Refine your search:     
Report No.
 - 
Search Results: Records 1-20 displayed on this page of 46

Presentation/Publication Type

Initialising ...

Refine

Journal/Book Title

Initialising ...

Meeting title

Initialising ...

First Author

Initialising ...

Keyword

Initialising ...

Language

Initialising ...

Publication Year

Initialising ...

Held year of conference

Initialising ...

Save select records

JAEA Reports

Annual report on the environmental radiation monitoring around the Tokai Reprocessing Plant FY2022

Kokubun, Yuji; Nakada, Akira; Seya, Natsumi; Koike, Yuko; Nemoto, Masashi; Tobita, Keiji; Yamada, Ryohei*; Uchiyama, Rei; Yamashita, Daichi; Nagai, Shinji; et al.

JAEA-Review 2023-046, 164 Pages, 2024/03

JAEA-Review-2023-046.pdf:4.2MB

The Nuclear Fuel Cycle Engineering Laboratories conducts environmental radiation monitoring around the reprocessing plant in accordance with the "Safety Regulations for Reprocessing Plant of JAEA, Part IV: Environmental Monitoring". This report summarizes the results of environmental radiation monitoring conducted during the period from April 2022 to March 2023 and the results of dose calculations for the surrounding public due to the release of radioactive materials into the atmosphere and ocean. In the results of the above environmental radiation monitoring, many items were affected by radioactive materials emitted from the accident at the Fukushima Daiichi Nuclear Power Plant of Tokyo Electric Power Company, Incorporated (changed to Tokyo Electric Power Company Holdings, Inc. on April 1, 2016), which occurred in March 2011. Also included as appendices are an overview of the environmental monitoring plan, an overview of measurement methods, measurement results and their changes over time, meteorological statistics results, radioactive waste release status, and an evaluation of the data which deviated of the normal range.

Journal Articles

Heterogeneity effects in micro-beam XRF scanning spectroscopy of binary powdered mixtures and lake sediments

Katsuta, Nagayoshi*; Umemura, Ayako*; Naito, Sayuri*; Masuki, Yuma*; Itayama, Yui*; Niwa, Masakazu; Shirono, Shinichi*; Yoshida, Hidekazu*; Kawakami, Shinichi*

Spectrochimica Acta, Part B, 210, p.106817_1 - 106817_11, 2023/12

 Times Cited Count:0 Percentile:0.02(Spectroscopy)

X-ray fluorescence (XRF) scanning of lacustrine sediments has been used to extend the approach to a wider range of elemental records in both ages and timescales of variations in past environments and climates. However, one of severe problems with effects of the XRF intensity by grain size and mineralogical composition known as "heterogeneity effects" have been pointed out. This study investigated the heterogeneity effect of Fe intensities on X-ray beam using several binary powder mixtures and lacustrine sediment cores.

JAEA Reports

Annual report on the environmental radiation monitoring around the Tokai Reprocessing Plant FY2021

Nakada, Akira; Kanai, Katsuta; Seya, Natsumi; Nishimura, Shusaku; Futagawa, Kazuo; Nemoto, Masashi; Tobita, Keiji; Yamada, Ryohei*; Uchiyama, Rei; Yamashita, Daichi; et al.

JAEA-Review 2022-078, 164 Pages, 2023/03

JAEA-Review-2022-078.pdf:2.64MB

Environmental radiation monitoring around the Tokai Reprocessing Plant has been performed by the Nuclear Fuel Cycle Engineering Laboratories, based on "Safety Regulations for the Reprocessing Plant of Japan Atomic Energy Agency, Chapter IV - Environmental Monitoring". This annual report presents the results of the environmental monitoring and the dose estimation to the hypothetical inhabitant due to the radioactivity discharged from the plant to the atmosphere and the sea during April 2021 to March 2022. In this report, some data include the influence of the accidental release from the Fukushima Daiichi Nuclear Power Station of Tokyo Electric Power Co., Inc. (the trade name was changed to Tokyo Electric Power Company Holdings, Inc. on April 1, 2016) in March 2011. Appendices present comprehensive information, such as monitoring programs, monitoring methods, monitoring results and their trends, meteorological data and discharged radioactive wastes. In addition, the data which were influenced by the accidental release and exceeded the normal range of fluctuation in the monitoring, were evaluated.

