Refine your search:     
Report No.
 - 
Search Results: Records 1-20 displayed on this page of 100

Presentation/Publication Type

Initialising ...

Refine

Journal/Book Title

Initialising ...

Meeting title

Initialising ...

First Author

Initialising ...

Keyword

Initialising ...

Language

Initialising ...

Publication Year

Initialising ...

Held year of conference

Initialising ...

Save select records

Journal Articles

Latent ion tracks were finally observed in diamond

Amekura, Hiroshi*; Chettah, A.*; Narumi, Kazumasa*; Chiba, Atsuya*; Hirano, Yoshimi*; Yamada, Keisuke*; Yamamoto, Shunya*; Leino, A. A.*; Djurabekova, F.*; Nordlund, K.*; et al.

Nature Communications (Internet), 15, p.1786_1 - 1786_10, 2024/02

Injecting high-energy heavy ions in the electronic stopping regime into solids can create cylindrical damage zones called latent ion tracks. Although these tracks form in many materials, none have ever been observed in diamond, even when irradiated with high-energy GeV uranium ions. Here we report the first observation of ion track formation in diamond irradiated with 2-9 MeV C$$_{60}$$ fullerene ions. Depending on the ion energy, the mean track length (diameter) changed from 17 (3.2) nm to 52 (7.1) nm. High resolution scanning transmission electron microscopy (HR-STEM) indicated the amorphization in the tracks, in which $$pi$$-bonding signal from graphite was detected by the electron energy loss spectroscopy (EELS).

Journal Articles

Ion tracks in silicon formed by much lower energy deposition than the track formation threshold

Amekura, Hiroshi*; Toulemonde, M.*; Narumi, Kazumasa*; Li, R.*; Chiba, Atsuya*; Hirano, Yoshimi*; Yamada, Keisuke*; Yamamoto, Shunya*; Ishikawa, Norito; Okubo, Nariaki; et al.

Scientific Reports (Internet), 11(1), p.185_1 - 185_11, 2021/01

 Times Cited Count:12 Percentile:75.03(Multidisciplinary Sciences)

We report the track formation of 10 nm in diameter in silicon irradiated with 6 MeV C$$_{60}$$, i.e., much lower energy than the previously reported energy threshold.

Journal Articles

Matrix-material dependence on the elongation of embedded gold nanoparticles induced by 4 MeV C$$_{60}$$ and 200 MeV Xe ion irradiation

Li, R.*; Narumi, Kazumasa*; Chiba, Atsuya*; Hirano, Yu*; Tsuya, Daiju*; Yamamoto, Shunya*; Saito, Yuichi*; Okubo, Nariaki; Ishikawa, Norito; Pang, C.*; et al.

Nanotechnology, 31(26), p.265606_1 - 265606_9, 2020/06

 Times Cited Count:5 Percentile:33.01(Nanoscience & Nanotechnology)

We report the elongation of embedded Au nanoparticles (NPs) in three different matrices under irradiations of 4 MeV C$$_{60}$$ ions and 200 MeV Xe ions. Large elongation of Au NPs was observed for crystalline indium tin oxide (ITO) under both 4 MeV C$$_{60}$$ and 200 MeV Xe irradiation. The ITO layer preserved the crystallinity even after large elongation was induced. This is the first report of the elongation of metal NPs in a crystalline matrix.

Journal Articles

Current status of electrostatic accelerator at TIARA

Usui, Aya; Chiba, Atsuya; Yamada, Keisuke; Yokoyama, Akihito; Kitano, Toshihiko*; Takayama, Terumitsu*; Orimo, Takao*; Kanai, Shinji*; Aoki, Yuki*; Hashizume, Masashi*; et al.

Dai-28-Kai Tandemu Kasokuki Oyobi Sono Shuhen Gijutsu No Kenkyukai Hokokushu, p.117 - 119, 2015/12

no abstracts in English

Journal Articles

Present status of TIARA at JAEA

Yuyama, Takahiro; Ishibori, Ikuo; Kurashima, Satoshi; Yoshida, Kenichi; Ishizaka, Tomohisa; Chiba, Atsuya; Yamada, Keisuke; Yokoyama, Akihito; Usui, Aya; Miyawaki, Nobumasa; et al.

Proceedings of 12th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.302 - 304, 2015/09

no abstracts in English

Journal Articles

Current status of electrostatic accelerators at TIARA

Usui, Aya; Uno, Sadanori; Chiba, Atsuya; Yamada, Keisuke; Yokoyama, Akihito; Kitano, Toshihiko*; Takayama, Terumitsu*; Orimo, Takao*; Kanai, Shinji*; Aoki, Yuki*; et al.

