Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Sakaguchi, Shinobu; Tachibana, Ikuya; Koshino, Katsuhiko; Shirozu, Hidetomo; Shirai, Nobutoshi; Imamoto, Nobuo; Tomita, Tsuneo; Tobita, Hiroo; Yamanaka, Atsushi; Kobayashi, Daisuke; et al.
JAEA-Technology 2011-006, 24 Pages, 2011/03
In the Niigataken Chuetsu-oki Earthquake on 2007, observed earthquake motion exceeded design base at the Kashiwazaki Kariwa nuclear plant. However, there was no earthquake damage in safety important equipments to stop reactor, to cool reactor, and to contain radioactive materials. One of this reason is said that many safety margin are included in the design and the permissible value. To know more accurate safety margin, shearing force examinations for the base bolts were conducted. In examinations, delegate test-bolts were made; the test bolts were selected from heavier equipment in Tokai Reprocessing Plant. In this report, the shearing strength obtained from the examinations shows more accurate safety margin.
; ; ;
JNC TN8450 2001-013, 24 Pages, 2002/03
Typical maintenance activities, such as replacement of worn out parts and cleaning of filter elements, routinely performed during steady operation are summarized. "The Summary of Typical Routine Maintenance Activities at Tokai Reprocessing Plant" (JNC TN 8450 2001-006) was already prepared in September, 2001. The purpose of this summary is to give elementary understanding on these activities to people who are responsible for explanation them to the public. At this time, the same kind of summary is prepared as a supplement of the previous one.
; ; ;
JNC TN8450 2001-006, 861 Pages, 2001/09
Typical maintenance activities, such as replacement of worn out parts and cleaning of filter elements, routinely performed during steady operation are summarized. The purpose of this summary is to give elementary understanding on these activities to people who are responsible for explain them to the public. This summary also includes glossary and flow diagram with basic data.
; ; ;
JNC TN8450 2000-009, 160 Pages, 2000/12
An internal meeting to report the results of 00-1 Campaign was held to share information among employee of Tokai Reprocessing Center. The papers presented at the meeting are collected for the convenience of users.
; ; ;
JNC TN8450 2000-006, 700 Pages, 2000/09
Typical maintenance activities, such as replacement of worn out parts and cleaning of filter elements, routinely performed during steady operation are summarized. The purpose of this summary is to give elementary understanding on these activities to people who are responsible for explain them to the public. This summary also includes glossary and flow diagram with basic data.
; ; Ishibashi, Takashi;
Asufuaruto Koka No Anzen To Seino Hyoka Ni Kansuru Kokusai Wakushoppu, 0 Pages, 1999/00
None
; ; Miyazaki, Hitoshi; ; Tanimoto, Kenichi; Terunuma, Seiichi
PNC TN9420 95-011, 13 Pages, 1994/10
None
; Miyazaki, Hitoshi; ; Tanimoto, Kenichi; Terunuma, Seiichi
PNC TN9420 94-010, 103 Pages, 1994/04
None
; Enokido, Yuji;
Proceedings of 2nd ASME-JSME International Conference on Nuclear Engineering (ICONE-2), p.813 - 819, 1993/00
None
Tanimoto, Kenichi; ; ; Kikuchi, Yutaka; ; Enokido, Yuji
Donen Giho, (84), p.21 - 34, 1992/12
None
; ; ; Tanimoto, Kenichi; Enokido, Yuji
PNC TN9410 92-208, 68 Pages, 1992/07
The plan of the gelogic disposal of high level waste that need to do estimate the effect of radiation in near field surrouding waste. We have applied "JOYO" spent fuel storage pool as irradiation field and investigated the effect of gamma radiation about quality of groundwater, because we have to obtained a basic data related geologic dispose under irradiaton condition. The experiment was applied artificial brine for simulated groundwater. The same samples were located in "JOYO" spent fuel storage pool without gamma radiation and other effects were estimated. The samples were also observed the variation of quality of artifical brine every fixed time after irradiation and were estimated the effect as the function of time, gamma irradiation were carried out from 24hours (1.010
1.3
10
Gy) to 1440 hours (4.4
10
6.8
10
Gy). The results indicate the following. (1)The change of pH, conductivity and ion concentrations in artifical brine could not be observed in the samples before and after irradiation. (2)Eh of the samples was 241mV before irradiation, but it decreased 156mV after irradiaton for 1440 hours. Eh tend to decrease by increase of the absorption dose. (3)Do of the samples before and after irradiation for 1440 hours were 20.76 and 5930
g/
, respectively. Do tend to increases by increase of the absorption dose. (4)Before and after irradiation test for 480 hours, nitric ion was detected 2.9 and 105ppm, respectively, In no gamma irradiaton test, nitric ion was detdcted 4.0 and 5.6ppm, respectively. For 1440 hours, nitric ion was detected 15ppm after irradiation and 11ppm after rest without gamma irradiation. (5)pH, Eh, Do, conductivity and all ion concentrations in artifical brine have no the variation as the function ot time within fixed time (about 4hours) after irradiation. These results suggest that oxygen which were generated by the gamma radiolysis of water was incrased Do, ...
; Nakano, Tomoyuki; ; ; Asami, Makoto*; Tanimoto, Kenichi; Enokido, Yuji
PNC TN9080 92-001, 107 Pages, 1992/01
None
Dekomisshoningu Giho, (3), p.56 - 66, 1991/01