Refine your search:     
Report No.
 - 
Search Results: Records 1-3 displayed on this page of 3
  • 1

Presentation/Publication Type

Initialising ...

Refine

Journal/Book Title

Initialising ...

Meeting title

Initialising ...

First Author

Initialising ...

Keyword

Initialising ...

Language

Initialising ...

Publication Year

Initialising ...

Held year of conference

Initialising ...

Save select records

JAEA Reports

The Outline of investigation on integrity of JMTR concrete structures, cooling system and utility facilities

Ebisawa, Hiroyuki; Hanakawa, Hiroki; Asano, Norikazu; Kusunoki, Hidehiko; Yanai, Tomohiro; Sato, Shinichi; Miyauchi, Masaru; Oto, Tsutomu; Kimura, Tadashi; Kawamata, Takanori; et al.

JAEA-Technology 2009-030, 165 Pages, 2009/07

JAEA-Technology-2009-030.pdf:69.18MB

The condition of facilities and machinery used continuously were investigated before the renewal work of JMTR on FY 2007. The subjects of investigation were reactor building, primary cooling system tanks, secondary cooling system piping and tower, emergency generator and so on. As the result, it was confirmed that some facilities and machinery were necessary to repair and others were used continuously for long term by maintaining on the long-term maintenance plan. JMTR is planed to renew by the result of this investigation.

JAEA Reports

Investigation on high availability-factor achievement of JMTR; How to achieve 60% availability-factor

Takemoto, Noriyuki; Izumo, Hironobu; Inoue, Shuichi; Abe, Shinichi; Naka, Michihiro; Akashi, Kazutomo; Omi, Masao; Miyazawa, Masataka; Baba, Osamu*; Nagao, Yoshiharu

JAEA-Review 2008-051, 36 Pages, 2008/10

JAEA-Review-2008-051.pdf:3.14MB

The JMTR has been refurbished to restart operation in FY2011. The restarted JMTR plays roles of (1) measures for long-term operation of light water reactors, (2) improvement in scientific technique, (3) increase of industrial use, (4) training of human resources, etc. It is needed to operate the restarted JMTR safety and stably and maintain high available factor (50$$sim$$70%) because of increasing of irradiation utilization demand. In this report, measures for training of reactor operators, organization for operating, etc were proposed to operate reactor safety and smoothly. And also reactor operation procedure was examined to improve available factor up to world level for materials testing reactor. As a result, it was turned out to be possible to realize stably 210 days operation per year (available factor: 60%).

JAEA Reports

The Recovery from water leakage accident in JMTR

Ito, Haruhiko; Homma, Kenzo; Itabashi, Yukio; Tabata, Toshio; Akashi, Kazutomo; Inaba, Yukio; Kumahara, Hajime; Takahashi, Kunihiro; Kitajima, Toshio; Yokouchi, Iichiro

JAERI-Review 2003-024, 76 Pages, 2003/10

JAERI-Review-2003-024.pdf:8.35MB

no abstracts in English

3 (Records 1-3 displayed on this page)
  • 1