Refine your search:     
Report No.
 - 
Search Results: Records 1-2 displayed on this page of 2
  • 1

Presentation/Publication Type

Initialising ...

Refine

Journal/Book Title

Initialising ...

Meeting title

Initialising ...

First Author

Initialising ...

Keyword

Initialising ...

Language

Initialising ...

Publication Year

Initialising ...

Held year of conference

Initialising ...

Save select records

JAEA Reports

Report of lower end plug welding, and test and inspection for the JOYO 6th refueling core fuel assembly

Kajiyama, Tadashi; Numata, Kazuaki; Otani, Seiji; *; *; Goto, Tatsuro*; Takahashi, Hideki*

JNC TN8440 2000-010, 45 Pages, 2000/02

JNC-TN8440-2000-010.pdf:1.45MB

This report describes about procedure and consequence of the welding process of the cladding tube and the lower end plug, the process of the test and inspection and the process of shipment for the 6th refueling core fuel assembly (46 fuel assemblies) of the experimental fast reactor JOYO. These works were carried out on July, 1996 from January, 1993 in Tamatukuri inspection branch of quality assurance section, technical administration division, plutonium fuel center. The 6th refueling core fuel assemblies are two kinds of the fuel assembly (1) and (2). The material of the lower end plug and the cladding tube used for the fuel assembly (1) is the type 316 stainless steel grade (here in after referred to as SUS316 grade) and austenitic stainless steel of high nickel content (here in after referred to as PNC 1520). That material used for the fuel assembly (2) is all SUS316 grade. The result of welding and the inspection is shown in the following table.

JAEA Reports

Report of lower endplug welding, and testing and inspecting result for MONJU 1$$^{st}$$ reload core fuel assembly

Kajiyama, Tadashi; Numata, Kazuaki; Otani, Seiji; *; *; Goto, Tatsuro*; Takahashi, Hideki*

JNC TN8440 2000-008, 34 Pages, 2000/02

JNC-TN8440-2000-008.pdf:2.13MB

The procedure and result of lower endplug welding, Test and Inspection and Shipment of the 1$$^{st}$$ reload core fuel assembly (80 Fuel Assemblies) for the fast breeder reactor MONJU should be report, which had examined and inspected in Tamatsukuri Branch, Material Insurance office, Quality Assurance Section, Technical Administration Division, Plutonium Fuel Center (before: Inspection Section, Plutonium Fuel Division), from June 1994 to January 1996. The number of cladding tubes welded to the endplug were total to 13,804, 7,418 for Core - Inside of 43 fuel Assemblies and 6,386 for Core-Outside of 37 fuel Assemblies. 13,794 of them, 7,414 Core-Inside and 6,379 Core-Outside were approved by the test and sent to Plutonium Fuel Center. 10 of them weren't approved mainly because of default welding. Disapproval rating is 0.07%.

2 (Records 1-2 displayed on this page)
  • 1