-exchanged H$$^{+}$$ beam with a power of about 5W equivalent was obtained under the J-PARC linac beam condition, and this value almost satisfied the power requirement of the proton beam for the TEF-P.

Journal Articles

Development of a control system at a 3 MeV linac in J-PARC

Sawabe, Yuki*; Ishiyama, Tatsuya; Takahashi, Daisuke; Kato, Yuko; Suzuki, Takahiro*; Hirano, Koichiro; Takei, Hayanori; Meigo, Shinichiro; Kikuzawa, Nobuhiro; Hayashi, Naoki

Proceedings of 13th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.647 - 651, 2016/11

In the J-PARC, a 3 MeV linac has been developed for the tests of beam scraper irradiation and charge exchange by high-power laser. To accomplish tests efficiently and safely, the control system for 3 MeV was designed and developed, and this system consists of four subsystems, personal protection system, machine protection system, timing system, and remote control system using the EPICS. In this paper, the details of control system for a 3 MeV linac are presented.

74 (Records 1-20 displayed on this page)