Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Abe, Shinichiro; Hashimoto, Masanori*; Liao, W.*; Kato, Takashi*; Asai, Hiroaki*; Shimbo, Kenichi*; Matsuyama, Hideya*; Sato, Tatsuhiko; Kobayashi, Kazutoshi*; Watanabe, Yukinobu*
IEEE Transactions on Nuclear Science, 70(8, Part 1), p.1652 - 1657, 2023/08
Times Cited Count:0 Percentile:0.01(Engineering, Electrical & Electronic)Single event upsets (SEUs) caused by neutrons is a reliability problem for microelectronic devices in the terrestrial environment. Acceleration tests using white neutron beam provide realistic soft error rates (SERs), but only a few facilities can provide white neutron beam in the world. If single-source irradiation applicable to diverse neutron source can be utilized for the evaluation of the SER in the terrestrial environment, it contributes to solve the shortage of beam time. In this study, we investigated the feasibility of the SER estimation in the terrestrial environment by any one of these measured data with the SEU cross sections obtained by PHITS simulation. It was found that the SERs estimated by our proposed method are within a factor of 2.7 of that estimated by the Weibull function. We also investigated the effect of simplification which reduce the computational cost in simulation to the SER estimation.
Kageyama, Tomio; Denuma, Akio; Koizumi, Jin*; Odakura, Manabu*; Haginoya, Masahiro*; Isaka, Shinichi*; Kadowaki, Hiroyuki*; Kobayashi, Shingo*; Morimoto, Taisei*; Kato, Yoshiaki*; et al.
JAEA-Technology 2022-033, 130 Pages, 2023/03
Uranium handling facility for development of nuclear fuel manufacturing equipment (Mockup room) was constructed in 1972. The Mockup room has a weak seismic resistance and is deteriorating with age. Also, the original purpose with this facility have been achieved and there are no new development plans using this facility. Therefore, interior equipment installed in this facility had been dismantled and removed since March 2019. After that, the Mockup room was inspected for contamination, and then controlled area in the Mockup room was cancelled on March 29th 2022. A total of 6,549 workers (not including security witnesses) were required for this work. The amount of non-radioactive waste generated by this work was 31,300 kg. The amount of radioactive waste generated by this work was 3,734 kg of combustible waste (103 drums), 4,393 kg of flame resistance waste (61 drums), 37,790 kg of non-combustible waste (124 drums, 19 containers). This report describes about the dismantling and removing the interior equipment in the Mockup room, the amount of waste generated by this work, and procedure for cancellation the controlled area in the facility.
Zheng, X.*; Kato, Masaru*; Uemura, Yohei*; Matsumura, Daiju; Yagi, Ichizo*; Takahashi, Kiyonori*; Noro, Shinichiro*; Nakamura, Takayoshi*
Inorganic Chemistry, 62(3), p.1257 - 1263, 2023/01
Times Cited Count:1 Percentile:58.61(Chemistry, Inorganic & Nuclear)Yamamoto, Kazami; Kinsho, Michikazu; Hayashi, Naoki; Saha, P. K.; Tamura, Fumihiko; Yamamoto, Masanobu; Tani, Norio; Takayanagi, Tomohiro; Kamiya, Junichiro; Shobuda, Yoshihiro; et al.
Journal of Nuclear Science and Technology, 59(9), p.1174 - 1205, 2022/09
Times Cited Count:6 Percentile:84.97(Nuclear Science & Technology)In the Japan Proton Accelerator Research Complex, the purpose of the 3 GeV rapid cycling synchrotron (RCS) is to accelerate a 1 MW, high-intensity proton beam. To achieve beam operation at a repetition rate of 25 Hz at high intensities, the RCS was elaborately designed. After starting the RCS operation, we carefully verified the validity of its design and made certain improvements to establish a reliable operation at higher power as possible. Consequently, we demonstrated beam operation at a high power, namely, 1 MW. We then summarized the design, actual performance, and improvements of the RCS to achieve a 1 MW beam.
Kusano, Kanya*; Ichimoto, Kiyoshi*; Ishii, Mamoru*; Miyoshi, Yoshizumi*; Yoden, Shigeo*; Akiyoshi, Hideharu*; Asai, Ayumi*; Ebihara, Yusuke*; Fujiwara, Hitoshi*; Goto, Tadanori*; et al.
Earth, Planets and Space (Internet), 73(1), p.159_1 - 159_29, 2021/12
Times Cited Count:6 Percentile:51.19(Geosciences, Multidisciplinary)The PSTEP is a nationwide research collaboration in Japan and was conducted from April 2015 to March 2020, supported by a Grant-in-Aid for Scientific Research on Innovative Areas from the Ministry of Education, Culture, Sports, Science and Technology of Japan. It has made a significant progress in space weather research and operational forecasts, publishing over 500 refereed journal papers and organizing four international symposiums, various workshops and seminars, and summer school for graduate students at Rikubetsu in 2017. This paper is a summary report of the PSTEP and describes the major research achievements it produced.
