Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Shinozaki, Masaru; Aita, Takahiro; Iso, Takahito*; Odakura, Manabu*; Haginoya, Masahiro*; Kadowaki, Hiroyuki*; Kobayashi, Shingo*; Inagawa, Takumu*; Morimoto, Taisei*; Iso, Hidetoshi; et al.
JAEA-Technology 2021-043, 100 Pages, 2022/03
It is planned that the MOX (Mixed Oxide) from the decommissioned facilities in Nuclear Fuel Cycle Engineering Laboratories is going to be consolidated and stored stably and safely for a long term in Plutonium Fuel Production Facility of the Plutonium Fuel Development Center of Nuclear Fuel Cycle Engineering Laboratories. For this purpose, it is necessary to pelletize nuclear fuel materials in the facility and store them in the assembly storage (hereinafter referred to as "waste packaging work") to secure storage space in the plutonium material storage. As a countermeasure to reduce the facility risk in this waste packing work, it was decided to construct a new powder weighing and homogenization mixing facility to physically limit the amount (batch size) of nuclear fuel materials handled at the entrance of the process. In order to secure the installation space for the new facility in the powder preparation room (1) (FP-101), the pre-dismantling temporary waste storage facility 3 (FPG-03a, b, c) was dismantled and removed. This facility consists of a granulating and sizing facility, an additive mixing facility, and a receiving and delivering guided facility, which started to be used from January 1993, and was discontinued on February 3, 2012 and became a waste facility. Subsequently, the dismantling and removal of the interior equipment was carried out by pellet fabrication section for glove operation to reduce the amount of hold-up, and before the main dismantling and removal, there was almost no interior equipment except for large machinery. This report describes the dismantling and removal of the glove box and some interior equipment and peripherals of the facility, as well as the Green House setup method, dismantling and removal procedures, and issues specific to powder process equipment (dust, etc.).
Yamamoto, Kazami; Kinsho, Michikazu; Hayashi, Naoki; Saha, P. K.; Tamura, Fumihiko; Yamamoto, Masanobu; Tani, Norio; Takayanagi, Tomohiro; Kamiya, Junichiro; Shobuda, Yoshihiro; et al.
Journal of Nuclear Science and Technology, 32 Pages, 2022/02
Times Cited Count:0 Percentile:0.03(Nuclear Science & Technology)In the Japan Proton Accelerator Research Complex, the purpose of the 3 GeV rapid cycling synchrotron (RCS) is to accelerate a 1 MW, high-intensity proton beam. To achieve beam operation at a repetition rate of 25 Hz at high intensities, the RCS was elaborately designed. After starting the RCS operation, we carefully verified the validity of its design and made certain improvements to establish a reliable operation at higher power as possible. Consequently, we demonstrated beam operation at a high power, namely, 1 MW. We then summarized the design, actual performance, and improvements of the RCS to achieve a 1 MW beam.
Nakanoya, Takamitsu; Kamiya, Junichiro; Yoshimoto, Masahiro; Takayanagi, Tomohiro; Tani, Norio; Kotoku, Hirofumi*; Horino, Koki*; Yanagibashi, Toru*; Takeda, Osamu*; Yamamoto, Kazami
JAEA-Technology 2021-019, 105 Pages, 2021/11
Since a user operation startup, the 3 GeV synchrotron accelerator (Rapid-Cycling Synchrotron: RCS) gradually reinforced the beam power. As a result, the surface dose rate of the apparatus located at the beam injection area of the RCS, such as the magnet, vacuum chambers, beam monitors, etc., increases year by year. The beam injection area has many apparatuses which required manual maintenance, so reducing worker's dose is a serious issue. To solve this problem, we have organized a task force for the installation of the shield. The task force has aimed to optimize the structure of the radiation shield, construct the installation procedure with due consideration of the worker's dose suppression. As the examination result of the shield design, we have decided to adopt removal shielding that could be installed quickly and easily when needed. We carried out shield installation work during the 2020 summer maintenance period. The renewal work required to install the shielding has been carried out in a under high-dose environment. For this reason, reducing the dose of workers was an important issue. So, we carefully prepared the work plan and work procedure in advance. During the work period, we implemented various dose reduction measures and managed individual dose carefully. As a result, the dose of all workers could be kept below the predetermined management value. We had installed removal shielding at the beam injection area in the 2020 summer maintenance period. We confirmed that this shield can contribute to the reduction of the dose during work near the beam injection area. It was a large-scale work to occupy the beam injection area during almost of the summer maintenance period. However, it is considered very meaningful for dose suppression in future maintenance works.
