Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Yoshida, Masahiro*; Ishii, Kenji; Naka, Makoto*; Ishihara, Sumio*; Jarrige, I.*; Ikeuchi, Kazuhiko*; Murakami, Yoichi*; Kudo, Kazutaka*; Koike, Yoji*; Nagata, Tomoko*; et al.
Scientific Reports (Internet), 6, p.23611_1 - 23611_8, 2016/03
Times Cited Count:1 Percentile:11.46(Multidisciplinary Sciences)Eguchi, Shohei; Koike, Sumio; Takemoto, Noriyuki; Tanimoto, Masataka; Kusunoki, Tsuyoshi
UTNL-R-0492, p.9_1 - 9_8, 2016/03
no abstracts in English
Onoue, Ryuji; Kawamata, Takanori; Otsuka, Kaoru; Sekine, Katsunori; Koike, Sumio; Gorai, Shigeru; Nishiyama, Yutaka; Fukasaku, Akitomi
JAEA-Review 2012-010, 116 Pages, 2012/03
JMTR is a light water moderated and cooled tank-type reactor, and its thermal power is 50 MW. The JMTR is categorized as high flux testing reactors in the world. The JMTR has been utilized for irradiation experiments of nuclear fuels and materials, as well as for radioisotope productions since the first criticality in March 1968 until August 2006. JAEA is decided to refurbish the JMTR as an important fundamental infrastructure to promote the nuclear research and development. And The JMTR refurbishment work is carried out for 4 years from 2007. Before refurbishment work, from August 2006 to March 2007, all concerned renewal facilities were selected from evaluation on their damage and wear in terms of aging. Facilities which replacement parts are no longer manufactured or not likely to be manufactured continuously in near future, are selected as renewal ones. Replace priority was decided with special attention to safety concerns. A monitoring of aging condition by the regular maintenance activity is an important factor in selection of continuous using after the restart. In this report, renewal of the cooling system within refurbishment facilities in the JMTR is summarized.
Onoue, Ryuji; Kawamata, Takanori; Otsuka, Kaoru; Koike, Sumio; Nishiyama, Yutaka; Fukasaku, Akitomi
JAEA-Review 2011-018, 17 Pages, 2011/06
JMTR is a light water moderated and cooled tank-type reactor, and its thermal power is 50 MW. The JMTR is categorized as high flux testing reactors in the world. The JMTR has been utilized for irradiation experiments of nuclear fuels and materials, as well as for radioisotope productions since the first criticality in March 1968 until August 2006. JAEA decided to refurbish the JMTR as an important fundamental infrastructure to promote the nuclear research and development. The refurbishment work was started from 2007, and restart is planned in 2011. Renewal facilities were selected from evaluation on their damage and wear in terms of aging. Facilities whose replacement parts are no longer manufactured or not likely to be manufactured continuously in near future, are selected as renewal ones. Replacement priority was decided with special attention to safety concerns. A monitoring of aging condition by the regular maintenance activity is an important factor in selection of continuous using after the restart. In this report, renewal of the cooling system within refurbishment facilities in the JMTR is summarized.
Koike, Sumio; Gorai, Shigeru; Onoue, Ryuji; Otsuka, Kaoru
JAEA-Review 2010-007, 36 Pages, 2010/07
Prior to the JMTR refurbishment, verification on reliability of the heat exchangers for primary cooling system was carried out to investigate an integrity of continuously use component. From a result of the significant corrosion, decrease of tube thickness, crack were not observed on the heat exchangers, and integrity of heat exchangers were confirmed. In the long terms usage of the heat exchangers, the maintenance based on periodical inspection and a long-term maintenance plan is scheduled.
Ebisawa, Hiroyuki; Hanakawa, Hiroki; Asano, Norikazu; Kusunoki, Hidehiko; Yanai, Tomohiro; Sato, Shinichi; Miyauchi, Masaru; Oto, Tsutomu; Kimura, Tadashi; Kawamata, Takanori; et al.
JAEA-Technology 2009-030, 165 Pages, 2009/07
The condition of facilities and machinery used continuously were investigated before the renewal work of JMTR on FY 2007. The subjects of investigation were reactor building, primary cooling system tanks, secondary cooling system piping and tower, emergency generator and so on. As the result, it was confirmed that some facilities and machinery were necessary to repair and others were used continuously for long term by maintaining on the long-term maintenance plan. JMTR is planed to renew by the result of this investigation.
Tabata, Toshio; Komukai, Bunsaku; Nagao, Yoshiharu; Shimakawa, Satoshi; Koike, Sumio; Takeda, Takashi; Fujiki, Kazuo
JAERI-Tech 99-021, 68 Pages, 1999/03
no abstracts in English
Nagaoka, Yoshiharu; Komukai, Bunsaku; ; Koike, Sumio; Saito, Minoru;
JAERI-M 92-098, 81 Pages, 1992/07
no abstracts in English
Koike, Sumio; Onoue, Ryuji; Ebisawa, Hiroyuki; Nemoto, Hiroyoshi; Takahashi, Kunihiro; Kaminaga, Masanori
no journal, ,
no abstracts in English
Ishii, Kenji; Yoshida, Masahiro; Jarrige, I.; Ikeuchi, Kazuhiko*; Murakami, Yoichi*; Mizuki, Junichiro; Ishihara, Sumio*; Tsutsui, Kenji; Toyama, Takami*; Maekawa, Sadamichi; et al.
no journal, ,
Kawamata, Takanori; Otsuka, Kaoru; Sekine, Katsunori; Onoue, Ryuji; Koike, Sumio; Nishiyama, Yutaka
no journal, ,
no abstracts in English