Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Kamiya, Tomohiro; Ono, Ayako; Tada, Kenichi; Akie, Hiroshi; Nagaya, Yasunobu; Yoshida, Hiroyuki; Kawanishi, Tomohiro
Proceedings of 29th International Conference on Nuclear Engineering (ICONE 29) (Internet), 8 Pages, 2022/11
JAEA started to develop the advanced reactor analysis code JAMPAN (JAEA advanced multi-physics analysis platform for nuclear systems). The current version of JAMPAN handles the continuous energy Monte Carlo code MVP and the detailed thermal-hydraulics analysis code for multiphase and multicomponent JUPITER. JAMPAN is designed to consider the extensibility and it does not depend on the analysis codes. All calculations in JAMAPAN are not directly connected. JAMPAN has data containers, and all input and output data of each analysis code are set in these data containers. JAMPAN will easily exchange the calculation codes and add the other calculations, e.g., structure calculation and irradiation calculation since the input and the output format of each code has no impact on the other calculation codes. The 4 by 4 pin-cell geometry was used as the demonstration calculation of JAMPAN and the physically reasonable calculation results were obtained.
Yamamoto, Kazami; Kinsho, Michikazu; Hayashi, Naoki; Saha, P. K.; Tamura, Fumihiko; Yamamoto, Masanobu; Tani, Norio; Takayanagi, Tomohiro; Kamiya, Junichiro; Shobuda, Yoshihiro; et al.
Journal of Nuclear Science and Technology, 59(9), p.1174 - 1205, 2022/09
Times Cited Count:3 Percentile:85.55(Nuclear Science & Technology)In the Japan Proton Accelerator Research Complex, the purpose of the 3 GeV rapid cycling synchrotron (RCS) is to accelerate a 1 MW, high-intensity proton beam. To achieve beam operation at a repetition rate of 25 Hz at high intensities, the RCS was elaborately designed. After starting the RCS operation, we carefully verified the validity of its design and made certain improvements to establish a reliable operation at higher power as possible. Consequently, we demonstrated beam operation at a high power, namely, 1 MW. We then summarized the design, actual performance, and improvements of the RCS to achieve a 1 MW beam.
Nakanoya, Takamitsu; Kamiya, Junichiro; Yoshimoto, Masahiro; Takayanagi, Tomohiro; Tani, Norio; Kotoku, Hirofumi*; Horino, Koki*; Yanagibashi, Toru*; Takeda, Osamu*; Yamamoto, Kazami
JAEA-Technology 2021-019, 105 Pages, 2021/11
Since a user operation startup, the 3 GeV synchrotron accelerator (Rapid-Cycling Synchrotron: RCS) gradually reinforced the beam power. As a result, the surface dose rate of the apparatus located at the beam injection area of the RCS, such as the magnet, vacuum chambers, beam monitors, etc., increases year by year. The beam injection area has many apparatuses which required manual maintenance, so reducing worker's dose is a serious issue. To solve this problem, we have organized a task force for the installation of the shield. The task force has aimed to optimize the structure of the radiation shield, construct the installation procedure with due consideration of the worker's dose suppression. As the examination result of the shield design, we have decided to adopt removal shielding that could be installed quickly and easily when needed. We carried out shield installation work during the 2020 summer maintenance period. The renewal work required to install the shielding has been carried out in a under high-dose environment. For this reason, reducing the dose of workers was an important issue. So, we carefully prepared the work plan and work procedure in advance. During the work period, we implemented various dose reduction measures and managed individual dose carefully. As a result, the dose of all workers could be kept below the predetermined management value. We had installed removal shielding at the beam injection area in the 2020 summer maintenance period. We confirmed that this shield can contribute to the reduction of the dose during work near the beam injection area. It was a large-scale work to occupy the beam injection area during almost of the summer maintenance period. However, it is considered very meaningful for dose suppression in future maintenance works.