Nakanoya, Takamitsu; Kamiya, Junichiro; Yoshimoto, Masahiro; Takayanagi, Tomohiro; Tani, Norio; Kotoku, Hirofumi*; Horino, Koki*; Yanagibashi, Toru*; Takeda, Osamu*; Yamamoto, Kazami
Proceedings of 18th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.238 - 242, 2021/10
Since a user operation startup, the 3GeV synchrotron accelerator (Rapid-Cycling Synchrotron: RCS) gradually reinforced the beam power. As a result, the surface dose rate of the apparatus located at the beam injection area of the RCS increases year by year. The beam injection area has many apparatuses which required manual maintenance, so reducing worker's dose is a serious issue. To solve this problem, we have decided to adopt removal shielding that could be installed quickly and easily when needed. We carried out shield installation work during the 2020 summer maintenance period. The installation work of the shield has been carried out in a under high-dose environment. For this reason, reducing the dose of workers was an important issue. So, we carefully prepared the work plan and work procedure in advance. During the work period, we implemented various dose reduction measures and managed individual dose carefully. As a result, the dose of all workers could be kept below the predetermined management value. We had installed removal shielding at the beam injection area in the 2020 summer maintenance period. We confirmed that this shield can contribute to the reduction of the dose during work near the beam injection area.
Yoshimoto, Masahiro; Nakanoya, Takamitsu; Yamazaki, Yoshio; Saha, P. K.; Kinsho, Michikazu; Yamamoto, Shunya*; Okazaki, Hiroyuki*; Taguchi, Tomitsugu*; Yamada, Naoto*; Yamagata, Ryohei*
Proceedings of 18th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.850 - 854, 2021/10
no abstracts in English
Yamamoto, Kazami; Hatakeyama, Shuichiro; Saha, P. K.; Moriya, Katsuhiro; Okabe, Kota; Yoshimoto, Masahiro; Nakanoya, Takamitsu; Fujirai, Kosuke; Yamazaki, Yoshio; Suganuma, Kazuaki
EPJ Techniques and Instrumentation (Internet), 8(1), p.9_1 - 9_9, 2021/07
The 3 GeV Rapid Cycling Synchrotron at the Japan Proton Accelerator Research Complex supplies a high-intensity proton beam for neutron experiments. Various parameters are monitored to achieve a stable operation, and it was found that the oscillations of the charge-exchange efficiency and cooling water temperature were synchronized. We evaluated the orbit fluctuations at the injection point using a beam current of the injection dump, which is proportional to the number of particles that miss the foil and fail in the charge exchange, and profile of the injection beam. The total width of the fluctuations was approximately 0.072 mm. This value is negligible from the user operation viewpoint as our existing beam position monitors cannot detect such a small signal deviation. This displacement corresponds to a 1.6310
variation in the dipole magnetic field. Conversely, the magnetic field variation in the L3BT dipole magnet, which was estimated by the temperature change directly, is 4.08
10
. This result suggested that the change in the cooling water temperature is one of the major causes of the efficiency fluctuation.
Yoshimoto, Masahiro; Nakanoya, Takamitsu; Yamazaki, Yoshio; Saha, P. K.; Kinsho, Michikazu; Yamamoto, Shunya*; Okazaki, Hiroyuki*; Taguchi, Tomitsugu*; Yamada, Naoto*; Yamagata, Ryohei*
JPS Conference Proceedings (Internet), 33, p.011019_1 - 011019_7, 2021/03
The multi-turn charge-exchange H beam injection scheme with stripper foils is one of the key techniques to achieve a MW-class high power proton beam. The J-PARC RCS adopts Hybrid type Boron-doped Carbon (HBC) stripper foil, which was developed in KEK to improve the lifetime. Indeed, the RCS user operation confirmed that HBC foil has the great advantage of a longer lifetime against high beam irradiation. To examine characteristics of the HBC foils, various beam studies were performed, such as the stripping efficiency measurement and long-term observation with an H
beam in the J-PARC RCS, foil analysis using RBS, EDR and PIXE methods, and SEM and TEM observation after the ion beam irradiation in Takasaki Ion Accelerators for Advanced Radiation Application (TIARA) on National Institutes for Quantum and Radiological Science and Technology (QST). Recently, the deposition apparatus for the HBC foils from the KEK Tsukuba-site was relocated to the JAEA Tokai-site, and we started fabrication of new HBC foil in 2017. (The new one fabricated in JAEA we call J-HBC foil.) And, we continue investigations in TIARA with the J-HBC foils. Furthermore, in-depth researches by changing the process parameters of the foil deposition are carried on. Recent results suggest that the amount of the boron doped in the foil is more important parameter than the ratio of the discharge amount of carbon from cathode and anode electrodes. In this presentation, we will report the details of recent analysis of the J-HBC foil.