JAEA Reports

Annual report on the environmental radiation monitoring around the Tokai Reprocessing Plant FY2020

Nakada, Akira; Nakano, Masanao; Kanai, Katsuta; Seya, Natsumi; Nishimura, Shusaku; Nemoto, Masashi; Tobita, Keiji; Futagawa, Kazuo; Yamada, Ryohei; Uchiyama, Rei; et al.

JAEA-Review 2021-062, 163 Pages, 2022/02

JAEA-Review-2021-062.pdf:2.87MB

Environmental radiation monitoring around the Tokai Reprocessing Plant has been performed by the Nuclear Fuel Cycle Engineering Laboratories, based on "Safety Regulations for the Reprocessing Plant of Japan Atomic Energy Agency, Chapter IV - Environmental Monitoring". This annual report presents the results of the environmental monitoring and the dose estimation to the hypothetical inhabitant due to the radioactivity discharged from the plant to the atmosphere and the sea during April 2020 to March 2021. In this report, some data include the influence of the accidental release from the Fukushima Daiichi Nuclear Power Station of Tokyo Electric Power Co., Inc. (the trade name was changed to Tokyo Electric Power Company Holdings, Inc. on April 1, 2016) in March 2011. Appendices present comprehensive information, such as monitoring programs, monitoring methods, monitoring results and their trends, meteorological data and discharged radioactive wastes. In addition, the data which were influenced by the accidental release and exceeded the normal range of fluctuation in the monitoring, were evaluated.

Journal Articles

Present status of JAEA-Tokai tandem accelerator

Matsuda, Makoto; Tayama, Hidekazu; Ishizaki, Nobuhiro; Kabumoto, Hiroshi; Nakamura, Masahiko; Kutsukake, Kenichi; Otokawa, Yoshinori; Asozu, Takuhiro; Matsui, Yutaka; Abe, Shinichi

Proceedings of 18th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.394 - 398, 2021/10

no abstracts in English

Journal Articles

Present status of JAEA-Tokai tandem accelerator

Matsuda, Makoto; Ishizaki, Nobuhiro; Tayama, Hidekazu; Kabumoto, Hiroshi; Nakamura, Masahiko; Kutsukake, Kenichi; Otokawa, Yoshinori; Asozu, Takuhiro; Matsui, Yutaka; Abe, Shinichi; et al.

Proceedings of 17th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.948 - 952, 2020/09

no abstracts in English

Journal Articles

Present status of JAEA-Tokai tandem accelerator

Matsuda, Makoto; Osa, Akihiko; Ishizaki, Nobuhiro; Tayama, Hidekazu; Kabumoto, Hiroshi; Nakamura, Masahiko; Kutsukake, Kenichi; Otokawa, Yoshinori; Asozu, Takuhiro; Matsui, Yutaka; et al.

Proceedings of 16th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.1270 - 1273, 2019/07

The JAEA-Tokai tandem accelerator was operated over a total of 138 days, and delivered 16 different ions to the experiments in the research fields of nuclear physics, nuclear chemistry, atomic physics, solid state physics and radiation effects in material in FY2018. Maximum acceleration voltage was 16.6 MV. A new beam attenuator was installed at the entrance beam line of the tandem accelerator to facilitate control of the beam current and minimize stripper foil consumption. The main maintenance items included replacing the pellet chain used for about 68,000 hours and the drive motor for the high voltage terminal generator used for about 9 years. A fault has occurred in the building's oxygen deficiency monitor. This paper describes the operational status of the accelerators and the major technical developments of our facility.

Journal Articles

The Present conditions of the acceleration voltage after the acceleration tube update

Matsuda, Makoto; Osa, Akihiko; Ishizaki, Nobuhiro; Tayama, Hidekazu; Nakanoya, Takamitsu; Kabumoto, Hiroshi; Nakamura, Masahiko; Kutsukake, Kenichi; Otokawa, Yoshinori; Asozu, Takuhiro

JAEA-Conf 2018-003, p.126 - 131, 2019/02

no abstracts in English

Journal Articles

Present status of JAEA-Tokai tandem accelerator

Matsuda, Makoto; Kabumoto, Hiroshi; Tayama, Hidekazu; Nakanoya, Takamitsu; Nakamura, Masahiko; Kutsukake, Kenichi; Otokawa, Yoshinori; Asozu, Takuhiro; Matsui, Yutaka; Ishizaki, Nobuhiro; et al.