Nakanoya, Takamitsu; Kamiya, Junichiro; Yoshimoto, Masahiro; Takayanagi, Tomohiro; Tani, Norio; Kotoku, Hirofumi*; Horino, Koki*; Yanagibashi, Toru*; Takeda, Osamu*; Yamamoto, Kazami
Proceedings of 18th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.238 - 242, 2021/10
Since a user operation startup, the 3GeV synchrotron accelerator (Rapid-Cycling Synchrotron: RCS) gradually reinforced the beam power. As a result, the surface dose rate of the apparatus located at the beam injection area of the RCS increases year by year. The beam injection area has many apparatuses which required manual maintenance, so reducing worker's dose is a serious issue. To solve this problem, we have decided to adopt removal shielding that could be installed quickly and easily when needed. We carried out shield installation work during the 2020 summer maintenance period. The installation work of the shield has been carried out in a under high-dose environment. For this reason, reducing the dose of workers was an important issue. So, we carefully prepared the work plan and work procedure in advance. During the work period, we implemented various dose reduction measures and managed individual dose carefully. As a result, the dose of all workers could be kept below the predetermined management value. We had installed removal shielding at the beam injection area in the 2020 summer maintenance period. We confirmed that this shield can contribute to the reduction of the dose during work near the beam injection area.
Shobuda, Yoshihiro; Kamiya, Junichiro; Takayanagi, Tomohiro; Horino, Koki*; Ueno, Tomoaki*; Yanagibashi, Toru*; Kotoku, Hirofumi*
Proceedings of 12th International Particle Accelerator Conference (IPAC 21) (Internet), p.3205 - 3208, 2021/08
At the injection area of the RCS in J-PARC, the interaction between the copper stripes (RF-shields) on the ceramic chambers and the external magnetic fields modulatesthe magnetic fields in the chamber, causing beam losses for a special tune. A ceramic chamber spirally covered by the stripes is a candidate to mitigate the modulations. In this report, we numerically and experimentally investigate how the interaction is suppressed, while sustaining the beam impedance enhancement within tolerable at the RCS.
Kamiya, Junichiro; Kotoku, Hirofumi; Shobuda, Yoshihiro; Takayanagi, Tomohiro; Yamamoto, Kazami; Yanagibashi, Toru*; Horino, Koki*; Miki, Nobuharu*
Journal of Physics; Conference Series, 1350, p.012172_1 - 012172_7, 2019/12
Times Cited Count:0 Percentile:0.06One of the issues in the J-PARC 3 GeV rapid cycling synchrotron is the high residual radiation dose around the beam injection point. A radiation shield is necessary to reduce radiation exposure of workers when maintenance is performed there. A space to install the radiation shield should be secured by newly designing a structure of the vacuum chamber at the injection point and the alumina ceramics beam pipes for the shift bump magnets. To make the space for the shield, the chamber is lengthened along the beam line and the cross-sectional shape is changed from circle to rectangle. The displacement and inner stress of the vacuum chamber due to atmospheric pressure were evaluated to be enough small by the calculation. For the ceramics beam pipe's rf-shield, the damping resistor was effective to reduce the induced modulation voltages by the pulsed magnetic field.
Yamamoto, Kazami; Yamakawa, Emi*; Takayanagi, Tomohiro; Miki, Nobuharu*; Kamiya, Junichiro; Saha, P. K.; Yoshimoto, Masahiro; Yanagibashi, Toru*; Horino, Koki*; Nakanoya, Takamitsu; et al.
ANS RPSD 2018; 20th Topical Meeting of the Radiation Protection and Shielding Division of ANS (CD-ROM), 9 Pages, 2018/08
The existing beam power of the J-PARC Rapid Cycling Synchrotron is up to 500 kW, and higher radiation doses are concentrated in the injection area. These activations are caused by the interaction between the foil and the beam. To reduce dose exposure to workers near the injection point, we study a new design of the injection scheme. Experience has shown that eddy currents are generated in the metal flange near the magnet owing to the pulsed magnetic field, and the temperature exceeds 100 degrees C. The shield installed in the new injection system needs to have a layer structure, in which an insulator is inserted between iron shields to reduce the eddy current. From the results of the shielding calculation, even if 1 mm of polyethylene was inserted between two 9-mm-thick SUS 316 plates, which serve as shielding material, the shielding performance was reduced only about 5%, and we confirmed that it would function well.
