Refine your search:     
Report No.
 - 
Search Results: Records 1-2 displayed on this page of 2
  • 1

Presentation/Publication Type

Initialising ...

Refine

Journal/Book Title

Initialising ...

Meeting title

Initialising ...

First Author

Initialising ...

Keyword

Initialising ...

Language

Initialising ...

Publication Year

Initialising ...

Held year of conference

Initialising ...

Save select records

Journal Articles

France-Japan synthesis concept on sodium-cooled fast reactor review of a joint collaborative work

Rodriguez, G.*; Varaine, F.*; Costes, L.*; Venard, C.*; Serre, F.*; Chanteclair, F.*; Chenaud, M.-S.*; Dechelette, F.*; Hourcade, E.*; Plancq, D.*; et al.

EPJ Nuclear Sciences & Technologies (Internet), 7, p.15_1 - 15_8, 2021/00

France (CEA and FRAMATOME) and Japan (JAEA, MHI and MFBR) have carried out studies to establish a common technical view regarding sodium-cooled fast reactor concept. Japan and France performed a common work to examine ways to develop a feasible common design concept, which could be built both in France and/or in Japan. This paper is providing a review of this joint synthesis on Sodium Fast Reactor design concept.

Journal Articles

Routing study of above core structure with mock-up experiment for ASTRID

Takano, Kazuya; Sakamoto, Yoshihiko; Morohoshi, Kyoichi*; Okazaki, Hitoshi*; Gima, Hiromichi*; Teramae, Takuma*; Ikarimoto, Iwao*; Botte, F.*; Dirat, J.-F.*; Dechelette, F.*

Proceedings of 2019 International Congress on Advances in Nuclear Power Plants (ICAPP 2019) (Internet), 8 Pages, 2019/05

ASTRID has the objective to integrate innovative options in order to prepare the 4th generation reactors. In ASTRID, large number of tubes are installed above each fuel subassembly to monitor the core. These instrumentations such as thermocouples (TC) and Failed Fuel Detection and Location (FFDL) systems are integrated into Above Core Structure (ACS) with various sizes tubes. In the present study, the routing study for TC tubes and FFDL tubes was performed with 3D modeling and mock-up experiment of the ACS designed for ASTRID with 1500 MW thermal power in order to clarify the integration process and secure the design hypotheses. Although some problems on fabricability were found in the mock-up experiment, the possible solutions were proposed. The present study gives manufacturing feedback to design team and will contribute to increase the knowledge for ACS design and fabricability.

2 (Records 1-2 displayed on this page)
  • 1