Refine your search:     
Report No.
 - 
Search Results: Records 1-20 displayed on this page of 151

Presentation/Publication Type

Initialising ...

Refine

Journal/Book Title

Initialising ...

Meeting title

Initialising ...

First Author

Initialising ...

Keyword

Initialising ...

Language

Initialising ...

Publication Year

Initialising ...

Held year of conference

Initialising ...

Save select records

Journal Articles

Structure and properties of amorphous magnesium carbonate, a key material for geological storage of carbon dioxide

Kyono, Atsushi*; Yamamoto, Genichiro*; Yoneda, Yasuhiro; Okada, Satoru*

Isotope News, (783), p.23 - 27, 2022/10

Mineral traps are attracting attention as an underground storage method for carbon dioxide. Carbon dioxide laden groundwater reacts with basalt to form magnesite. The formed magnesium carbonate phase varies in many ways, but we tried to clarify the structure because all of them pass through amorphous magnesium carbonate. Pair distribution function using high-energy X-ray diffraction revealed that amorphous magnesium carbonate has a structure similar to that of hydromagnesite. It can be said that it is a safe sequestration method as a carbon dioxide storage technology.

Journal Articles

Design and actual performance of J-PARC 3 GeV rapid cycling synchrotron for high-intensity operation

Yamamoto, Kazami; Kinsho, Michikazu; Hayashi, Naoki; Saha, P. K.; Tamura, Fumihiko; Yamamoto, Masanobu; Tani, Norio; Takayanagi, Tomohiro; Kamiya, Junichiro; Shobuda, Yoshihiro; et al.

Journal of Nuclear Science and Technology, 59(9), p.1174 - 1205, 2022/09

 Times Cited Count:3 Percentile:80.29(Nuclear Science & Technology)

In the Japan Proton Accelerator Research Complex, the purpose of the 3 GeV rapid cycling synchrotron (RCS) is to accelerate a 1 MW, high-intensity proton beam. To achieve beam operation at a repetition rate of 25 Hz at high intensities, the RCS was elaborately designed. After starting the RCS operation, we carefully verified the validity of its design and made certain improvements to establish a reliable operation at higher power as possible. Consequently, we demonstrated beam operation at a high power, namely, 1 MW. We then summarized the design, actual performance, and improvements of the RCS to achieve a 1 MW beam.

Journal Articles

Kinetics of the interfacial curing reaction for an epoxy-amine mixture

Yamaguchi, Ko*; Kawaguchi, Daisuke*; Miyata, Noboru*; Miyazaki, Tsukasa*; Aoki, Hiroyuki; Yamamoto, Satoru*; Tanaka, Keiji*

Physical Chemistry Chemical Physics, 24(36), p.21578 - 21582, 2022/09

JAEA Reports

Report of the design examination and the installation work for the radiation shield at the beam injection area in the 3 GeV synchrotron

Nakanoya, Takamitsu; Kamiya, Junichiro; Yoshimoto, Masahiro; Takayanagi, Tomohiro; Tani, Norio; Kotoku, Hirofumi*; Horino, Koki*; Yanagibashi, Toru*; Takeda, Osamu*; Yamamoto, Kazami

JAEA-Technology 2021-019, 105 Pages, 2021/11

JAEA-Technology-2021-019.pdf:10.25MB

Since a user operation startup, the 3 GeV synchrotron accelerator (Rapid-Cycling Synchrotron: RCS) gradually reinforced the beam power. As a result, the surface dose rate of the apparatus located at the beam injection area of the RCS, such as the magnet, vacuum chambers, beam monitors, etc., increases year by year. The beam injection area has many apparatuses which required manual maintenance, so reducing worker's dose is a serious issue. To solve this problem, we have organized a task force for the installation of the shield. The task force has aimed to optimize the structure of the radiation shield, construct the installation procedure with due consideration of the worker's dose suppression. As the examination result of the shield design, we have decided to adopt removal shielding that could be installed quickly and easily when needed. We carried out shield installation work during the 2020 summer maintenance period. The renewal work required to install the shielding has been carried out in a under high-dose environment. For this reason, reducing the dose of workers was an important issue. So, we carefully prepared the work plan and work procedure in advance. During the work period, we implemented various dose reduction measures and managed individual dose carefully. As a result, the dose of all workers could be kept below the predetermined management value. We had installed removal shielding at the beam injection area in the 2020 summer maintenance period. We confirmed that this shield can contribute to the reduction of the dose during work near the beam injection area. It was a large-scale work to occupy the beam injection area during almost of the summer maintenance period. However, it is considered very meaningful for dose suppression in future maintenance works.

