Refine your search:     
Report No.
 - 
Search Results: Records 1-20 displayed on this page of 63

Presentation/Publication Type

Initialising ...

Refine

Journal/Book Title

Initialising ...

Meeting title

Initialising ...

First Author

Initialising ...

Keyword

Initialising ...

Language

Initialising ...

Publication Year

Initialising ...

Held year of conference

Initialising ...

Save select records

Journal Articles

Dose-volume histogram analysis of slit-beam irradiation; Biological implications in mouse ex vivo testes

Shirato, Hiroki*; Mizuta, Masahiro*; Matsuya, Yusuke; Yokoya, Akinari*; Fukunaga, Hisanori*

Physics in Medicine & Biology, 71(14), p.145018_1 - 145018_14, 2026/07

 Times Cited Count:0 Percentile:0.00(Engineering, Biomedical)

Slit-beam irradiation (SI), a form of spatially fractionated irradiation, has been suggested to spare normal tissue through non-target effects (NTE), such as the bystander effect. However, it remains unclear whether the tissue-sparing effects (TSE) reported in previous studies arise from biological mechanisms or from physical dose volume characteristics. In this study, we analyzed a previously reported ex vivo mouse testis experiment using the PHITS code to calculate dose distributions for slit widths of 12.5, 50, and 200 $$mu$$m and to evaluate the corresponding biological effects. The results indicate that the Equivalent Uniform Dose (EUD) is a more appropriate metric for characterizing SI than the doses to irradiated cells, non-irradiated cells, or the entire cell population. These findings suggest that the TSE observed in previous SI studies may be explained by differences in dose-volume histograms (DVHs).

Journal Articles

Beam loss mitigation for operation beyond 1 MW beam power of the J-PARC RCS

Saha, P. K.; Harada, Hiroyuki; Tamura, Fumihiko; Shobuda, Yoshihiro; Kojima, Kunihiro; Yoshimoto, Masahiro; Okita, Hidefumi; Okabe, Kota; Hatakeyama, Shuichiro; Nakanoya, Takamitsu; et al.

Proceedings of 22nd Annual Meeting of Particle Accelerator Society of Japan (Internet), p.549 - 553, 2026/03

Journal Articles

Development for temperature measurement of the stripper foil in J-PARC RCS

Yoshimoto, Masahiro; Yamada, Ippei; Nakanoya, Takamitsu; Saha, P. K.; Hatakeyama, Shuichiro; Saeki, Riuji*; Kuramochi, Masaya*; Otsu, Satoru*

Proceedings of 22nd Annual Meeting of Particle Accelerator Society of Japan (Internet), p.274 - 279, 2026/03

To achieve a high-intensity proton beam, the J-PARC 3-GeV rapid cycling synchrotron accelerator (RCS) adopts the multi-turn charge-exchange beam injection scheme, in which the carbon stripper foils remove the electron from the injected H$$^{-}$$ beam to convert the H$$^{+}$$ beam. Up to now, we have demonstrated that the foils have a sufficient lifetime for continuous beam operation at the design power of 1 MW. On the other hand, we are investigating the possibility of increasing the beam power at the J-PARC further; we hope to achieve a maximum output of 2 MW at the RCS. In general, the key issue for the stripper foil at higher power beam irradiation is the shortened lifetime due to the rising foil temperature. As it reaches the sublimation temperature, it is of concern that the foil's thickness is rapidly decreasing. In this presentation, we will report the simulation result of the rising foil temperature according to the RCS beam power upgrade plan and the recent status of the study for the versatile foil temperature measurement.

Journal Articles

Operation status of the charge exchange foil and replacement work of the foil transfer mechanism in the J-PARC 3GeV synchrotron

Nakanoya, Takamitsu; Yoshimoto, Masahiro; Saha, P. K.; Takeda, Osamu*; Saeki, Riuji*; Muto, Masayoshi*; Miyo, Takuya*

Proceedings of 22nd Annual Meeting of Particle Accelerator Society of Japan (Internet), p.790 - 794, 2026/03

The J-PARC 3 GeV Rapid Cycling Synchrotron (RCS) utilizes pure carbon foils produced in-house by JAEA as charge exchange foils. In November 2023, during beam commissioning just before the start of user operation, a malfunction occurred in a foil drive mechanism. The foil drive mechanism is responsible for replacing and inserting foils into the beamline. This malfunction prevented remote replacement of the foils. Therefore, when foil replacement was necessary, it was performed manually with visual confirmation near the mechanism. The foil drive mechanism was subsequently replaced and restored during the 2024 summer maintenance period. Despite the issue with the foil drive mechanism, the charge exchange foils demonstrated stability under beam irradiation, and there were no operational problems. Recent efforts have significantly enhanced the durability of the foils against beam irradiation through the implementation of two novel methods. One method involves selecting an appropriate diameter for the carbon rod used in charge exchange foil fabrication. The other method utilizes carbon nanotube (CNT) wire as a support material for the foils. While beam irradiation causes foil deformation, these methods show significantly reduced deformation compared to previous foils. This improvement raises the possibility of using foils for a longer operational lifespan. In this paper, we report on the foil drive mechanism malfunction, subsequent replacement work, and the performance of the charge exchange foils during user operation from 2023 to 2025.