Dai-27-Kai Tandemu Kasokuki Oyobi Sono Shuhen Gijutsu No Kenkyukai Hokokushu, p.118 - 121, 2015/03

no abstracts in English

Journal Articles

Dismantlement of large fusion experimental device JT-60U

Ikeda, Yoshitaka; Okano, Fuminori; Sakasai, Akira; Hanada, Masaya; Akino, Noboru; Ichige, Hisashi; Kaminaga, Atsushi; Kiyono, Kimihiro; Kubo, Hirotaka; Kobayashi, Kazuhiro; et al.

Nihon Genshiryoku Gakkai Wabun Rombunshi, 13(4), p.167 - 178, 2014/12

The JT-60U torus was disassembled so as to newly install the superconducting tokamak JT-60SA torus. The JT-60U used the deuterium for 18 years, so the disassembly project of the JT-60U was the first disassembly experience of a fusion device with radioactivation in Japan. All disassembly components were stored with recording the data such as dose rate, weight and kind of material, so as to apply the clearance level regulation in future. The lessons learned from the disassembly project indicated that the cutting technologies and storage management of disassembly components were the key factors to conduct the disassembly project in an efficient way. After completing the disassembly project, efforts have been made to analyze the data for characterizing disassembly activities, so as to contribute the estimation of manpower needs and the radioactivation of the disassembly components on other fusion devices.

Journal Articles

Safe disassembly and storage of radioactive components of JT-60U torus

Ikeda, Yoshitaka; Okano, Fuminori; Hanada, Masaya; Sakasai, Akira; Kubo, Hirotaka; Akino, Noboru; Chiba, Shinichi; Ichige, Hisashi; Kaminaga, Atsushi; Kiyono, Kimihiro; et al.

Fusion Engineering and Design, 89(9-10), p.2018 - 2023, 2014/10

 Times Cited Count:2 Percentile:16.44(Nuclear Science & Technology)

Disassembly of the JT-60U torus was started in 2009 after 18-years D$$_{2}$$ operations, and was completed in October 2012. The JT-60U torus was featured by the complicated and welded structure against the strong electromagnetic force, and by the radioactivation due to D-D reactions. Since this work is the first experience of disassembling a large radioactive fusion device in Japan, careful disassembly activities have been made. About 13,000 components cut into pieces with measuring the dose rates were removed from the torus hall and stored safely in storage facilities by using a total wokers of 41,000 person-days during 3 years. The total weight of the disassembly components reached up to 5,400 tons. Most of the disassembly components will be treated as non-radioactive ones after the clearance verification under the Japanese regulation in future. The assembly of JT-60SA has started in January 2013 after this disassembly of JT-60U torus.

Journal Articles

Status report on technical developments of electrostatic accelerators

Yamada, Keisuke; Saito, Yuichi; Ishii, Yasuyuki; Matoba, Shiro; Chiba, Atsuya; Yokoyama, Akihito; Usui, Aya; Sato, Takahiro; Okubo, Takeru; Uno, Sadanori

JAEA-Review 2013-059, JAEA Takasaki Annual Report 2012, P. 159, 2014/03

no abstracts in English

Journal Articles

Operation of electrostatic accelerators

Uno, Sadanori; Chiba, Atsuya; Yamada, Keisuke; Yokoyama, Akihito; Usui, Aya; Saito, Yuichi; Ishii, Yasuyuki; Sato, Takahiro; Okubo, Takeru; Nara, Takayuki; et al.

JAEA-Review 2013-059, JAEA Takasaki Annual Report 2012, P. 179, 2014/03

Three electrostatic accelerators at TIARA were operated on schedule in fiscal year 2012 except changing its schedule by cancellations of users. The yearly operation time of the 3 MV tandem accelerator, the 400 kV ion implanter and the 3MV single-ended accelerator were in the same levels as the ordinary one, whose operation time totaled to 2,073, 1,847 and 2,389 hours, respectively. The tandem accelerator had no trouble, whereas the ion implanter and the single-ended accelerator stopped by any troubles for one day and four days, respectively. The molecular ion beam of helium hydride was generated by the ion implanter, because the users required irradiation of several cluster ions in order to study the effect of irradiation. As a result, its intensity of beam was 50 nA at 200 kV. The ion beam of tungsten (W) at 15 MeV was accelerated by the tandem accelerator, whose intensity was 20 nA at charge state of 4+, because of the request from a researcher in the field of nuclear fusion.