Journal Articles

Neutron measurement in the accelerator tunnel of J-PARC Rapid Cycling Synchrotron

Yamamoto, Kazami; Hatakeyama, Shuichiro; Otsu, Satoru*; Matsumoto, Tetsuro*; Yoshimoto, Masahiro

Proceedings of 18th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.494 - 498, 2021/10

J-PARC 3 GeV Rapid Cycling Synchrotron (RCS) provides more than 700 kW proton beam to the neutron target. In order to investigate the influence of the radiation, we intend to evaluate the radiations such as the neutron and gamma-rays, which are generated due to the proton beam loss. If the amount of beam loss is excessive, it becomes difficult to identify the individual neutron and gamma ray. Therefore, we investigated the signal rate of the extraction point of RCS. Preliminary result indicated that we can enough distinguish the neutron and gamma-ray by the liquid scintillator.

Journal Articles

Radiation shielding installation for beam injection section of 3GeV synchrotron

Nakanoya, Takamitsu; Kamiya, Junichiro; Yoshimoto, Masahiro; Takayanagi, Tomohiro; Tani, Norio; Kotoku, Hirofumi*; Horino, Koki*; Yanagibashi, Toru*; Takeda, Osamu*; Yamamoto, Kazami

Proceedings of 18th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.238 - 242, 2021/10

Since a user operation startup, the 3GeV synchrotron accelerator (Rapid-Cycling Synchrotron: RCS) gradually reinforced the beam power. As a result, the surface dose rate of the apparatus located at the beam injection area of the RCS increases year by year. The beam injection area has many apparatuses which required manual maintenance, so reducing worker's dose is a serious issue. To solve this problem, we have decided to adopt removal shielding that could be installed quickly and easily when needed. We carried out shield installation work during the 2020 summer maintenance period. The installation work of the shield has been carried out in a under high-dose environment. For this reason, reducing the dose of workers was an important issue. So, we carefully prepared the work plan and work procedure in advance. During the work period, we implemented various dose reduction measures and managed individual dose carefully. As a result, the dose of all workers could be kept below the predetermined management value. We had installed removal shielding at the beam injection area in the 2020 summer maintenance period. We confirmed that this shield can contribute to the reduction of the dose during work near the beam injection area.

JAEA Reports

Report of summer holiday practical training 2020; Feasibility study on nuclear battery using HTTR core; Feasibility study for nuclear design, 3

Ishitsuka, Etsuo; Mitsui, Wataru*; Yamamoto, Yudai*; Nakagawa, Kyoichi*; Ho, H. Q.; Ishii, Toshiaki; Hamamoto, Shimpei; Nagasumi, Satoru; Takamatsu, Kuniyoshi; Kenzhina, I.*; et al.

JAEA-Technology 2021-016, 16 Pages, 2021/09

JAEA-Technology-2021-016.pdf:1.8MB

As a summer holiday practical training 2020, the feasibility study for nuclear design of a nuclear battery using HTTR core was carried out, and the downsizing of reactor core were studied by the MVP-BURN. As a result, it is clear that a 1.6 m radius reactor core, containing 54 (18$$times$$3 layers) fuel blocks with 20% enrichment of $$^{235}$$U, and BeO neutron reflector, could operate continuously for 30 years with thermal power of 5 MW. Number of fuel blocks of this compact core is 36% of the HTTR core. As a next step, the further downsizing of core by changing materials of the fuel block will be studied.

Journal Articles

Improved vacuum system for high-power proton beam operation of the rapid cycling synchrotron

Kamiya, Junichiro; Kotoku, Hirofumi*; Kurosawa, Shunta*; Takano, Kazuhiro; Yanagibashi, Toru*; Yamamoto, Kazami; Wada, Kaoru

Physical Review Accelerators and Beams (Internet), 24(8), p.083201_1 - 083201_23, 2021/08

 Times Cited Count:0 Percentile:0.02(Physics, Nuclear)

Through the operation of the vacuum system in J-PARC, it becomes evident that the high-power beam has more powerful effects on the vacuum system than expected. Those effects are the malfunction of vacuum equipment and the large pressure rise. The former is the failure of the turbomolecular pump (TMP) controller. The TMP itself is also damaged by a bearing crush due to a touch-down. We have developed a TMP controller that can connect with long cables of more than 200 m lengths to install the controller in a control room where there is no radiation influence. The TMP with high-strength bearing has been also developed. The latter is an extreme pressure rise with increasing the beam power. It is indicated that the pressure rise mechanism is a result of ion-stimulated gas desorption. It is finally confirmed that the dynamic pressure during the high-power beam is effectually suppressed by additionally installing the NEG pumps.

