Refine your search:     
Report No.
 - 

Cold-model tests and fabrication status for J-PARC ACS

Ao, Hiroyuki; Akikawa, Hisashi; Ueno, Akira  ; Hasegawa, Kazuo; Yamazaki, Yoshishige; Ikegami, Masanori*; Noguchi, Shuichi*; Hayashizaki, Noriyosu*; Paramonov, V.*

The J-PARC (Japan Proton Accelerator Research Complex) LINAC will be commissioned with energy of 181-MeV using 50-keV ion source, 3-MeV RFQ, 50-MeV DTL and 181-MeV SDTL (Separated DTL) on September 2006. It is planed to be upgraded by using a 400-MeV ACS (Annular Coupled Structure), which is a high-beta structure most suitable for the J-PARC, in a few years from the commissioning. The first ACS type cavity, which will be used as the first buncher between the SDTL and the ACS, is under fabrication. Detailed design and tuning procedure of ACS cavities has been studied with RF simulation analysis and cold-model measurements. The results of cold-model measurements, fabrication status, and related development items are described in this paper.

Accesses

:

- Accesses

InCites™

:

Altmetrics

:

[CLARIVATE ANALYTICS], [WEB OF SCIENCE], [HIGHLY CITED PAPER & CUP LOGO] and [HOT PAPER & FIRE LOGO] are trademarks of Clarivate Analytics, and/or its affiliated company or companies, and used herein by permission and/or license.