Proceedings of 15th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.1271 - 1275, 2018/08

The JAEA-Tokai tandem accelerator was operated over a total of 64 days, and delivered 13 different ions to the experiments in the research fields of nuclear physics, nuclear chemistry, atomic physics, solid state physics and radiation effects in material in FY2017. After the vacuum accident occurred in December 2016 the accelerating voltage dropped to 12 MV. In order to remove dust and broken carbon foil in the accelerating tube, all 80 accelerator tubes were removed and rewashed. It took 4 months for cleaning and 2 months for reassembly. Therefore about 10 months were a maintenance period of an accelerator from February 2017. Along with the reconstruction of the accelerating tube, re-alignment of the accelerating tube was carried out. The operation resumed in December 2017 and it was possible to recover the maximum voltage to 17.4 MV without beam and 16.6 MV with beam with periodic conditioning work.

Journal Articles

Present status of JAEA-Tokai tandem accelerator

Kabumoto, Hiroshi; Osa, Akihiko; Ishizaki, Nobuhiro; Tayama, Hidekazu; Matsuda, Makoto; Nakanoya, Takamitsu; Nakamura, Masahiko; Kutsukake, Kenichi; Otokawa, Yoshinori; Asozu, Takuhiro

Proceedings of 14th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.1404 - 1408, 2017/12

The JAEA-Tokai tandem accelerator was operated over a total of 110 days, and delivered 22 different ions to the experiments in the research fields of nuclear physics, nuclear chemistry, atomic physics, solid state physics and radiation effects in material in FY2016. The damaged acceleration tubes by discharge were replaced with the spare tube at the regular maintenance period in March 2016, and the maximum accelerating voltage recovered to the 17 MV. However, an accident of vacuum breaking of all acceleration tubes was occurred in December, and accelerating voltage fell down to under 12 MV. Now, we are doing the maintenance to recover the performance of acceleration voltage. This paper describes the operational status of the accelerators and the major technical developments of our facility.

Journal Articles

Present status of JAEA-Tokai tandem accelerator and booster

Matsuda, Makoto; Osa, Akihiko; Ishizaki, Nobuhiro; Tayama, Hidekazu; Nakanoya, Takamitsu; Kabumoto, Hiroshi; Nakamura, Masahiko; Kutsukake, Kenichi; Otokawa, Yoshinori; Asozu, Takuhiro

Proceedings of 13th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.1413 - 1417, 2016/11

The tandem accelerator was operated over a total of 140 days and delivered 22 different ions to the experiments in the fields of nuclear physics, nuclear chemistry, atomic physics, solid state physics and radiation effects in material. Maximum accelerating voltage is keeping up 18 MV and there was used for ten days on this voltage. However, electric discharge was occurred frequently in December and accelerating voltage fell to 12 MV. The damaged acceleration tubes were replaced with the spare tube at the regular maintenance period in March. The superconducting booster was not operated. This paper describes the operational status of the accelerators and the major technical developments.

Journal Articles

Present status of JAEA-Tokai tandem accelerator and booster

Matsuda, Makoto; Osa, Akihiko; Abe, Shinichi; Ishizaki, Nobuhiro; Tayama, Hidekazu; Nakanoya, Takamitsu; Kabumoto, Hiroshi; Nakamura, Masahiko; Kutsukake, Kenichi; Otokawa, Yoshinori; et al.

Proceedings of 12th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.357 - 360, 2015/09

no abstracts in English

Journal Articles

The Failure example of the Tokai tandem accelerator

Matsuda, Makoto; Abe, Shinichi; Ishizaki, Nobuhiro; Tayama, Hidekazu; Nakanoya, Takamitsu; Kabumoto, Hiroshi; Nakamura, Masahiko; Kutsukake, Kenichi; Otokawa, Yoshinori; Asozu, Takuhiro; et al.

Dai-27-Kai Tandemu Kasokuki Oyobi Sono Shuhen Gijutsu No Kenkyukai Hokokushu, p.142 - 145, 2015/03

no abstracts in English

Journal Articles

Present status of JAEA-Tokai tandem accelerator and booster

Matsuda, Makoto; Osa, Akihiko; Abe, Shinichi; Ishizaki, Nobuhiro; Tayama, Hidekazu; Nakanoya, Takamitsu; Kabumoto, Hiroshi; Nakamura, Masahiko; Kutsukake, Kenichi; Otokawa, Yoshinori; et al.

