Refine your search:     
Report No.
 - 

Beam monitors for the commissioning of energy upgraded linac

Miura, Akihiko ; Maruta, Tomofumi*; Liu, Y.*; Miyao, Tomoaki*; Kawane, Yusuke; Ouchi, Nobuo ; Oguri, Hidetomo  ; Ikegami, Masanori*; Hasegawa, Kazuo

In the J-PARC Linac, an energy upgrade project has started since 2009 using Annular-ring Coupled Structure cavities to achieve design beam power of 1 MW at the exit of the downstream rapid cycling synchrotron. Linac beam parameters of the upgraded Linac is drastically improved especially for the beam energy from 181 to 400 MeV in the project. To meet with the significant upgrades of the Linac, beam monitors to be used for the upgraded beam line are newly designed and fabricated as well as the beam monitor layout is designed with the consideration to the beam commissioning strategies. This paper introduces the beam monitor layout in the new beam line and the commissioning results to confirm the beam monitor functioning.

Accesses

:

- Accesses

InCites™

:

Altmetrics

:

[CLARIVATE ANALYTICS], [WEB OF SCIENCE], [HIGHLY CITED PAPER & CUP LOGO] and [HOT PAPER & FIRE LOGO] are trademarks of Clarivate Analytics, and/or its affiliated company or companies, and used herein by permission and/or license.