Takayanagi, Tomohiro; Yamamoto, Kazami; Kamiya, Junichiro; Saha, P. K.; Ueno, Tomoaki*; Horino, Koki*; Kinsho, Michikazu; Irie, Yoshiro*
IEEE Transactions on Applied Superconductivity, 28(3), p.4100505_1 - 4100505_5, 2018/04
Times Cited Count:4 Percentile:26.81(Engineering, Electrical & Electronic)Yamamoto, Kazami; Kamiya, Junichiro; Saha, P. K.; Takayanagi, Tomohiro; Yoshimoto, Masahiro; Hotchi, Hideaki; Harada, Hiroyuki; Takeda, Osamu*; Miki, Nobuharu*
Proceedings of 14th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.374 - 378, 2017/12
The 3-GeV Rapid Cycling Synchrotron (RCS) of Japan Proton Accelerator Research Complex (J-PARC) aims to deliver 1-MW proton beam to the neutron target and Main Ring synchrotron. Present beam power of the Rapid Cycling Synchrotron is up to 500-kW and the higher radiation doses were concentrated in the injection area. These activations were caused by the interaction between the foil and the beam. To reduce the worker dose near the injection point, we have studied a new design of the injection scheme to secure enough space for radiation shielding and bellows. In the new system, two of four injection pulse bump magnets are replaced and we are able to ensure the additional space around the injection foil chamber. So far, new injection system seems not impossible. However, preliminary study result indicated that temperature of the duct and shielding metals would be slightly higher. The eddy current due to the shift bump magnet field generates heat. Thus we have to study details of above effect.
Okabe, Kota; Yamamoto, Kazami; Kamiya, Junichiro; Takayanagi, Tomohiro; Yamamoto, Masanobu; Yoshimoto, Masahiro; Takeda, Osamu*; Horino, Koki*; Ueno, Tomoaki*; Yanagibashi, Toru*; et al.
Proceedings of 14th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.853 - 857, 2017/12
The most important issue is to reduce the uncontrolled beam loss in the high intensity hadron accelerator such as J-PARC proton accelerators. The J-PARC 3 GeV Synchrotron (RCS) has a collimator system which narrows a high intensity beam in the RCS. After startup of RCS in 2007, the collimator system of the RCS worked well. However, in April 2016, vacuum leakage at the collimator system occurred during the maintenance operation. To investigate a cause of the failure, we took apart iron shields of the collimator reducing exposed dose of operators. As a result of inspection, we succeeded to identify the cause of the vacuum leakage failure. In this presentation, we report the failure investigation of the beam collimator system in the RCS.
Yamamoto, Kazami; Kamiya, Junichiro; Saha, P. K.; Takayanagi, Tomohiro; Yoshimoto, Masahiro; Hotchi, Hideaki; Harada, Hiroyuki; Takeda, Osamu*; Miki, Nobuharu*
Proceedings of 8th International Particle Accelerator Conference (IPAC '17) (Internet), p.579 - 581, 2017/05
The 3-GeV Rapid Cycling Synchrotron of Japan Proton Accelerator Research Complex aims to deliver 1-MW proton beam to the neutron target and Main Ring synchrotron. Present beam power of the Rapid Cycling Synchrotron is up to 500-kW and the higher radiation doses were concentrated in the injection area. These activations were caused by the interaction between the foil and the beam. To reduce the worker dose near the injection point, we have studied a new design of the injection scheme to secure enough space for radiation shielding and bellows. In the new system, two of four injection pulse bump magnets are replaced and we are able to ensure the additional space around the injection foil chamber. So far, new injection system seems not impossible. However, preliminary study result indicated that temperature of the duct and shielding metals would be slightly higher. The eddy current due to the shift bump magnet field generates heat. Thus we have to study details of above effect.
