Refine your search:     
Report No.
 - 
Search Results: Records 1-9 displayed on this page of 9
  • 1

Presentation/Publication Type

Initialising ...

Refine

Journal/Book Title

Initialising ...

Meeting title

Initialising ...

First Author

Initialising ...

Keyword

Initialising ...

Language

Initialising ...

Publication Year

Initialising ...

Held year of conference

Initialising ...

Save select records

Journal Articles

Comprehensive seismic evaluation of HTTR against the 2011 off the Pacific coast of Tohoku Earthquake

Ono, Masato; Iigaki, Kazuhiko; Sawahata, Hiroaki; Shimazaki, Yosuke; Shimizu, Atsushi; Inoi, Hiroyuki; Kondo, Toshinari; Kojima, Keidai; Takada, Shoji; Sawa, Kazuhiro

Journal of Nuclear Engineering and Radiation Science, 4(2), p.020906_1 - 020906_8, 2018/04

On March 11th, 2011, the 2011 off the Pacific coast of Tohoku Earthquake of magnitude 9.0 occurred. When the great earthquake occurred, the High Temperature Engineering Test Reactor (HTTR) had been stopped under the periodic inspection and maintenance of equipment and instruments. A comprehensive integrity evaluation was carried out for the HTTR facility because the maximum seismic acceleration observed at the HTTR exceeded the maximum value of design basis earthquake. The concept of comprehensive integrity evaluation is divided into two parts. One is the "visual inspection of equipment and instruments". The other is the "seismic response analysis" for the building structure, equipment and instruments using the observed earthquake. All equipment and instruments related to operation were inspected in the basic inspection. The integrity of the facilities was confirmed by comparing the inspection results or the numerical results with their evaluation criteria. As the results of inspection of equipment and instruments associated with the seismic response analysis, it was judged that there was no problem for operation of the reactor, because there was no damage and performance deterioration. The integrity of HTTR was also supported by the several operations without reactor power in cold conditions of HTTR in 2011, 2013 and 2015. Additionally, the integrity of control rod guide blocks was also confirmed visually when three control rod guide blocks and six replaceable reflector blocks were taken out from reactor core in order to change neutron startup sources in 2015.

Journal Articles

Confirmation of seismic integrity of HTTR against 2011 Great East Japan Earthquake

Ono, Masato; Iigaki, Kazuhiko; Shimazaki, Yosuke; Shimizu, Atsushi; Inoi, Hiroyuki; Tochio, Daisuke; Hamamoto, Shimpei; Nishihara, Tetsuo; Takada, Shoji; Sawa, Kazuhiro; et al.

Proceedings of 24th International Conference on Nuclear Engineering (ICONE-24) (DVD-ROM), 12 Pages, 2016/06

On March 11th, 2011, the Great East Japan Earthquake of magnitude 9.0 occurred. When the great earthquake occurred, the HTTR had been stopped under the periodic inspection and maintenance of equipment and instrument. In the great earthquake, the maximum seismic acceleration observed at the HTTR exceeded the maximum value in seismic design. The visual inspection of HTTR facility was carried out for the seismic integrity conformation of HTTR. The seismic analysis was also carried out using the observed earthquake motion at HTTR site to confirm the integrity of HTTR. The concept of comprehensive integrity evaluation for the HTTR facility is divided into two parts. One is the inspection of equipment and instrument. The other is the seismic response analysis using the observed earthquake. For the basic inspections of equipment and instrument were performed for all them related to the operation of reactor. The integrity of the facilities is confirmed by comparing the inspection results or the numerical results with their evaluation criteria. As the result of inspection of equipment and instrument and seismic response analysis, it was judged that there was no problem to operate the reactor, because there was no damage and performance deterioration, which affects the reactor operation. The integrity of HTTR was also supported by the several operations without reactor power in cold conditions of HTTR in 2011, 2013 and 2015.

JAEA Reports

A Study of structure of base-isolated

; ; Yamazaki, Toshihiko; ; ; Kondo, Toshinari*; *

JNC TN8400 2001-030, 99 Pages, 2002/01

JNC-TN8400-2001-030.pdf:13.24MB

There is a great deal of that we build a Base-Isolated building with the quaternary deposit ground. In an atomic energy institution, a study request is strong. When we build a Base-Isolated building with the quaternary deposit ground, evaluation of earthquake vibration of a vertical direction is an important problem. In an atomic energy institution, we design it by big earthquake load, and therefore examination is necessary. And, in this study, we do examination to build a Base-Isolated building with the quaternary deposit ground, we report it about an evaluation method of a design. Furthermore, we report that we estimated pipe laying and machinery to put in a building of Base-lsolated.

JAEA Reports

None

; ; ; Yamazaki, Toshihiko; ; Kondo, Toshinari*

JNC TN8430 99-004, 64 Pages, 1999/03

JNC-TN8430-99-004.pdf:3.92MB

None

JAEA Reports

None

; Yamazaki, Toshihiko; Sakaguchi, Shinobu; *; ; ; Kondo, Toshinari*

PNC TN8410 98-011, 15 Pages, 1997/12

PNC-TN8410-98-011.pdf:4.17MB

None

JAEA Reports

None

; ; ; *; ; Yamazaki, Toshihiko; Kondo, Toshinari*

PNC TN8410 97-286, 41 Pages, 1997/09

PNC-TN8410-97-286.pdf:5.94MB

None

JAEA Reports

None

; ; ; *; ; Yamazaki, Toshihiko; Kondo, Toshinari*

PNC TN8410 97-124, 155 Pages, 1997/05

PNC-TN8410-97-124.pdf:6.63MB

None

JAEA Reports

None

; ; ; Kondo, Toshinari*

PNC TN8410 95-395, 96 Pages, 1995/12

PNC-TN8410-95-395.pdf:3.72MB

None

Oral presentation

Induction of male sterility in lily by ion-beam irradiation

Kondo, Masayoshi*; Koike, Yosuke*; Okudera, Yosuke*; Miyajima, Toshinari*; Nomizu, Toshikazu*; Hase, Yoshihiro; Yokota, Yuichiro; Kobayashi, Hitoshi*

no journal, , 

no abstracts in English

9 (Records 1-9 displayed on this page)
  • 1