Refine your search:     
Report No.
 - 
Search Results: Records 1-3 displayed on this page of 3
  • 1

Presentation/Publication Type

Initialising ...

Refine

Journal/Book Title

Initialising ...

Meeting title

Initialising ...

First Author

Initialising ...

Keyword

Initialising ...

Language

Initialising ...

Publication Year

Initialising ...

Held year of conference

Initialising ...

Save select records

JAEA Reports

Operating Document on Management Division Waste Management Section in Tokai Works in the 2003 Fiscal Year

Kobayashi, Kentaro; Akutsu, Shigeru; Sasayama, Yasuo; Nakanishi, Masahiro; Ozone, Takashi; Tomomi, Terunuma,; Mogaki, Isao*

JNC TN8440 2005-007, 138 Pages, 2005/07

JNC-TN8440-2005-007.pdf:7.47MB

This document is announced about the task of Waste Management Section of Waste Management Division in 2003. Mainly, our tasks are fractionating, incinerating and storing low active solid waste and storing high active solid waste. In addition, we are performing required correspondence about management program of low level waste. We had treated and stored waste safely according to our plan. As a result, we have achieved following outcomes. 1. We incinerated the combustible low active solid waste that is generated by the operation of Tokai Reprocessing Plant and the recovery operation of incident at Low Active Liquid Waste Asphalt Solidification Facility. Waste of this recovery operation is stored in the 2nd Low Active Liquid Waste Asphalt Solidification Storage Facility. We incinerated 58 ton of wastes. 2. We stored low active solid waste 854 drums that accommodate 200L. According to the time of Low-Level Waste Treatment Facility completion, we will be able to avoid full of storage. 3. We stored high active solid waste of 148 drums that accommodate 200L. For the time being, there is no problem as regards the administration of storage facility. 4. We carried out the management program of low level solid waste according to plan.

JAEA Reports

Operating Document on Management Division Waste Management Section in Tokai Works in the 2002 Fiscal Year

Kobayashi, Kentaro; Isozaki, Koei; Akutsu, Shigeru; Nakanishi, Masahiro; Ozone, Takashi; Mogaki, Isao*; Aizawa, Shuichi*

JNC TN8440 2004-001, 151 Pages, 2004/05

JNC-TN8440-2004-001.pdf:88.84MB

This document is announced about task of Waste Management Section in the 2003 fiscal year.

JAEA Reports

Report of inspection about an evaporating vessel (I)

; ; ; *

JNC TN8410 2002-007, 85 Pages, 2002/07

JNC-TN8410-2002-007.pdf:22.55MB

It passed fifteen years from February 1986, hot operation had been started at Solvent Waste Treatment Demonstration Facility (ST). It has come when it has been necessary to inspect equipments, because they are old. The evaporator of phosphoric waste is the severest equipment m ST, from the viewpoint of corrosion. The condition is included phosphoric acid waste, and heated by steam for running. So, we chose the evaporator for inspection of inside. We had already inspected appearance of the evaporator as ISI (in service inspection), measuring thickness and the examination for seeking a crack by PT (Penetrate Testing) and supersonic waves had been carried out. We confirmed it had no damage. In this paper, we reported the special inspection. We inspected the heating Part inside of the evaporator of calandria tube in order to search any damage. The abstract is as follows. (1)In order to decide inspection technique, we put together actual result about specification and past inspection. We planed inspection of observation appearance and examination for seeking a crack on heating part by PT (Penetrate Testing). We designed inspectional device for the inside of an evaporator of calandria tube. (2)Designed inspectional device is able to inspect an appearance by CCD camera. If it is reconstructed partly, it will be able to do PT (Penetrate Testing). (3)We reconstructed the reserve nozzle with changing the closed plug to the flange in order to insert inspectional device to inspect inside of the evaporator of calandria tube (4)We inspected inside of the evaporator of calandria tube by this inspectional device, and confirmed it had no damage inside too. Moreover, we will reconstruct inspectional device, inspect for seeking a clack by PT (Penetrate Testing), and confirmation healthiness of heating point more quantitative.

3 (Records 1-3 displayed on this page)
  • 1