Journal Articles

Upgrade of two-dimensional scintillation neutron detectors for single crystal diffractometer SENJU at J-PARC MLF

Nakamura, Tatsuya; To, Kentaro; Kiyanagi, Ryoji; Ohara, Takashi; Hosoya, Takaaki; Tobe, Masahiro; Hishinuma, Yukio*; Ebine, Masumi; Sakasai, Kaoru

Journal of Physics; Conference Series, 3130(1), p.012002_1 - 012002_6, 2025/11

 Times Cited Count:0 Percentile:0.00(Physics, Particles & Fields)

Upgrade of two two-dimensional scintillation neutron detectors for SENJU diffractometer at the Materials and Life science experimental Facility in the Japan Proton Accelerator Research Complex (J-PARC MLF) is underway. The current status of detector development for this project is briefly reviewed. The detector upgrade plan includes detector developments such as thin add-in detectors, high efficiency detectors to replace the original detectors, a large area detector placed under the sample vacuum tank, rectangular shaped one-bank detectors. All of these new detectors are developed based on $$^{6}$$Li:ZnS scintillators and WLS fibers. Recently, we developed a detector with a detection area four times larger than the original one (2 $$times$$ 2 size, 512 $$times$$ 512 mm). Based on these results, work is now underway to further expand the detector area with rectangular shape of 1 $$times$$ 3 (256 $$times$$ 768 mm) and 2 $$times$$ 3 (512 $$times$$ 768 mm). The design and experimental results of the prototype detectors will be presented.

Journal Articles

State-of-the-art beam loss minimization at high-intensity beam operation of the 3 GeV rapid cycling synchrotron at the Japan Proton Accelerator Research Complex

Saha, P. K.; Harada, Hiroyuki; Tamura, Fumihiko; Okabe, Kota; Yoshimoto, Masahiro; Shobuda, Yoshihiro; Okita, Hidefumi; Kojima, Kunihiro; Nakanoya, Takamitsu; Hatakeyama, Shuichiro; et al.

Physical Review Accelerators and Beams (Internet), 28(7), p.074201_1 - 074201_23, 2025/07

 Times Cited Count:1 Percentile:40.19(Physics, Nuclear)

Journal Articles

Beam loss and beam emittance minimization at J-PARC RCS for simultaneous operation to the MLF and MR

Saha, P. K.; Harada, Hiroyuki; Shobuda, Yoshihiro; Chimura, Motoki; Okabe, Kota; Nakanoya, Takamitsu; Moriya, Katsuhiro; Yamamoto, Kazami; Tamura, Fumihiko; Okita, Hidefumi; et al.

Proceedings of 15th International Particle Accelerator Conference (IPAC'24) (Internet), p.939 - 942, 2024/07

Journal Articles

Challenge to charge exchange with pure carbon foil in the J-PARC 3GeV synchrotron

Nakanoya, Takamitsu; Yoshimoto, Masahiro; Saha, P. K.; Takeda, Osamu*; Saeki, Riuji*; Muto, Masayoshi*

Proceedings of 20th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.937 - 941, 2023/11

In the J-PARC 3GeV Rapid Cycling Synchrotron (RCS), the 400 MeV H$$^{-}$$ beam is changed to H$$^{+}$$ beam by a charge exchange foil and accelerated to 3GeV. So far, RCS had used two types of charge exchange foil. One is the HBC (Hybrid Boron mixed Carbon) foil and the other is the Kaneka GTF (Graphene Thin Film). HBC foil is a patented deposition method developed at KEK for the stable production of thick carbon foil. Initially, the RCS used HBC foil produced at KEK. However, in 2017, JAEA had started HBC foil production and has been using it since then. Recently, we have succeeded in depositing thick pure carbon foil, which had been considered difficult to produce by the arc deposition method. As a new challenge, this pure carbon foil was used in the user operation from March 2023. As a result, Pure carbon foils showed less deformation and more stable charge exchange performance than HBC and GTF.

JAEA Reports

Decommissioning of uranium handling facility for development of nuclear fuel manufacturing equipment

Kageyama, Tomio; Denuma, Akio; Koizumi, Jin*; Odakura, Manabu*; Haginoya, Masahiro*; Isaka, Shinichi*; Kadowaki, Hiroyuki*; Kobayashi, Shingo*; Morimoto, Taisei*; Kato, Yoshiaki*; et al.