Journal Articles

Current status of electrostatic accelerators at TIARA

Uno, Sadanori; Chiba, Atsuya; Yamada, Keisuke; Yokoyama, Akihito; Usui, Aya; Kitano, Toshihiko*; Takayama, Terumitsu*; Orimo, Takao*; Kanai, Shinji*; Aoki, Yuki*; et al.

Dai-26-Kai Tandemu Kasokuki Oyobi Sono Shuhen Gijutsu No Kenkyukai Hokokushu, p.79 - 81, 2013/07

Three electrostatic accelerators at TIARA were operated on schedule in fiscal year 2012 except changing its schedule by cancellations of users. The yearly operation time of the 3MV tandem accelerator, the 400 kV ion implanter and the 3 MV single-ended accelerator were in the same levels as the ordinary one, whose operation time totaled to 2,073, 1,847 and 2,389 hours, respectively. The tandem accelerator had no trouble, whereas the ion implanter and the single-ended accelerator stopped by any troubles for one day and four days, respectively. The ion implanter generated molecular ion beam of helium hydride by using the Freeman type ion source, because of the request from the user. As a result, its intensity of beam was 50 nA at 200 kV.

Journal Articles

Development of beam generation and irradiation technology for electrostatic accelerators

Yamada, Keisuke; Chiba, Atsuya; Yokoyama, Akihito; Saito, Yuichi; Ishii, Yasuyuki; Sato, Takahiro; Okubo, Takeru; Uno, Sadanori

JAEA-Review 2012-046, JAEA Takasaki Annual Report 2011, P. 155, 2013/01

no abstracts in English

Journal Articles

Operation of electrostatic accelerators

Uno, Sadanori; Chiba, Atsuya; Yamada, Keisuke; Yokoyama, Akihito; Saito, Yuichi; Ishii, Yasuyuki; Sato, Takahiro; Okubo, Takeru; Nara, Takayuki; Kitano, Toshihiko*; et al.

JAEA-Review 2012-046, JAEA Takasaki Annual Report 2011, P. 173, 2013/01

The three electrostatic accelerators at the TIARA had no mechanical damage when the Tohoku earthquake happened on March 11, 2011. But, they could not be operated during April, due to the influence of planned power outage by TEPCO. These accelerators additionally operated on Saturday for ten days in order to compensate for the lost experiment time. As a result, the yearly operation time had kept the same level as the ordinary one. The ion beam of erbium (Er) with 11.7MeV was accelerated newly by the tandem accelerator, whose intensity was 20nA at charge state of 3+. The sequential generation/irradiation of two different kinds of fullerene ions was achieved at the ion implanter by a mixed powder method without exchange of the Freeman type ion source by the user's request.

Journal Articles

Operation of electrostatic accelerators at TIARA

Uno, Sadanori; Chiba, Atsuya; Yamada, Keisuke; Yokoyama, Akihito; Saito, Yuichi; Ishii, Yasuyuki; Sato, Takahiro; Okubo, Takeru; Nara, Takayuki; Kitano, Toshihiko*; et al.

Dai-7-Kai Takasaki Oyo Kenkyu Shimpojiumu Yoshishu, P. 119, 2012/10

The three electrostatic accelerators at TIARA had no damage when the Tohoku earthquake happened on March 11, 2011. But, they could not be operated until end of April, due to the influence of planned power outage and keep out into the controlled area for radiation. These accelerators additionally operated on Saturday for twelve days in order to compensate for the lost experiment time. Therefore, the yearly operation time had kept the same level as the ordinary one. The tandem accelerator has stopped leakage of the SF$$_{6}$$ gas from the base flange on the tank by the Viton gasket of rectangular cross section at the new type.

Journal Articles

Current status of electrostatic accelerators at TIARA

Uno, Sadanori; Chiba, Atsuya; Yamada, Keisuke; Yokoyama, Akihito; Kitano, Toshihiko*; Takayama, Terumitsu*; Orimo, Takao*; Kanai, Shinji*; Aoki, Yuki*; Yamada, Naoto*; et al.

Dai-25-Kai Tandemu Kasokuki Oyobi Sono Shuhen Gijutsu No Kenkyukai Hokokushu, p.64 - 66, 2012/07

The three electrostatic accelerators at the TIARA had no damage when the Tohoku earthquake happened on March 11, 2011. But, they could not be operated until end of April, due to the influence of planned power outage and keep out into the controlled area for radiation. These accelerators additionally operated on Saturday for twelve days in order to compensate for the lost experiment time. Therefore, the yearly operation time had kept the same level as the ordinary one. The tandem accelerator has stopped leakage of the SF$$_{6}$$ gas from the base flange on the tank by the Viton gasket of rectangular cross section at the new type. The ion implanter could generate two kinds of fullerene ions by a mixed material of ions and a controlled temperature of the oven without exchange of ion source.