Yamamoto, Kazami; Yamamoto, Masanobu; Yamazaki, Yoshio; Nomura, Masahiro; Suganuma, Kazuaki; Fujirai, Kosuke; Kamiya, Junichiro; Hatakeyama, Shuichiro; Hotchi, Hideaki; Yoshimoto, Masahiro; et al.
Proceedings of 17th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.209 - 213, 2020/09
The J-PARC 3GeV Rapid Cycling Synchrotron (RCS) is aiming to provide the proton beam of very high power for neutron experiments and the main ring synchrotron. We have continued the beam commissioning and the output power from RCS have been increasing. In recent years, just before the summer shutdown period, we have been trying continuous supply of 1-MW high-intensity beam, which is the design value, to a neutron target. First trial was 1-hour continuous operation in July 2018, and second trial was 10-hours continuous in July 2019. In both cases, we achieved almost stable operation. Furthermore, in June 2020, we tried to operate continuously for over 40 hours. But in this case, some trouble occurred and the operation was frequently suspended. Through these continuous operation trials, we have identified issues for stable operation of 1 MW. In this presentation, we will report the results of 1-MW continuous operation and issues obtained from these results.
Yoshimoto, Masahiro; Yamazaki, Yoshio; Nakanoya, Takamitsu; Saha, P. K.; Kinsho, Michikazu
EPJ Web of Conferences, 229, p.01001_1 - 01001_7, 2020/02
In the 3-GeV Rapid Cycling Synchrotron (RCS) of the Japan Proton Accelerator Research Complex (J-PARC), we adopted thick Hybrid type Boron-doped Carbon (HBC) stripper foil for the multi-turn H charge-exchange injection. The HBC stripper foil developed at KEK has been successfully demonstrated to improve the foil lifetime significantly. Early manufacturing process of the stripper foil in the J-PARC had been carried out in following two steps: foil fabrication in KEK Tsukuba-site and foil preparation in JAEA Tokai-site. However, to proceed with the foil manufacturing in a same place efficiently, the carbon discharge arc-evaporation system for HBC stripper foil was removed from the Tsukuba-site and relocated in the Tokai-site. After reassembling of the carbon discharge arc-evaporation system, performance evaluation tests of new HBC foil which are produced at the JAEA Tokai site (J-HBC) are implemented at the TIARA facility of QST-Takasaki. As results of argon beam irradiation for lifetime evaluation, components analysis with RBS method, and impurity evaluation with micro-PIXE method, we can verify that the J-HBC foil performs pretty much equally to the original HBC foil. After the irradiation test by using 400MeV H
beam in the J-PARC RCS, user operation by using the J-HBC foil was successfully demonstrated for 10 days.
Nakanoya, Takamitsu; Yoshimoto, Masahiro; Yamazaki, Yoshio; Takeda, Osamu*; Saeki, Riuji*; Muto, Masayoshi*
Proceedings of 16th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.545 - 549, 2019/07
In the 3 GeV Rapid Cycling Synchrotron (RCS) of the Japan Proton Accelerator Research complex (J-PARC), we adopted the carbon stripper foil for the multi-turn H- charge exchange injection. The charge exchange foil which use in RCS is fabricated by the arc discharge method with the boron doped carbon electrode. The foil fabricated this method is called HBC foil (Hybrid Boron mixed Carbon stripper foil). HBC foil had been developed at KEK. It has high durability for the beam irradiation damage. In past days, the foil fabrication process was conducted in KEK Tsukuba-site and the foil preparation process was conducted in JAEA Tokai-site. In 2017, the foil deposition apparatus has been relocated from KEK to JAEA, and we started both processes in Tokai-site. We carried out the offline beam irradiation test for the new HBC foil which fabricated in JAEA, and we confirmed that its performance is equivalent to the original HBC foil. Next we tested a new HBC foil with actual beam in RCS and we confirmed it could withstand 1 week beam irradiation. After that, we started user operation with the new HBC foil in 2018. So far we accomplished stable user operation for one year by using the new HBC foil only.