Okumura, Takuma*; Azuma, Toshiyuki*; Bennet, D. A.*; Caradonna, P.*; Chiu, I. H.*; Doriese, W. B.*; Durkin, M. S.*; Fowler, J. W.*; Gard, J. D.*; Hashimoto, Tadashi; et al.
Physical Review Letters, 127(5), p.053001_1 - 053001_7, 2021/07
Times Cited Count:13 Percentile:79.44(Physics, Multidisciplinary)We observed electronic X rays emitted from muonic iron atoms using a superconducting transition-edge-type sensor microcalorimeter. The energy resolution of 5.2 eV in FWHM allowed us to observe the asymmetric broad profile of the electronic characteristic and X rays together with the hypersatellite X rays around 6 keV. This signature reflects the time-dependent screening of the nuclear charge by the negative muon and the -shell electrons, accompanied by electron side-feeding. Assisted by a simulation, this data clearly reveals the electronic - and -shell hole production and their temporal evolution during the muon cascade process.
Kondo, Yasuhiro; Hirano, Koichiro; Ito, Takashi; Kikuzawa, Nobuhiro; Kitamura, Ryo; Morishita, Takatoshi; Oguri, Hidetomo; Okoshi, Kiyonori; Shinozaki, Shinichi; Shinto, Katsuhiro; et al.
Journal of Physics; Conference Series, 1350, p.012077_1 - 012077_7, 2019/12
Times Cited Count:1 Percentile:52.28(Physics, Particles & Fields)We have upgraded a 3-MeV linac at J-PARC. The ion source is same as the J-PARC linac's, and the old 30-mA RFQ is replaced by a spare 50-mA RFQ, therefore, the beam energy is 3 MeV and the nominal beam current is 50 mA. The main purpose of this system is to test the spare RFQ, but also used for testing of various components required in order to keep the stable operation of the J-PARC accelerator. The accelerator has been already commissioned, and measurement programs have been started. In this paper, present status of this 3-MeV linac is presented.
Kyono, Atsushi*; Kato, Masato*; Sano, Asami; Machida, Shinichi*; Hattori, Takanori
Physics and Chemistry of Minerals, 46(5), p.459 - 469, 2019/05
Times Cited Count:4 Percentile:20.98(Materials Science, Multidisciplinary)To reveal the decomposition mechanism with temperature under high-pressure, crystal structure of a hydrogrossular, katoite CaAl(OD) has been studied by in-situ neutron diffraction at 8 GPa. Although unusual expansion behavior was discerned at 200-400C, the unit cell was continuously expanded up to 850C. At 900C, katoite was decomposed, indicating that pressure strongly increases dehydration temperature from 300C to 900C. On release of pressure, the katoite reappear together with corundum and portlandite. At 8 GPa, CaO and AlO polyhedra expand with temperature up to 850C by about 8% and 13%, respectively. On the other hand, tetrahedral interstices are isotopically squeezed by about 10%: due to the expansion of above polyhedra. The neighboring D-D distance remains almost unchanged in this temperature range, while the O-D bond distance shrinks drastically just before decomposition. This finding suggests that the shortening of O-D distance caused by the D-D repulsion destabilizes the O-D bond, which induces the thermal decomposition of katoite.
Matsunaga, Shoko*; Matsubara, Shinichiro*; Kato, Atsushi; Yamano, Hidemasa; Dderlein, C.*; Guillemin, E.*; Hirn, J.*
Proceedings of 27th International Conference on Nuclear Engineering (ICONE-27) (Internet), 8 Pages, 2019/05
This paper presents a design of Curie Point Electro-Magnet (CPEM) which will be installed as a passive shutdown system for a French Sodium-cooled Fast Reactor (ASTRID) development program which is conducted in collaboration between France and Japan. To confirm CPEM design validity, a qualification program for CPEM is developed on the basis of past comprehensive test series of Self-Actuated Shutdown System (SASS) in Japan. The main outcome of this paper is results of holding force tests in hot gas, which satisfy design requirements. Moreover, the result of a numerical magnetic field analysis showed the same tendency as that of the holding force test.