Journal Articles

Thermally altered subsurface material of asteroid (162173) Ryugu

Kitazato, Kohei*; Milliken, R. E.*; Iwata, Takahiro*; Abe, Masanao*; Otake, Makiko*; Matsuura, Shuji*; Takagi, Yasuhiko*; Nakamura, Tomoki*; Hiroi, Takahiro*; Matsuoka, Moe*; et al.

Nature Astronomy (Internet), 5(3), p.246 - 250, 2021/03

 Times Cited Count:30 Percentile:96.87(Astronomy & Astrophysics)

Here we report observations of Ryugu's subsurface material by the Near-Infrared Spectrometer (NIRS3) on the Hayabusa2 spacecraft. Reflectance spectra of excavated material exhibit a hydroxyl (OH) absorption feature that is slightly stronger and peak-shifted compared with that observed for the surface, indicating that space weathering and/or radiative heating have caused subtle spectral changes in the uppermost surface. However, the strength and shape of the OH feature still suggests that the subsurface material experienced heating above 300 $$^{circ}$$C, similar to the surface. In contrast, thermophysical modeling indicates that radiative heating does not increase the temperature above 200 $$^{circ}$$C at the estimated excavation depth of 1 m, even if the semimajor axis is reduced to 0.344 au. This supports the hypothesis that primary thermal alteration occurred due to radiogenic and/or impact heating on Ryugu's parent body.

Journal Articles

Development of ${it spatiotemporal}$ measurement and analysis techniques in X-ray photoelectron spectroscopy; From NAP-HARPES to 4D-XPS

Toyoda, Satoshi*; Yamamoto, Tomoki*; Yoshimura, Masashi*; Sumida, Hirosuke*; Mineoi, Susumu*; Machida, Masatake*; Yoshigoe, Akitaka; Suzuki, Satoru*; Yokoyama, Kazushi*; Ohashi, Yuji*; et al.

Vacuum and Surface Science, 64(2), p.86 - 91, 2021/02

We have developed ${it spatiotemporal}$ measurement and analysis techniques in X-ray photoelectron spectroscopy. To begin with, time-division depth profiles of gate stacked film interfaces have been achieved by NAP-HARPES (Near Ambient Pressure Hard X-ray Angle-Resolved Photo Emission Spectroscopy) data. We then have promoted our methods to quickly perform peak fittings and depth profiling from time-division ARPES data, which enables us to realize 4D-XPS analysis. It is found that the traditional maximum entropy method (MEM) combined with Jackknife averaging of sparse modeling in NAP-HARPES data is effective to perform dynamic measurement of depth profiles with high precision.

Journal Articles

Local structure investigations of accumulated damage in irradiated MgAl$$_{2}$$O$$_{4}$$

Yoshioka, Satoru*; Tsuruta, Konosuke*; Yamamoto, Tomokazu*; Yasuda, Kazuhiro*; Matsumura, Sho*; Sugiyama, Takeharu*; Oba, Yojiro; Ishikawa, Norito; Kobayashi, Eiichi*; Okudaira, Koji*

Journal of the American Ceramic Society, 103(8), p.4654 - 4663, 2020/08

 Times Cited Count:2 Percentile:17.37(Materials Science, Ceramics)

X-ray absorption near edge structure (XANES) and small-angle X-ray scattering (SAXS) reveal the damaged structures in MgAl$$_{2}$$O$$_{4}$$ spinel induced by swift heavy ions. SAXS indicates the formation of ion tracks with cylindrical shape with a diameter of 5 nm. XANES indicates the cationic disordering between tetrahedral and octahedral sites by the irradiation. Quantitative analysis of XANES also reveals that cations preferably occupy the octahedral sites at high fluence.

