Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Yamamoto, Kazami; Kinsho, Michikazu; Hayashi, Naoki; Saha, P. K.; Tamura, Fumihiko; Yamamoto, Masanobu; Tani, Norio; Takayanagi, Tomohiro; Kamiya, Junichiro; Shobuda, Yoshihiro; et al.
Journal of Nuclear Science and Technology, 59(9), p.1174 - 1205, 2022/09
Times Cited Count:1 Percentile:71.47(Nuclear Science & Technology)In the Japan Proton Accelerator Research Complex, the purpose of the 3 GeV rapid cycling synchrotron (RCS) is to accelerate a 1 MW, high-intensity proton beam. To achieve beam operation at a repetition rate of 25 Hz at high intensities, the RCS was elaborately designed. After starting the RCS operation, we carefully verified the validity of its design and made certain improvements to establish a reliable operation at higher power as possible. Consequently, we demonstrated beam operation at a high power, namely, 1 MW. We then summarized the design, actual performance, and improvements of the RCS to achieve a 1 MW beam.
Nakanoya, Takamitsu; Kamiya, Junichiro; Yoshimoto, Masahiro; Takayanagi, Tomohiro; Tani, Norio; Kotoku, Hirofumi*; Horino, Koki*; Yanagibashi, Toru*; Takeda, Osamu*; Yamamoto, Kazami
JAEA-Technology 2021-019, 105 Pages, 2021/11
Since a user operation startup, the 3 GeV synchrotron accelerator (Rapid-Cycling Synchrotron: RCS) gradually reinforced the beam power. As a result, the surface dose rate of the apparatus located at the beam injection area of the RCS, such as the magnet, vacuum chambers, beam monitors, etc., increases year by year. The beam injection area has many apparatuses which required manual maintenance, so reducing worker's dose is a serious issue. To solve this problem, we have organized a task force for the installation of the shield. The task force has aimed to optimize the structure of the radiation shield, construct the installation procedure with due consideration of the worker's dose suppression. As the examination result of the shield design, we have decided to adopt removal shielding that could be installed quickly and easily when needed. We carried out shield installation work during the 2020 summer maintenance period. The renewal work required to install the shielding has been carried out in a under high-dose environment. For this reason, reducing the dose of workers was an important issue. So, we carefully prepared the work plan and work procedure in advance. During the work period, we implemented various dose reduction measures and managed individual dose carefully. As a result, the dose of all workers could be kept below the predetermined management value. We had installed removal shielding at the beam injection area in the 2020 summer maintenance period. We confirmed that this shield can contribute to the reduction of the dose during work near the beam injection area. It was a large-scale work to occupy the beam injection area during almost of the summer maintenance period. However, it is considered very meaningful for dose suppression in future maintenance works.
Yamamoto, Kazami; Hatakeyama, Shuichiro; Otsu, Satoru*; Matsumoto, Tetsuro*; Yoshimoto, Masahiro
Proceedings of 18th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.494 - 498, 2021/10
J-PARC 3 GeV Rapid Cycling Synchrotron (RCS) provides more than 700 kW proton beam to the neutron target. In order to investigate the influence of the radiation, we intend to evaluate the radiations such as the neutron and gamma-rays, which are generated due to the proton beam loss. If the amount of beam loss is excessive, it becomes difficult to identify the individual neutron and gamma ray. Therefore, we investigated the signal rate of the extraction point of RCS. Preliminary result indicated that we can enough distinguish the neutron and gamma-ray by the liquid scintillator.
Nakanoya, Takamitsu; Kamiya, Junichiro; Yoshimoto, Masahiro; Takayanagi, Tomohiro; Tani, Norio; Kotoku, Hirofumi*; Horino, Koki*; Yanagibashi, Toru*; Takeda, Osamu*; Yamamoto, Kazami
Proceedings of 18th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.238 - 242, 2021/10
Since a user operation startup, the 3GeV synchrotron accelerator (Rapid-Cycling Synchrotron: RCS) gradually reinforced the beam power. As a result, the surface dose rate of the apparatus located at the beam injection area of the RCS increases year by year. The beam injection area has many apparatuses which required manual maintenance, so reducing worker's dose is a serious issue. To solve this problem, we have decided to adopt removal shielding that could be installed quickly and easily when needed. We carried out shield installation work during the 2020 summer maintenance period. The installation work of the shield has been carried out in a under high-dose environment. For this reason, reducing the dose of workers was an important issue. So, we carefully prepared the work plan and work procedure in advance. During the work period, we implemented various dose reduction measures and managed individual dose carefully. As a result, the dose of all workers could be kept below the predetermined management value. We had installed removal shielding at the beam injection area in the 2020 summer maintenance period. We confirmed that this shield can contribute to the reduction of the dose during work near the beam injection area.