Yamamoto, Kazami; Yamakawa, Emi*; Takayanagi, Tomohiro; Miki, Nobuharu*; Kamiya, Junichiro; Saha, P. K.; Yoshimoto, Masahiro; Yanagibashi, Toru*; Horino, Koki*; Nakanoya, Takamitsu; et al.
ANS RPSD 2018; 20th Topical Meeting of the Radiation Protection and Shielding Division of ANS (CD-ROM), 9 Pages, 2018/08
The existing beam power of the J-PARC Rapid Cycling Synchrotron is up to 500 kW, and higher radiation doses are concentrated in the injection area. These activations are caused by the interaction between the foil and the beam. To reduce dose exposure to workers near the injection point, we study a new design of the injection scheme. Experience has shown that eddy currents are generated in the metal flange near the magnet owing to the pulsed magnetic field, and the temperature exceeds 100 degrees C. The shield installed in the new injection system needs to have a layer structure, in which an insulator is inserted between iron shields to reduce the eddy current. From the results of the shielding calculation, even if 1 mm of polyethylene was inserted between two 9-mm-thick SUS 316 plates, which serve as shielding material, the shielding performance was reduced only about 5%, and we confirmed that it would function well.
Takahashi, Yoshikazu; Suwa, Tomone; Nabara, Yoshihiro; Ozeki, Hidemasa; Hemmi, Tsutomu; Nunoya, Yoshihiko; Isono, Takaaki; Matsui, Kunihiro; Kawano, Katsumi; Oshikiri, Masayuki; et al.
IEEE Transactions on Applied Superconductivity, 25(3), p.4200904_1 - 4200904_4, 2015/06
Times Cited Count:1 Percentile:9.32(Engineering, Electrical & Electronic)The Japan Atomic Energy Agency (JAEA) is responsible for procuring all amounts of Central Solenoid (CS) Conductors for ITER, including CS jacket sections. The conductor is cable-in-conduit conductor (CICC) with a central spiral. A total of 576 NbSn strands and 288 copper strands are cabled around the central spiral. The maximum operating current is 40 kA at magnetic field of 13 T. CS jacket section is circular in square type tube made of JK2LB, which is high manganese stainless steel with boron added. Unit length of jacket sections is 7 m and 6,300 sections will be manufactured and inspected. Outer/inner dimension and weight are 51.3/35.3 mm and around 90 kg, respectively. Eddy Current Test (ECT) and Phased Array Ultrasonic Test (PAUT) were developed for non-destructive examination. The defects on inner and outer surfaces can be detected by ECT. The defects inside jacket section can be detected by PAUT. These technology and the inspected results are reported in this paper.
Isono, Kenichi; Kubo, Shigenobu; Chikazawa, Yoshitaka; Dozaki, Koji*; Oya, Takeaki*; Yui, Masahiro*
Proceedings of 22nd International Conference on Nuclear Engineering (ICONE-22) (DVD-ROM), 7 Pages, 2014/07
Aiming at enabling maintenance and repair of almost all components in JSFR demonstration reactor to a level equivalent to that attained for the light water reactors, we identified a number of parts which have difficulty in maintenance and repair in main components of the reactor structure and the primary/secondary main coolant system. And we defined the criteria for design improvement and then provided candidates of improvement measures for the identified parts. Furthermore, we made a modification of the plant design in a consistent manner integrating the improvements investigated for each major component. A series of evaluations were conducted to check the feasibility as a power plant. As the result, we found that the concept could be adopted not only to the demonstration reactor (750 MWe) but to the commercial one (1500 MWe).