Journal Articles

New design of vacuum chambers for radiation shield installation at beam injection area of J-PARC RCS

Kamiya, Junichiro; Kotoku, Hirofumi; Shobuda, Yoshihiro; Takayanagi, Tomohiro; Yamamoto, Kazami; Yanagibashi, Toru*; Horino, Koki*; Miki, Nobuharu*

Journal of Physics; Conference Series, 1350, p.012172_1 - 012172_7, 2019/12

 Times Cited Count:0 Percentile:0.06

One of the issues in the J-PARC 3 GeV rapid cycling synchrotron is the high residual radiation dose around the beam injection point. A radiation shield is necessary to reduce radiation exposure of workers when maintenance is performed there. A space to install the radiation shield should be secured by newly designing a structure of the vacuum chamber at the injection point and the alumina ceramics beam pipes for the shift bump magnets. To make the space for the shield, the chamber is lengthened along the beam line and the cross-sectional shape is changed from circle to rectangle. The displacement and inner stress of the vacuum chamber due to atmospheric pressure were evaluated to be enough small by the calculation. For the ceramics beam pipe's rf-shield, the damping resistor was effective to reduce the induced modulation voltages by the pulsed magnetic field.

Journal Articles

The Surface composition of asteroid 162173 Ryugu from Hayabusa2 near-infrared spectroscopy

Kitazato, Kohei*; Milliken, R. E.*; Iwata, Takahiro*; Abe, Masanao*; Otake, Makiko*; Matsuura, Shuji*; Arai, Takehiko*; Nakauchi, Yusuke*; Nakamura, Tomoki*; Matsuoka, Moe*; et al.

Science, 364(6437), p.272 - 275, 2019/04

 Times Cited Count:233 Percentile:99.74(Multidisciplinary Sciences)

The near-Earth asteroid 162173 Ryugu, the target of Hayabusa2 sample return mission, is believed to be a primitive carbonaceous object. The Near Infrared Spectrometer (NIRS3) on Hayabusa2 acquired reflectance spectra of Ryugu's surface to provide direct measurements of the surface composition and geological context for the returned samples. A weak, narrow absorption feature centered at 2.72 micron was detected across the entire observed surface, indicating that hydroxyl (OH)-bearing minerals are ubiquitous there. The intensity of the OH feature and low albedo are similar to thermally- and/or shock-metamorphosed carbonaceous chondrite meteorites. There are few variations in the OH-band position, consistent with Ryugu being a compositionally homogeneous rubble-pile object generated from impact fragments of an undifferentiated aqueously altered parent body.

Journal Articles

New precise measurements of muonium hyperfine structure at J-PARC MUSE

Strasser, P.*; Abe, Mitsushi*; Aoki, Masaharu*; Choi, S.*; Fukao, Yoshinori*; Higashi, Yoshitaka*; Higuchi, Takashi*; Iinuma, Hiromi*; Ikedo, Yutaka*; Ishida, Katsuhiko*; et al.

EPJ Web of Conferences, 198, p.00003_1 - 00003_8, 2019/01

 Times Cited Count:13 Percentile:99.28

Journal Articles

Activation in injection area of J-PARC 3-GeV rapid cycling synchrotron and its countermeasures

Yamamoto, Kazami; Yamakawa, Emi*; Takayanagi, Tomohiro; Miki, Nobuharu*; Kamiya, Junichiro; Saha, P. K.; Yoshimoto, Masahiro; Yanagibashi, Toru*; Horino, Koki*; Nakanoya, Takamitsu; et al.

ANS RPSD 2018; 20th Topical Meeting of the Radiation Protection and Shielding Division of ANS (CD-ROM), 9 Pages, 2018/08

The existing beam power of the J-PARC Rapid Cycling Synchrotron is up to 500 kW, and higher radiation doses are concentrated in the injection area. These activations are caused by the interaction between the foil and the beam. To reduce dose exposure to workers near the injection point, we study a new design of the injection scheme. Experience has shown that eddy currents are generated in the metal flange near the magnet owing to the pulsed magnetic field, and the temperature exceeds 100 degrees C. The shield installed in the new injection system needs to have a layer structure, in which an insulator is inserted between iron shields to reduce the eddy current. From the results of the shielding calculation, even if 1 mm of polyethylene was inserted between two 9-mm-thick SUS 316 plates, which serve as shielding material, the shielding performance was reduced only about 5%, and we confirmed that it would function well.