Journal Articles

Development of beam generation and irradiation technology for electrostatic accelerators

Yokoyama, Akihito; Uno, Sadanori; Chiba, Atsuya; Yamada, Keisuke; Saito, Yuichi; Ishii, Yasuyuki; Sato, Takahiro; Okubo, Takeru; Agematsu, Takashi

JAEA-Review 2011-043, JAEA Takasaki Annual Report 2010, P. 158, 2012/01

no abstracts in English

Journal Articles

Operation of the electrostatic accelerators

Agematsu, Takashi; Uno, Sadanori; Chiba, Atsuya; Yamada, Keisuke; Yokoyama, Akihito; Saito, Yuichi; Ishii, Yasuyuki; Sato, Takahiro; Okubo, Takeru; Yokota, Wataru; et al.

JAEA-Review 2011-043, JAEA Takasaki Annual Report 2010, P. 173, 2012/01

Three electrostatic accelerators of TIARA were operated smoothly in FY 2010, and all the planned experiments were carried out except those canceled by users or the impact of Great East Japan Earthquake on March 11, 2011. On the other hand, Saturday operation for experiments was carried out after October on the Global Nuclear-Human Resource Development Initiative. The yearly operation time of the tandem accelerator, the single-ended accelerator and the ion implanter amounted to 2116, 2367 and 1800 hours, respectively, which were similar to those of usual years. Regarding the single-ended accelerator, the generator in the high-voltage terminal failed and was replaced with new one. A switching magnet was installed for a new branch beam line of the ion implanter. As to the tandem accelerator, In ion was generated and accelerated at intensity of 500 nA.

Journal Articles

Status of TIARA facility

Yamada, Keisuke; Nara, Takayuki; Ishibori, Ikuo; Kurashima, Satoshi; Yoshida, Kenichi; Yuyama, Takahiro; Ishizaka, Tomohisa; Agematsu, Takashi; Uno, Sadanori; Chiba, Atsuya; et al.

Proceedings of 8th Annual Meeting of Particle Accelerator Society of Japan (Internet), 3 Pages, 2011/08

no abstracts in English

Journal Articles

Current status of electrostatic accelerators at TIARA

Uno, Sadanori; Chiba, Atsuya; Yamada, Keisuke; Yokoyama, Akihito; Agematsu, Takashi; Kitano, Toshihiko*; Takayama, Terumitsu*; Orimo, Takao*; Kanai, Shinji*; Aoki, Yuki*; et al.

Dai-24-Kai Tandemu Kasokuki Oyobi Sono Shuhen Gijutsu No Kenkyukai Hokokushu, p.125 - 128, 2011/07

The yearly operation time of three electrostatic accelerators at TIARA of Japan Atomic Energy Agency is keeping the same level since 2000, the tandem accelerator, the ion implanter and the single-ended accelerator amounted to about 2000, 1900 and 2500 hours, respectively. Three electrostatic accelerators did not have damage when the Tohoku Earthquake occurred on March 11, 2011. However, these accelerators were not able to operate during the planned power outage by Tokyo Electric Power Company (TEPCO). The tandem accelerator accelerated ion beam of In, which gave intensity of 500nA with stability. Additionally, the ion implanter generated maximum 400nA at ion beam of Gd, which was used in experiments for the users.

Journal Articles

Evaluation of HLW glass dissolution/alteration kinetics by using micro-channel flow-through test method; Initial glass dissolution rate as a function of pH and temperature

Inagaki, Yaohiro*; Sakatani, Keiichi*; Yamamura, Yuki*; Mitsui, Seiichiro; Noshita, Kenji*; Miura, Yoshiyuki*; Kanehira, Norio*; Ochi, Eiji*; Mukunoki, Atsushi*; Chiba, Tamotsu*

Dai-7-Kai Saishori, Risaikuru Bukai Semina Tekisuto, p.136 - 137, 2011/01

Conventional static test methods are not appropriate to evaluate glass dissolution behavior at an arbitrarily-fixed condition due to compositional change of the solution with glass dissolution. In this study, we applied a newly-devised micro-channel flow-through test method to measurement of the initial dissolution rates of Japanese simulated waste glasses, JAEA-P0798 and JNFL-KMOC, at arbitrarily-fixed conditions and we evaluated temperature and pH dependence of glass dissolution. The results showed that the initial dissolution rate increased with temperature and had "V-shaped" pH dependence at each temperature.

100 (Records 1-20 displayed on this page)