Yamamoto, Kazami; Okabe, Kota; Kamiya, Junichiro; Yoshimoto, Masahiro; Takeda, Osamu; Takayanagi, Tomohiro; Yamamoto, Masanobu
Proceedings of 13th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.314 - 318, 2016/11
The 3 GeV Rapid-Cycling Synchrotron (RCS) of the Japan Proton Accelerator Research Complex (J-PARC) project generates 1MW proton beam for the neutron experiments and Main ring accelerator. In case of such high intensity hadron accelerator, the most important issue is to reduce the uncontrolled loss. The beam collimation system is designed for this purpose. In the present design, the physical aperture is 1.5 times wider than the primary collimator aperture and the beam loss can be enough localized on this condition. After a startup of RCS in 2007, the collimator system of RCS worked well. But vacuum leakage occurred during the maintenance period in April, 2016. Since it was expected that the beam collimator was radio-activated very much, we took the influence of radiation into consideration and designed the collimator (ie. a remote clamp system to connect/take off it with a vacuum flange away from itself). Therefore, during the recovery work of the collimator, we were able to reduce the worker dose to less than 60 micro Sv though the collimator block had a residual dose of 40 mSv/h.
Hayashi, Naoki; Harada, Hiroyuki; Horino, Koki; Hotchi, Hideaki; Kamiya, Junichiro; Kinsho, Michikazu; Saha, P. K.; Shobuda, Yoshihiro; Takayanagi, Tomohiro; Tani, Norio; et al.
Proceedings of 4th International Particle Accelerator Conference (IPAC '13) (Internet), p.3833 - 3835, 2014/07
no abstracts in English
Kitamura, Akane; Sato, Takahiro; Koka, Masashi; Kamiya, Tomihiro; Kobayashi, Tomohiro*
Nuclear Instruments and Methods in Physics Research B, 314, p.82 - 85, 2013/11
Times Cited Count:7 Percentile:49.88(Instruments & Instrumentation)Kitamura, Akane; Sato, Takahiro; Koka, Masashi; Kobayashi, Tomohiro*; Kamiya, Tomihiro
Nuclear Instruments and Methods in Physics Research B, 306, p.288 - 291, 2013/07
Times Cited Count:8 Percentile:54.24(Instruments & Instrumentation)Kitamura, Akane; Sato, Takahiro; Koka, Masashi; Kobayashi, Tomohiro*; Kamiya, Tomihiro
Nuclear Instruments and Methods in Physics Research B, 307, p.610 - 613, 2013/07
Times Cited Count:6 Percentile:44.86(Instruments & Instrumentation)Kitamura, Akane; Kobayashi, Tomohiro*; Sato, Takahiro; Koka, Masashi; Kamiya, Tomihiro; Suzuki, Akihiro*; Terai, Takayuki*
Nuclear Instruments and Methods in Physics Research B, 307, p.614 - 617, 2013/07
Times Cited Count:7 Percentile:49.88(Instruments & Instrumentation)Kitamura, Akane; Sato, Takahiro; Koka, Masashi; Kobayashi, Tomohiro*; Kamiya, Tomihiro
Hoshasen To Sangyo, (134), p.37 - 40, 2013/06
no abstracts in English
Kitamura, Akane; Sato, Takahiro; Koka, Masashi; Kamiya, Tomihiro; Kobayashi, Tomohiro*
Transactions of the Materials Research Society of Japan, 38(1), p.101 - 104, 2013/03
Kitamura, Akane; Sato, Takahiro; Koka, Masashi; Kamiya, Tomihiro; Kobayashi, Tomohiro*
JAEA-Review 2012-046, JAEA Takasaki Annual Report 2011, P. 128, 2013/01