Journal Articles

Upgrade of vacuum chamber at RCS beam injection area aimed at lower radiation and maintainability increase

Kamiya, Junichiro; Yamamoto, Kazami; Yanagibashi, Toru*; Sato, Atsushi*; Miki, Nobuharu*

Proceedings of 15th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.645 - 648, 2018/08

Surround of the beam injection point in the J-PARC 3 GeV Rapid Cycling Synchrotron is the area where the residual radioactive dose is higher than other areas due to the beam scattering by the charge stripping foil. However, there is very little space to install radiation shields around the vacuum chamber in the beam injection point. Furthermore, the vacuum leak has often occurred due to the heat expansion of the chamber flange due to the induced current by the nearby pulse magnet. To solve such problems for minimizing the radiation exposure of maintenance workers, the vacuum chamber rin the beam injection point was newly designed. The space for the radiation shields was created by lengthening and the changing the cross-sectional shape. The titanium alloy with high mechanical strength was used for the flange material so that the flange was able to be fastened with higher tightening torque.

Journal Articles

X-ray absorption near edge structure and first-principles spectral investigations of cationic disorder in MgAl$$_{2}$$O$$_{4}$$ induced by swift heavy ions

Yoshioka, Satoru*; Tsuruta, Konosuke*; Yamamoto, Tomokazu*; Yasuda, Kazuhiro*; Matsumura, Sho*; Ishikawa, Norito; Kobayashi, Eiichi*

Physical Chemistry Chemical Physics, 20(7), p.4962 - 4969, 2018/02

 Times Cited Count:5 Percentile:23.5(Chemistry, Physical)

Cationic disorder in the MgAl$$_{2}$$O$$_{4}$$ spinel induced by swift heavy ions was investigated using the X-ray absorption near edge structure. With changes in the irradiation fluences of 200 MeV Xe ions, the Mg K-edge and Al K-edge spectra were synchronously changed. The calculated spectra based on density function theory indicate that the change in the experimental spectra was due to cationic disorder between Mg in tetrahedral sites and Al in octahedral sites. These results suggest a high inversion degree to an extent that the completely random configuration is achieved in MgAl$$_{2}$$O$$_{4}$$ induced by the high density electronic excitation under swift heavy ion irradiation.

Journal Articles

SFCOMPO-2.0; An OECD NEA database of spent nuclear fuel isotopic assays, reactor design specifications, and operating data

Michel-Sendis, F.*; Gauld, I.*; Martinez, J. S.*; Alejano, C.*; Bossant, M.*; Boulanger, D.*; Cabellos, O.*; Chrapciak, V.*; Conde, J.*; Fast, I.*; et al.

Annals of Nuclear Energy, 110, p.779 - 788, 2017/12

 Times Cited Count:58 Percentile:99.17(Nuclear Science & Technology)

Journal Articles

A Failure investigation of the beam collimator system in the J-PARC 3 GeV rapid cycling synchrotron

Okabe, Kota; Yamamoto, Kazami; Kamiya, Junichiro; Takayanagi, Tomohiro; Yamamoto, Masanobu; Yoshimoto, Masahiro; Takeda, Osamu*; Horino, Koki*; Ueno, Tomoaki*; Yanagibashi, Toru*; et al.

Proceedings of 14th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.853 - 857, 2017/12

The most important issue is to reduce the uncontrolled beam loss in the high intensity hadron accelerator such as J-PARC proton accelerators. The J-PARC 3 GeV Synchrotron (RCS) has a collimator system which narrows a high intensity beam in the RCS. After startup of RCS in 2007, the collimator system of the RCS worked well. However, in April 2016, vacuum leakage at the collimator system occurred during the maintenance operation. To investigate a cause of the failure, we took apart iron shields of the collimator reducing exposed dose of operators. As a result of inspection, we succeeded to identify the cause of the vacuum leakage failure. In this presentation, we report the failure investigation of the beam collimator system in the RCS.

Journal Articles

New precise measurement of muonium hyperfine structure interval at J-PARC

Ueno, Yasuhiro*; Aoki, Masaharu*; Fukao, Yoshinori*; Higashi, Yoshitaka*; Higuchi, Takashi*; Iinuma, Hiromi*; Ikedo, Yutaka*; Ishida, Katsuhiko*; Ito, Takashi; Iwasaki, Masahiko*; et al.

Hyperfine Interactions, 238(1), p.14_1 - 14_6, 2017/11

 Times Cited Count:3 Percentile:86.59

151 (Records 1-20 displayed on this page)