Refine your search:     
Report No.
 - 
Search Results: Records 1-4 displayed on this page of 4
  • 1

Presentation/Publication Type

Initialising ...

Refine

Journal/Book Title

Initialising ...

Meeting title

Initialising ...

First Author

Initialising ...

Keyword

Initialising ...

Language

Initialising ...

Publication Year

Initialising ...

Held year of conference

Initialising ...

Save select records

JAEA Reports

The Uranium waste fluid processing examination by liquid and liquid extraction method using the emulsion flow method

Kanda, Nobuhiro; Daiten, Masaki; Endo, Yuji; Yoshida, Hideaki; Mita, Yutaka; Naganawa, Hirochika; Nagano, Tetsushi; Yanase, Nobuyuki

JAEA-Technology 2015-007, 43 Pages, 2015/03

JAEA-Technology-2015-007.pdf:5.33MB

The centrifuge which has the subtlety information concerning the nuclear nonproliferation used for uranium enrichment technical development exists in the uranium enrichment facilities of Ningyo-toge Environmental Engineering Center, Japan Atomic Energy Agency. This centrifugal is performing separation processing of the radioactive material adhering to the surface of parts by wet decontamination of ultrasonic cleaning by dilute sulfuric acid and water, etc. By removing the uranium contained in waste fluid, generated sludge reduces activity concentration. And the possibility of reduction of sludge processing is examined. For this reason, from the 2007 fiscal year, Nuclear Science and Engineering Directorate and cooperation are aimed at, and development of the extraction separation technology of the "uranium" by the emulsion flow method is furthered. The test equipment using the developed emulsion flow method was tested. And dilute sulfuric acid and water were used for the examination as actual waste fluid. The result checked whether the various performances in Basic test carried out in Nuclear Science and Engineering Directorate would be obtained.

Oral presentation

Buckling fracture of PVC ventilation duct by the in-line monitor sampling

Matsubara, Tatsuo; Endo, Yuji; Yamanaka, Toshihiro; Kuramoto, Takao; Daiten, Masaki; Sugitsue, Noritake

no journal, , 

The hard vinyl chloride ventilation duct of the local ventilation equipment for used centrifuge decommissioning system had fractured despite the ventilation stopping. As a result of investigation of the causes, it was found that negative pressure in the isolated duct with the damper valve exceeded buckling limit because the air sampling of air-sniffer was not stopped. For experimental proof of this, we investigated of attained negative pressure, analyzed buckling stress and confirmed that hard vinyl chloride ventilation duct was fractured quickly by negative pressure buckling with the mock-up examination device.

Oral presentation

Operational results of clearance system in the uranium using facility

Mita, Yutaka; Sugitsue, Noritake; Ogura, Hiroaki; Daiten, Masaki; Ishimori, Yuu; Ema, Akira

no journal, , 

In enrichment engineering facilities of Ningyo-toge Environmental Engineering Center, make reports on the investment performance that was that there is no need (clearance) dealing with the centrifuge that was contaminated with uranium that was used to technological development of uranium enrichment as radioactive waste. Casings centrifuge was reused metal about 10ton by carrying the decontamination and radioactivity concentration measurement as a flower bed in the center.

Oral presentation

Recent status of decommissioning on uranium facilities and application of clearance

Daiten, Masaki

no journal, , 

Main equipment of the uranium refining and conversion facility had been dismantled from 2008 to 2013. The uranium enrichment pilot plant has been dismantled since 2014. Removal treatment of uranium residue in equipment of the uranium enrichment demonstration plant commenced from 2001. Based on the technological result of uranium removal treatment, removal treatment of uranium from the first operation unit commenced, and it will be completed in FY 2016. Measurement and evaluation of radioactivity concentrations of equipment for clearance level commenced in May 2013. After the radioactivity concentrations were confirmed, and the certificates were issued by Nuclear Regulation Authority, clearance objects were carried out from the uranium facility and aluminum materials were reused for the first time in Japan.

4 (Records 1-4 displayed on this page)
  • 1