Osamura, Kozo*; Machiya, Shutaro*; Kawasaki, Takuro; Harjo, S.; Kato, Takeshi*; Kobayashi, Shinichi*; Osabe, Goro*
Materials Research Express (Internet), 6(2), p.026001_1 - 026001_13, 2019/02
Times Cited Count:6 Percentile:27.03(Materials Science, Multidisciplinary)Yoshimoto, Masahiro; Saha, P. K.; Kato, Shinichi; Okabe, Kota; Yamamoto, Kazami; Kinsho, Michikazu
Proceedings of 9th International Particle Accelerator Conference (IPAC '18) (Internet), p.1048 - 1050, 2018/06
The charge exchange multi-turn beam injection scheme is adopted in the J-PARC 3GeV Rapid Cycling Synchrotron Accelerator (RCS) due to achieve 1MW beam power operation. In the conventional multi-turn beam injection scheme, which is provided by only the septum and bump magnets, injecting turn numbers are limited by the beam losses at the septum. On the other hand, charge exchange multi-turn beam injection does not cause the beam losses at the septum; there is no restriction in principle on the injecting turn number. However, high residual doses are observed around the stripper foil. During the charge exchange multi-turn beam injection, not only the injecting beam but also circulating beam hit the foil, and then a large number of secondary particles, namely protons and neutrons, are generated. PHITS simulation results indicate that the secondary particles cause the high residual doses around the foil. To verify this examination, secondary particles measurement is key issue. Then, a new independent type foil introducing device is installed in the 100-deg dump beam transport line in order to construct a simple experimental system for secondary particle measurements. We plan the two experiments by using this system; one is a directly secondary particle detecting method, and the other is a radioactivation analysis method with metal sample pieces. Now, we started the study of how the identification of species and energies of the secondary particles with PHITS code. Irradiation target of Cu is adopted and irradiated proton or neutron beam with various energy range. Then radio-nuclides emitted the -ray are picked up. Moreover, the radio-nuclides, whose reaction efficiencies due to beam species or energy are different, are searched for the indicator of the secondary particles. From the simulation results, Zn is extremely suitable for a proton beam indicator, and Co and Co are also suited for a neutron and proton indicator respectively.
Kato, Masaru*; Muto, Marika*; Matsubara, Naohiro*; Uemura, Yohei*; Wakisaka, Yuki*; Yoneuchi, Tsubasa*; Matsumura, Daiju; Ishibara, Tomoko*; Tokushima, Takashi*; Noro, Shinichiro*; et al.
ACS Applied Energy Materials (Internet), 1(5), p.2358 - 2364, 2018/05
Times Cited Count:12 Percentile:43.4(Chemistry, Physical)Yoshimoto, Masahiro; Harada, Hiroyuki; Kato, Shinichi; Kinsho, Michikazu; Okabe, Kota
Proceedings of 6th International Beam Instrumentation Conference (IBIC 2017) (Internet), p.461 - 465, 2018/03
In the J-PARC RCS, a large fraction of our effort has been concentrated on reducing and managing beam losses to achieve 1MW high power proton beam operation. Standard beam loss monitor (BLM), which is installed outside of the magnet in every cell of beam optics and detect the beam loss at wide area in each cell, is insufficient to investigate finer beam loss mechanism in the ring. Thus we developed new scintillation type BLM to detect the beam loss at spot area on the vacuum chamber inside the magnet. The new BLM has separating structure a photomultiplier (PMT) from a plastic scintillator and connecting with optical fibres. Because small plastic scintillator is installed on the vacuum chamber directly, it has capability to have high sensitivity for localized spot area beam loss. On the other hand, the PMT can precisely be operated without being affected by magnetic field by keeping the PMT from the magnet. The new BLM leads the RCS to achieve the stable high power beam operation. In this presentation, we report the detail of the performance of the new BLM.
Harada, Hiroyuki; Yamane, Isao*; Saha, P. K.; Suganuma, Kazuaki; Kinsho, Michikazu; Irie, Yoshiro*; Kato, Shinichi
Proceedings of 14th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.684 - 688, 2017/12
The high-intensity proton accelerator adopts a charge exchange injection scheme, which injects with exchanging from negative Hydrogen ion to proton by using carbon foil. This scheme can realize high intensity proton beam but the uncontrolled beam losses are caused by scattering between beams and the foil. Additionally, the collision may occur the foil beak. Therefore, a new injection scheme for higher intensity is needed as an alternative to the foil. In the J-PARC 3GeV RCS, we newly propose and develop a laser stripping injection scheme. However, it is necessary that laser power is two order higher than latest laser one. To realize this big issue, we develop the laser storage ring, which can provide laser pulse of high repetition rate by recycling one. In this presentation, we will introduce the laser stripping injection scheme and describe the concept of the laser storage ring with high repetition rate and report the current status.