Yoshimoto, Masahiro; Nakanoya, Takamitsu; Yamazaki, Yoshio; Saha, P. K.; Kinsho, Michikazu; Yamamoto, Shunya*; Okazaki, Hiroyuki*; Taguchi, Tomitsugu*; Yamada, Naoto*; Yamagata, Ryohei*
Proceedings of 18th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.850 - 854, 2021/10
no abstracts in English
Yamamoto, Kazami
Proceedings of 12th International Particle Accelerator Conference (IPAC 21) (Internet), p.3027 - 3030, 2021/08
The 3 GeV rapid cycling synchrotron (RCS) at the Japan Proton Accelerator Research Complex (J-PARC) provides more than 700 kW beams to the Material and Life Science Facility (MLF) and Main Ring (MR). In such a high-intensity hadron accelerator, even losing less than 0.1% of the beam can cause many problems. Such lost protons can cause serious radio-activation and accelerator component malfunctions. Therefore, we have been continuing a beam study to achieve high-power operation. In addition, we have also improved and maintained the accelerator components to establish a stable operation. This paper reports the status of the J-PARC RCS over the last two years.
Yamamoto, Kazami; Hatakeyama, Shuichiro; Saha, P. K.; Moriya, Katsuhiro; Okabe, Kota; Yoshimoto, Masahiro; Nakanoya, Takamitsu; Fujirai, Kosuke; Yamazaki, Yoshio; Suganuma, Kazuaki
EPJ Techniques and Instrumentation (Internet), 8(1), p.9_1 - 9_9, 2021/07
The 3 GeV Rapid Cycling Synchrotron at the Japan Proton Accelerator Research Complex supplies a high-intensity proton beam for neutron experiments. Various parameters are monitored to achieve a stable operation, and it was found that the oscillations of the charge-exchange efficiency and cooling water temperature were synchronized. We evaluated the orbit fluctuations at the injection point using a beam current of the injection dump, which is proportional to the number of particles that miss the foil and fail in the charge exchange, and profile of the injection beam. The total width of the fluctuations was approximately 0.072 mm. This value is negligible from the user operation viewpoint as our existing beam position monitors cannot detect such a small signal deviation. This displacement corresponds to a 1.6310
variation in the dipole magnetic field. Conversely, the magnetic field variation in the L3BT dipole magnet, which was estimated by the temperature change directly, is 4.08
10
. This result suggested that the change in the cooling water temperature is one of the major causes of the efficiency fluctuation.
Hotchi, Hideaki; Harada, Hiroyuki; Hayashi, Naoki; Kinsho, Michikazu; Okabe, Kota; Saha, P. K.; Shobuda, Yoshihiro; Tamura, Fumihiko; Yamamoto, Kazami; Yamamoto, Masanobu; et al.
JPS Conference Proceedings (Internet), 33, p.011018_1 - 011018_6, 2021/03
no abstracts in English
Hotchi, Hideaki; Harada, Hiroyuki; Hayashi, Naoki; Kinsho, Michikazu; Okabe, Kota; Saha, P. K.; Shobuda, Yoshihiro; Tamura, Fumihiko; Yamamoto, Kazami; Yamamoto, Masanobu; et al.
