Refine your search:     
Report No.
 - 
Search Results: Records 1-2 displayed on this page of 2
  • 1

Presentation/Publication Type

Initialising ...

Refine

Journal/Book Title

Initialising ...

Meeting title

Initialising ...

First Author

Initialising ...

Keyword

Initialising ...

Language

Initialising ...

Publication Year

Initialising ...

Held year of conference

Initialising ...

Save select records

JAEA Reports

Removal of spent fuel sheared powder for decommissioning of Main Plant

Nishino, Saki; Okada, Jumpei; Watanabe, Kazuki; Furuuchi, Yuta; Yokota, Satoru; Yada, Yuji; Kusaka, Shota; Morokado, Shiori; Nakamura, Yoshinobu

JAEA-Technology 2023-011, 39 Pages, 2023/06

JAEA-Technology-2023-011.pdf:2.51MB

Tokai Reprocessing Plant (TRP) which shifted to decommissioning phase in 2014 had nuclear fuel materials such as the spent fuel sheared powder, the diluted plutonium solution and the uranium solution in a part of the reprocessing main equipment because TRP intended to resume reprocessing operations when it suspended the operations in 2007. Therefore, we have planned to remove these nuclear materials in sequence as Flush-out before beginning the decommissioning, and conducted removal of the spent fuel sheared powder as the first stage. The spent fuel sheared powder that had accumulated in the cell of the Main Plant (MP) as a result of the spent fuel shearing process was recovered from the cell floor, the shearing machine and the distributor between April 2016 and April 2017 as part of maintenance. Removing the recovered spent fuel sheared powder was conducted between June 2022 and September 2022. In this work, the recovered powder was dissolved in nitric acid at the dissolver in a small amount in order to remove it safely and early, and the dissolved solution was sent to the highly radioactive waste storage tanks without separating uranium and plutonium. Then, the dissolved solution transfer route was rinsed with nitric acid and water. Although about 15 years had passed since previous process operations, the removing work was successfully completed without any equipment failure because of the organization of a system that combines veterans experienced the operation with young workers, careful equipment inspections, and worker education and training. Removing this powder was conducted after revising the decommissioning project and obtaining approval from the Nuclear Regulation Authority owing to operating a part of process equipment.

JAEA Reports

Analysis work report on removal of spent fuel sheared powder for decommissioning of main plant

Aoya, Juri; Mori, Amami; Sato, Hinata; Kono, Soma; Morokado, Shiori; Horigome, Kazushi; Goto, Yuichi; Yamamoto, Masahiko; Taguchi, Shigeo

JAEA-Technology 2023-008, 34 Pages, 2023/06

JAEA-Technology-2023-008.pdf:1.92MB

Flush-out, by which nuclear materials in the Tokai Reprocessing Plant process are recovered, has been started in June 2022 as the first step of decommissioning. Flush-out consists of removal of spent fuel sheared powder, plutonium solution, uranium solution, and the other nuclear materials. Removal of spent fuel sheared powder has been completed in September 2022. During removal of spent fuel sheared powder, uranium concentration, plutonium concentration, acid concentration, radioactivity concentration, and solution density have been analyzed for process control. For nuclear material accountancy, uranium concentration, plutonium concentration, isotope ratio, and solution density have been analyzed. Analysis work including sample pretreatment before transportation to IAEA analytical facility for safeguards, and the other operations related to Flush-out such as calibration of analytical instruments, education, and training of operators are reported.

2 (Records 1-2 displayed on this page)
  • 1