Hotchi, Hideaki; Harada, Hiroyuki; Kato, Shinichi; Okabe, Kota; Saha, P. K.; Shobuda, Yoshihiro; Tamura, Fumihiko; Tani, Norio; Watanabe, Yasuhiro; Yoshimoto, Masahiro
Proceedings of 14th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.95 - 99, 2017/12
no abstracts in English
Yoshimoto, Masahiro; Kato, Shinichi; Okabe, Kota; Harada, Hiroyuki; Kinsho, Michikazu
Proceedings of 14th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.877 - 881, 2017/12
It is key issue to reduce the level of the radio-activation of the devices in high power proton accelerator, to achieve MW class high power beam operation. The 3 GeV Rapid Cycling Synchrotron (RCS) of the Japan Proton Accelerator Research Complex (J-PARC) adopted a beam collimation system which aims to localize the beam loss at the collimators and to reduce the level of residual doses at the other devices. However, relatively high residual doses are detected in not only the beam collimator area but also a vicinity of the stripper foil. The results of previous work, measurements of the detailed residual dose distribution and simulations of the radio-activation by the PHITS, indicate that the high level residual dose around the stripper foil is caused by secondary particles due to nuclear reaction at the foil. In order to suppress the secondary particles from foil, we try hard to reduce the number of foil hitting particles during the beam injection period. As a result, the level of the radio-activation around the foil can be decreased. At the same time, new beam loss monitor to detect the secondary particles from the foil is developed. In this presentation, we report the secondary particles detections and estimations of number of the foil hitting particles. In addition, we discuss the reduction of the radio-activation.
Saha, P. K.; Harada, Hiroyuki; Yamane, Isao*; Kinsho, Michikazu; Miura, Akihiko; Okabe, Kota; Liu, Y.*; Yoshimoto, Masahiro; Kato, Shinichi; Irie, Yoshiro*
Proceedings of 14th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.866 - 870, 2017/12
Okabe, Kota; Yamamoto, Kazami; Kamiya, Junichiro; Takayanagi, Tomohiro; Yamamoto, Masanobu; Yoshimoto, Masahiro; Takeda, Osamu*; Horino, Koki*; Ueno, Tomoaki*; Yanagibashi, Toru*; et al.
Proceedings of 14th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.853 - 857, 2017/12
The most important issue is to reduce the uncontrolled beam loss in the high intensity hadron accelerator such as J-PARC proton accelerators. The J-PARC 3 GeV Synchrotron (RCS) has a collimator system which narrows a high intensity beam in the RCS. After startup of RCS in 2007, the collimator system of the RCS worked well. However, in April 2016, vacuum leakage at the collimator system occurred during the maintenance operation. To investigate a cause of the failure, we took apart iron shields of the collimator reducing exposed dose of operators. As a result of inspection, we succeeded to identify the cause of the vacuum leakage failure. In this presentation, we report the failure investigation of the beam collimator system in the RCS.
Hotchi, Hideaki; Harada, Hiroyuki; Hayashi, Naoki; Kato, Shinichi; Kinsho, Michikazu; Okabe, Kota; Saha, P. K.; Shobuda, Yoshihiro; Tamura, Fumihiko; Tani, Norio; et al.
Physical Review Accelerators and Beams (Internet), 20(6), p.060402_1 - 060402_25, 2017/06
Times Cited Count:25 Percentile:88.02(Physics, Nuclear)The 3-GeV rapid cycling synchrotron (RCS) of the Japan Proton Accelerator Research Complex (J-PARC) is the world's highest class of high-power pulsed proton driver, aiming for an output beam power of 1 MW. The most important issues in realizing such a high-power beam operation are to control and minimize beam loss for maintaining machine activations within permissible levels. In RCS, numerical simulation was successfully utilized along with experimental approaches to isolate the mechanism of beam loss and find its solution. By iteratively performing actual beam experiments and numerical simulations, and also by several hardware improvements, we have recently established a 1-MW beam operation with very low fractional beam loss of a couple of 10. In this paper, our recent efforts toward realizing such a low-loss high-intensity beam acceleration are presented.
Hotchi, Hideaki; Harada, Hiroyuki; Kato, Shinichi; Okabe, Kota; Saha, P. K.; Shobuda, Yoshihiro; Tamura, Fumihiko; Tani, Norio; Watanabe, Yasuhiro; Yoshimoto, Masahiro
Proceedings of 8th International Particle Accelerator Conference (IPAC '17) (Internet), p.2470 - 2473, 2017/06
For this past year, RCS beam tuning was focused on realizing a high-intensity low-emittance beam required from the downstream facility. The extraction beam emittance including its tail part was successfully decreased by optimizing transverse injection painting, and tune and chromaticity manipulations, where bipolar sextupole field patterns were newly introduced to simultaneously achieve emittance growth mitigation at the early stage of acceleration and beam instability suppression after the middle stage of acceleration. This paper presents the recent experimental results, together with detailed discussions for the emittance growth and its mitigation mechanisms.