Proceedings of 11th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.410 - 413, 2014/10

no abstracts in English

Journal Articles

Present status of JAEA-Tokai tandem accelerator and booster

Matsuda, Makoto; Osa, Akihiko; Abe, Shinichi; Ishizaki, Nobuhiro; Tayama, Hidekazu; Nakanoya, Takamitsu; Kabumoto, Hiroshi; Nakamura, Masahiko; Kutsukake, Kenichi; Otokawa, Yoshinori; et al.

Proceedings of 10th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.307 - 309, 2014/06

no abstracts in English

Journal Articles

Present status of JAEA-Tokai tandem accelerator and booster

Matsuda, Makoto; Abe, Shinichi; Ishizaki, Nobuhiro; Tayama, Hidekazu; Nakanoya, Takamitsu; Kabumoto, Hiroshi; Nakamura, Masahiko; Kutsukake, Kenichi; Otokawa, Yoshinori; Asozu, Takuhiro; et al.

Proceedings of 9th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.362 - 366, 2013/08

no abstracts in English

Journal Articles

The Earthquake-damage of the JAEA-Tokai tandem accelerator

Matsuda, Makoto; Osa, Akihiko; Abe, Shinichi; Ishizaki, Nobuhiro; Tayama, Hidekazu; Nakanoya, Takamitsu; Kabumoto, Hiroshi; Nakamura, Masahiko; Kutsukake, Kenichi; Otokawa, Yoshinori; et al.

Dai-24-Kai Tandemu Kasokuki Oyobi Sono Shuhen Gijutsu No Kenkyukai Hokokushu, p.51 - 54, 2011/07

no abstracts in English

Journal Articles

Present status of JAEA-Tokai tandem accelerator facility

Ishizaki, Nobuhiro; Ishii, Tetsuro; Abe, Shinichi; Hanashima, Susumu; Osa, Akihiko; Tayama, Hidekazu; Matsuda, Makoto; Nakanoya, Takamitsu; Kabumoto, Hiroshi; Nakamura, Masahiko; et al.

Dai-23-Kai Tandemu Kasokuki Oyobi Sono Shuhen Gijutsu No Kenkyukai Hokokushu, p.13 - 16, 2010/11

no abstracts in English

JAEA Reports

Operation and management of the high-pressure gas facility for the tandem accelerator; Maintenance, evaluation of the aging deterioration and action of reducing SF$$_{6}$$ gas emission

Tayama, Hidekazu; Nakanoya, Takamitsu; Otokawa, Yoshinori; Tsukihashi, Yoshihiro; Seki, Nobuo*; Onodera, Teruo*; Nisugi, Hikaru*

JAEA-Technology 2010-023, 42 Pages, 2010/09

JAEA-Technology-2010-023.pdf:4.81MB

The high-pressure gas facility for the tandem accelerator at nuclear science research institute is the facility to transfer SF$$_{6}$$ gas between the accelerator and gas storage tanks. The SF$$_{6}$$ gas is used to keep high voltage insulation of the tandem accelerator. This facility is one of the largest SF$$_{6}$$ gas handling facilities in research laboratories. This facility has been operated for 31 years. In addition to regular maintenance, we have evaluated the deterioration due to aging. SF$$_{6}$$ gas is regarded as a kind of green house gases that causes global warming and it is strongly required to reduce such gas emission into the atmosphere in recent years. In JAEA, the reduction of gas the emission is also an important problem. We have been continuously taking action for reducing the emission of SF$$_{6}$$ gas. In this article, we report the records of maintenance, evaluation of aging, and activity of reducing SF$$_{6}$$ gas emission.

Journal Articles

Present status of JAEA-Tokai tandem accelerator facility

Matsuda, Makoto; Ishii, Tetsuro; Tsukihashi, Yoshihiro; Hanashima, Susumu; Abe, Shinichi; Osa, Akihiko; Ishizaki, Nobuhiro; Tayama, Hidekazu; Nakanoya, Takamitsu; Kabumoto, Hiroshi; et al.

Dai-22-Kai Tandemu Kasokuki Oyobi Sono Shuhen Gijutsu No Kenkyukai Hokokushu, p.10 - 14, 2010/01

no abstracts in English

46 (Records 1-20 displayed on this page)