Journal of Instrumentation (Internet), 15(7), p.P07022_1 - P07022_16, 2020/07
Times Cited Count:3 Percentile:31.02(Instruments & Instrumentation)no abstracts in English
Hotchi, Hideaki
Physical Review Accelerators and Beams (Internet), 23(5), p.050401_1 - 050401_13, 2020/05
Times Cited Count:5 Percentile:65.07(Physics, Nuclear)no abstracts in English
Hotchi, Hideaki; Harada, Hiroyuki; Takayanagi, Tomohiro
Journal of Physics; Conference Series, 1350, p.012102_1 - 012102_5, 2019/11
Times Cited Count:1 Percentile:53.97Hotchi, Hideaki; Harada, Hiroyuki; Okabe, Kota; Saha, P. K.; Shobuda, Yoshihiro; Tamura, Fumihiko; Yoshimoto, Masahiro
Kasokuki, 16(2), p.109 - 118, 2019/07
no abstracts in English
Yamamoto, Kazami
Proceedings of 16th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.333 - 337, 2019/07
J-PARC 3GeV Synchrotron (RCS) started beam commissioning in 2007. The beam commissioning has been continued to increase the beam power for users. In a high-intensity hadron accelerator such as J-PARC, it is essentially important to reduce the activation due to beam loss and to suppress the exposure of workers. For this purpose, RCS has continued to study and countermeasure for the causes of beam loss from the initial stage of beam commissioning. At present, stable user operation is continuing at 500 kW. This value is half the design beam power of 1 MW, and the residual doses are being maintained enough small so that the maintenance work does not be hindered. In this report, we will introduce the history and measures of the residual doses in RCS so far, and the situation of the exposure dose of workers during maintenance work.
Hotchi, Hideaki; Harada, Hiroyuki; Hayashi, Naoki; Kinsho, Michikazu; Okabe, Kota; Saha, P. K.; Shobuda, Yoshihiro; Tamura, Fumihiko; Yamamoto, Kazami; Yamamoto, Masanobu; et al.
Proceedings of 16th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.574 - 578, 2019/07
no abstracts in English
Hatakeyama, Shuichiro*; Yamamoto, Kazami; Yoshimoto, Masahiro; Hayashi, Naoki
Proceedings of 16th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.789 - 793, 2019/07
The J-PARC Rapid Cycling Synchrotron (RCS) accelerates 400 MeV LINAC beams up to 3 GeV, and distributes them to the Materials Life Science Experiment Facility (MLF) and the Main Ring Synchrotron (MR) in 25 Hz cycle. To prevent radiation damages from the beam loss and also to detect failures of machines an interlock mechanism called the Machine Protection System (MPS) is introduced. If the beam is stopped by the MPS we should recover it quickly for the users of experiment facilities. The MPS related to the beam dynamics is usually diagnosed by beam loss monitors (BLM), beam position monitors (BPM) and current transformers (CT). Data of these monitors should be distinguished MLF or MR since the parameters for the magnet and the RF systems are different between MLF and MR. We confirmed validity of the method to distinguish the beam destination by using the information of the beam synchronized tag from the reflective memory (RFM) when taking the monitor data in 25 Hz.
J-PARC Center
JAEA-Evaluation 2019-003, 52 Pages, 2019/06
Evaluation Committee of Research Activities for J-PARC for interim assessment of Japan Proton Accelerator Research Complex evaluated the management and research activities of J-PARC center on the explanatory documents and oral presentations during the period from April 2015 to December 2018. This report summarizes the results of the assessment by the Committee with the Committee report attached.
Hotchi, Hideaki
FAS Dayori (Internet), (18), p.20 - 26, 2019/06
no abstracts in English
Hotchi, Hideaki; Harada, Hiroyuki; Takayanagi, Tomohiro
Proceedings of 10th International Particle Accelerator Conference (IPAC '19) (Internet), p.2009 - 2012, 2019/06
Yamamoto, Kazami; Kamiya, Junichiro
Proceedings of 10th International Particle Accelerator Conference (IPAC '19) (Internet), p.2020 - 2023, 2019/06
The 3 GeV rapid cycling synchrotron (RCS) at the Japan Proton Accelerator Research Complex (J-PARC) provides more than 500 kW beams to the Material and Life Science Experimental Facility and Main Ring synchrotron. In such a high-intensity hadron accelerator, even losing less than 0.1% of the beam can cause many problems. Such lost protons can cause serious radio-activation and accelerator component malfunctions. Therefore, we have conducted a beam study to achieve high-power operation with less loss. In addition, we have also maintained the accelerator components to enable stable operation. This paper reports the status of the J-PARC RCS over the last japan fiscal year.
Hotchi, Hideaki; J-PARC RCS Beam Commissioning Group
Proceedings of 61st ICFA Advanced Beam Dynamics Workshop on High-Intensity and High-Brightness Hadron Beams (HB 2018) (Internet), p.20 - 25, 2018/07
no abstracts in English