Ozeki, Hidemasa; Hamada, Kazuya; Takahashi, Yoshikazu; Nunoya, Yoshihiko; Kawano, Katsumi; Oshikiri, Masayuki; Saito, Toru; Teshima, Osamu*; Matsunami, Masahiro*
IEEE Transactions on Applied Superconductivity, 24(3), p.4800604_1 - 4800604_4, 2014/06
Times Cited Count:15 Percentile:63.9(Engineering, Electrical & Electronic)Takahashi, Yoshikazu; Nabara, Yoshihiro; Ozeki, Hidemasa; Hemmi, Tsutomu; Nunoya, Yoshihiko; Isono, Takaaki; Matsui, Kunihiro; Kawano, Katsumi; Oshikiri, Masayuki; Uno, Yasuhiro; et al.
IEEE Transactions on Applied Superconductivity, 24(3), p.4802404_1 - 4802404_4, 2014/06
Times Cited Count:22 Percentile:74.03(Engineering, Electrical & Electronic)Japan Atomic Energy Agency (JAEA) is procuring all amounts of NbSn conductors for Central Solenoid (CS) in the ITER project. Before start of mass-productions, the conductor should be tested to confirm superconducting performance in the SULTAN facility, Switzerland. The original design of cabling twist pitches is 45-85-145-250-450 mm, called normal twist pitch (NTP). The test results of the conductors with NTP was that current shearing temperature (Tcs) is decreasing due to electro-magnetic (EM) load cycles. On the other hand, the results of the conductors with short twist pitches (STP) of 25-45-80-150-450 mm show that the Tcs is stabilized during EM load cyclic tests. Because the conductors with STP have smaller void fraction, higher compaction ratio during cabling is required and possibility of damage on strands increases. The technology for the cables with STP was developed in Japanese cabling suppliers. The several key technologies will be described in this paper.
Hirose, Yusuke*; Miura, Yasunao*; Tsutsumi, Hiroki*; Yoshiuchi, Shingo*; Oya, Masahiro*; Sugiyama, Kiyohiro*; Takeuchi, Tetsuya*; Yamagami, Hiroshi*; Yamamoto, Etsuji; Haga, Yoshinori; et al.
Physica Status Solidi (B), 250(3), p.642 - 645, 2013/03
Times Cited Count:3 Percentile:16.9(Physics, Condensed Matter)Onuki, Yoshichika; Yasui, Shinichi*; Matsushita, Masaki*; Yoshiuchi, Shingo*; Oya, Masahiro*; Hirose, Yusuke*; Dung, N. D.*; Honda, Fuminori*; Takeuchi, Tetsuya*; Settai, Rikio*; et al.
Journal of the Physical Society of Japan, 80(Suppl.A), p.SA003_1 - SA003_6, 2011/12
Onuki, Yoshichika; Yasui, Shinichi*; Yoshiuchi, Shingo*; Oya, Masahiro*; Matsushita, Masaki*; Hirose, Yusuke*; Takeuchi, Tetsuya*; Honda, Fuminori*; Settai, Rikio*; Sugiyama, Kiyohiro*; et al.
Journal of Physics; Conference Series, 273, p.012013_1 - 012013_4, 2011/02
Times Cited Count:0 Percentile:0.03Takeuchi, Tetsuya*; Yasui, Shinichi*; Toda, Masatoshi*; Matsushita, Masaki*; Yoshiuchi, Shingo*; Oya, Masahiro*; Katayama, Keisuke*; Hirose, Yusuke*; Yoshitani, Naohisa*; Honda, Fuminori*; et al.
Journal of the Physical Society of Japan, 79(6), p.064609_1 - 064609_15, 2010/06
Times Cited Count:39 Percentile:83.87(Physics, Multidisciplinary)Sakanaka, Shogo*; Akemoto, Mitsuo*; Aoto, Tomohiro*; Arakawa, Dai*; Asaoka, Seiji*; Enomoto, Atsushi*; Fukuda, Shigeki*; Furukawa, Kazuro*; Furuya, Takaaki*; Haga, Kaiichi*; et al.
Proceedings of 1st International Particle Accelerator Conference (IPAC '10) (Internet), p.2338 - 2340, 2010/05
Future synchrotron light source using a 5-GeV energy recovery linac (ERL) is under proposal by our Japanese collaboration team, and we are conducting R&D efforts for that. We are developing high-brightness DC photocathode guns, two types of cryomodules for both injector and main superconducting (SC) linacs, and 1.3 GHz high CW-power RF sources. We are also constructing the Compact ERL (cERL) for demonstrating the recirculation of low-emittance, high-current beams using above-mentioned critical technologies.