Refine your search:     
Report No.
 - 
Search Results: Records 1-7 displayed on this page of 7
  • 1

Presentation/Publication Type

Initialising ...

Refine

Journal/Book Title

Initialising ...

Meeting title

Initialising ...

First Author

Initialising ...

Keyword

Initialising ...

Language

Initialising ...

Publication Year

Initialising ...

Held year of conference

Initialising ...

Save select records

JAEA Reports

Decommissioning of uranium handling facility for development of nuclear fuel manufacturing equipment

Kageyama, Tomio; Denuma, Akio; Koizumi, Jin*; Odakura, Manabu*; Haginoya, Masahiro*; Isaka, Shinichi*; Kadowaki, Hiroyuki*; Kobayashi, Shingo*; Morimoto, Taisei*; Kato, Yoshiaki*; et al.

JAEA-Technology 2022-033, 130 Pages, 2023/03

JAEA-Technology-2022-033.pdf:9.87MB

Uranium handling facility for development of nuclear fuel manufacturing equipment (Mockup room) was constructed in 1972. The Mockup room has a weak seismic resistance and is deteriorating with age. Also, the original purpose with this facility have been achieved and there are no new development plans using this facility. Therefore, interior equipment installed in this facility had been dismantled and removed since March 2019. After that, the Mockup room was inspected for contamination, and then controlled area in the Mockup room was cancelled on March 29th 2022. A total of 6,549 workers (not including security witnesses) were required for this work. The amount of non-radioactive waste generated by this work was 31,300 kg. The amount of radioactive waste generated by this work was 3,734 kg of combustible waste (103 drums), 4,393 kg of flame resistance waste (61 drums), 37,790 kg of non-combustible waste (124 drums, 19 containers). This report describes about the dismantling and removing the interior equipment in the Mockup room, the amount of waste generated by this work, and procedure for cancellation the controlled area in the facility.

JAEA Reports

Decommissioning of Pre-dismantling Temporary Waste Storage Facility 3 (FPG-03a,b,c) in Plutonium Fuel Production Facility

Shinozaki, Masaru; Aita, Takahiro; Iso, Takahito*; Odakura, Manabu*; Haginoya, Masahiro*; Kadowaki, Hiroyuki*; Kobayashi, Shingo*; Inagawa, Takumu*; Morimoto, Taisei*; Iso, Hidetoshi; et al.

JAEA-Technology 2021-043, 100 Pages, 2022/03

JAEA-Technology-2021-043.pdf:7.49MB

It is planned that the MOX (Mixed Oxide) from the decommissioned facilities in Nuclear Fuel Cycle Engineering Laboratories is going to be consolidated and stored stably and safely for a long term in Plutonium Fuel Production Facility of the Plutonium Fuel Development Center of Nuclear Fuel Cycle Engineering Laboratories. For this purpose, it is necessary to pelletize nuclear fuel materials in the facility and store them in the assembly storage (hereinafter referred to as "waste packaging work") to secure storage space in the plutonium material storage. As a countermeasure to reduce the facility risk in this waste packing work, it was decided to construct a new powder weighing and homogenization mixing facility to physically limit the amount (batch size) of nuclear fuel materials handled at the entrance of the process. In order to secure the installation space for the new facility in the powder preparation room (1) (FP-101), the pre-dismantling temporary waste storage facility 3 (FPG-03a, b, c) was dismantled and removed. This facility consists of a granulating and sizing facility, an additive mixing facility, and a receiving and delivering guided facility, which started to be used from January 1993, and was discontinued on February 3, 2012 and became a waste facility. Subsequently, the dismantling and removal of the interior equipment was carried out by pellet fabrication section for glove operation to reduce the amount of hold-up, and before the main dismantling and removal, there was almost no interior equipment except for large machinery. This report describes the dismantling and removal of the glove box and some interior equipment and peripherals of the facility, as well as the Green House setup method, dismantling and removal procedures, and issues specific to powder process equipment (dust, etc.).

Journal Articles

Technology development on reactor dismantling and investigation of contamination in FUGEN

Soejima, Goro; Iwai, Hiroki; Nakamura, Yasuyuki; Hayashi, Hirokazu; Kadowaki, Haruhiko; Mizui, Hiroyuki; Sano, Kazuya

Proceedings of 25th International Conference on Nuclear Engineering (ICONE-25) (CD-ROM), 5 Pages, 2017/07

no abstracts in English

JAEA Reports

Document collection of the 28th Technical Special Committee on Fugen Decommissioning

Kutsuna, Hideki; Iwai, Hiroki; Mizui, Hiroyuki; Kadowaki, Haruhiko; Nakamura, Yasuyuki

JAEA-Review 2013-049, 49 Pages, 2014/02

JAEA-Review-2013-049.pdf:5.59MB

Fugen Decommissioning Engineering Center has been establishing "Technical special committee on Fugen decommissioning" which consists of the members well-informed, aiming to make good use of Fugen as a place for technological development which is opened inside and outside the country. This report compiles presentation materials "The Current Situation of Fugen Decommissioning", "The Current Status of the Cutting Test toward the Practical Use of Laser Cutting Technology and the Future Plan", "Study on Radioactive Substance Osmosis for Basis Concrete of Equipment", "Verification Tests of the Room-Temperature Vacuum Drying and the Evaluation Method of Residual Amount of Heavy Water in the Tritium Removal" and "Applicability Test of Thermal and Mechanical Cutting Technology for the Dismantlement of the Internal Core of Fukushima Daiichi NPS", presented in the 28th Technical special committee on Fugen decommissioning which was held on September 24, 2013.

Oral presentation

Development of DC ultra-high voltage insulation technology for ITER NBI

Tobari, Hiroyuki; Hanada, Masaya; Watanabe, Kazuhiro; Kashiwagi, Mieko; Kojima, Atsushi; Dairaku, Masayuki; Seki, Norikatsu; Abe, Hiroyuki; Umeda, Naotaka; Yamanaka, Haruhiko; et al.

no journal, , 

Progress on technical development on ITER and JT-60SA neutral beam injector (NBI) were reported. In development of a 1 MV insulating transformer for ITER NB power supply, a bushing extracting 1 MV required a huge insulator that was impossible to manufacture. To solve this issue, a composite bushing with FRP tube and a small condenser bushing with insulation gas was newly developed. In development the HV bushing as an insulating feed through, voltage holding in large cylindrical electrodes inside the HV bushing was investigated. The scaling for vacuum insulation design of large cylindrical electrodes was obtained. Toward long pulse production and acceleration of negative ion beam, active control system of plasma grid temperature and a new extractor consisting of the extraction grid with high water cooling capability and aperture offset were developed. As a result, 15 negative ion beam has been achieved for 100 s. Also beam energy density has been increased two orders of magnitude.

Oral presentation

Application of the laser cutting technology in reactor facility

Nakamura, Yasuyuki; Kadowaki, Haruhiko; Iwai, Hiroki; Soejima, Goro; Mizui, Hiroyuki; Sano, Kazuya

no journal, , 

no abstracts in English

Oral presentation

Technology survey on in-situ simple $$gamma$$ ray measurement

Soejima, Goro; Kadowaki, Haruhiko; Iwai, Hiroki; Nakamura, Yasuyuki; Mizui, Hiroyuki; Sano, Kazuya

no journal, , 

no abstracts in English

7 (Records 1-7 displayed on this page)
  • 1