Refine your search:     
Report No.
 - 
Search Results: Records 1-2 displayed on this page of 2
  • 1

Presentation/Publication Type

Initialising ...

Refine

Journal/Book Title

Initialising ...

Meeting title

Initialising ...

First Author

Initialising ...

Keyword

Initialising ...

Language

Initialising ...

Publication Year

Initialising ...

Held year of conference

Initialising ...

Save select records

JAEA Reports

Decommissioning of uranium handling facility for development of nuclear fuel manufacturing equipment

Kageyama, Tomio; Denuma, Akio; Koizumi, Jin*; Odakura, Manabu*; Haginoya, Masahiro*; Isaka, Shinichi*; Kadowaki, Hiroyuki*; Kobayashi, Shingo*; Morimoto, Taisei*; Kato, Yoshiaki*; et al.

JAEA-Technology 2022-033, 130 Pages, 2023/03

JAEA-Technology-2022-033.pdf:9.87MB

Uranium handling facility for development of nuclear fuel manufacturing equipment (Mockup room) was constructed in 1972. The Mockup room has a weak seismic resistance and is deteriorating with age. Also, the original purpose with this facility have been achieved and there are no new development plans using this facility. Therefore, interior equipment installed in this facility had been dismantled and removed since March 2019. After that, the Mockup room was inspected for contamination, and then controlled area in the Mockup room was cancelled on March 29th 2022. A total of 6,549 workers (not including security witnesses) were required for this work. The amount of non-radioactive waste generated by this work was 31,300 kg. The amount of radioactive waste generated by this work was 3,734 kg of combustible waste (103 drums), 4,393 kg of flame resistance waste (61 drums), 37,790 kg of non-combustible waste (124 drums, 19 containers). This report describes about the dismantling and removing the interior equipment in the Mockup room, the amount of waste generated by this work, and procedure for cancellation the controlled area in the facility.

JAEA Reports

Decommissioning of Pre-dismantling Temporary Waste Storage Facility 3 (FPG-03a,b,c) in Plutonium Fuel Production Facility

Shinozaki, Masaru; Aita, Takahiro; Iso, Takahito*; Odakura, Manabu*; Haginoya, Masahiro*; Kadowaki, Hiroyuki*; Kobayashi, Shingo*; Inagawa, Takumu*; Morimoto, Taisei*; Iso, Hidetoshi; et al.

JAEA-Technology 2021-043, 100 Pages, 2022/03

JAEA-Technology-2021-043.pdf:7.49MB

It is planned that the MOX (Mixed Oxide) from the decommissioned facilities in Nuclear Fuel Cycle Engineering Laboratories is going to be consolidated and stored stably and safely for a long term in Plutonium Fuel Production Facility of the Plutonium Fuel Development Center of Nuclear Fuel Cycle Engineering Laboratories. For this purpose, it is necessary to pelletize nuclear fuel materials in the facility and store them in the assembly storage (hereinafter referred to as "waste packaging work") to secure storage space in the plutonium material storage. As a countermeasure to reduce the facility risk in this waste packing work, it was decided to construct a new powder weighing and homogenization mixing facility to physically limit the amount (batch size) of nuclear fuel materials handled at the entrance of the process. In order to secure the installation space for the new facility in the powder preparation room (1) (FP-101), the pre-dismantling temporary waste storage facility 3 (FPG-03a, b, c) was dismantled and removed. This facility consists of a granulating and sizing facility, an additive mixing facility, and a receiving and delivering guided facility, which started to be used from January 1993, and was discontinued on February 3, 2012 and became a waste facility. Subsequently, the dismantling and removal of the interior equipment was carried out by pellet fabrication section for glove operation to reduce the amount of hold-up, and before the main dismantling and removal, there was almost no interior equipment except for large machinery. This report describes the dismantling and removal of the glove box and some interior equipment and peripherals of the facility, as well as the Green House setup method, dismantling and removal procedures, and issues specific to powder process equipment (dust, etc.).

2 (Records 1-2 displayed on this page)
  • 1