JAEA-Technology 2022-033, 130 Pages, 2023/03

JAEA-Technology-2022-033.pdf:9.87MB

Uranium handling facility for development of nuclear fuel manufacturing equipment (Mockup room) was constructed in 1972. The Mockup room has a weak seismic resistance and is deteriorating with age. Also, the original purpose with this facility have been achieved and there are no new development plans using this facility. Therefore, interior equipment installed in this facility had been dismantled and removed since March 2019. After that, the Mockup room was inspected for contamination, and then controlled area in the Mockup room was cancelled on March 29th 2022. A total of 6,549 workers (not including security witnesses) were required for this work. The amount of non-radioactive waste generated by this work was 31,300 kg. The amount of radioactive waste generated by this work was 3,734 kg of combustible waste (103 drums), 4,393 kg of flame resistance waste (61 drums), 37,790 kg of non-combustible waste (124 drums, 19 containers). This report describes about the dismantling and removing the interior equipment in the Mockup room, the amount of waste generated by this work, and procedure for cancellation the controlled area in the facility.

Journal Articles

Recent results of beam loss mitigation and extremely low beam loss operation of J-PARC RCS

Saha, P. K.; Okabe, Kota; Nakanoya, Takamitsu; Shobuda, Yoshihiro; Harada, Hiroyuki; Tamura, Fumihiko; Okita, Hidefumi; Yoshimoto, Masahiro; Hotchi, Hideaki*

Journal of Physics; Conference Series, 2420, p.012040_1 - 012040_7, 2023/01

Journal Articles

Results of 1-MW operation in J-PARC 3 GeV rapid cycling synchrotron, 2

Yamamoto, Kazami; Yamamoto, Masanobu; Yamazaki, Yoshio; Nomura, Masahiro; Suganuma, Kazuaki; Fujirai, Kosuke; Kamiya, Junichiro; Nakanoya, Takamitsu; Hatakeyama, Shuichiro; Yoshimoto, Masahiro; et al.

Proceedings of 19th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.277 - 281, 2023/01

The J-PARC 3GeV Rapid Cycling Synchrotron (RCS) is aiming to provide the proton beam of very high power for neutron experiments and the main ring synchrotron. We have continued the beam commissioning and the output power from RCS have been increasing. In recent years, we have been trying continuous supply of 1-MW high-intensity beam, which is the design value, to a neutron target. We tried to operate continuously for over 40 hours in June 2020. However, some trouble occurred and the operation was frequently suspended. In June 2021, we tried again 1-MW operation but it was suspended due to deterioration of the cooling water performance. Last summer shutdown period, we recovered performance of the cooling water system and retried in this June. In the final case, the outside temperature became extremely high. We could not keep 1-MW power, whereas 600 kW beam was delivered in stable.

Journal Articles

Achievement of low beam loss at high-intensity operation of J-PARC 3 GeV RCS

Saha, P. K.; Okabe, Kota; Nakanoya, Takamitsu; Yoshimoto, Masahiro; Shobuda, Yoshihiro; Harada, Hiroyuki; Tamura, Fumihiko; Okita, Hidefumi; Hatakeyama, Shuichiro; Moriya, Katsuhiro; et al.

Proceedings of 19th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.1 - 5, 2023/01

Journal Articles

Recent usage status of charge-exchange stripper foil for 3GeV synchrotron of J-PARC

Nakanoya, Takamitsu; Yoshimoto, Masahiro; Saha, P. K.; Takeda, Osamu*; Saeki, Riuji*; Muto, Masayoshi*

Proceedings of 19th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.629 - 633, 2023/01

In the J-PARC 3-GeV Rapid Cycling Synchrotron (RCS), a 400 MeV H$$^{-}$$ beam injected from the linac is exchange to an H$$^{+}$$ beam by a charge exchange foil and accelerated to 3 GeV. The charge exchange foils mainly used in the RCS are HBC foil (Hybrid Boron mixed Carbon stripper foil), which are made by adding a small amount of boron to carbon rods and using them as electrodes by the arc deposition method. Since 2018, foils produced by JAEA have been used for user operation. So far, no major problems have occurred due to the foils. Meanwhile, the beam power of the RCS has been gradually increased from 500 kW to 830 kW since 2018. As beam power increases, the foil issues were identified to achieve the RCS design power of 1 MW. In this paper, we will report on the recent foil usage status and issue in the user operation.

Journal Articles

Design and actual performance of J-PARC 3 GeV rapid cycling synchrotron for high-intensity operation

Yamamoto, Kazami; Kinsho, Michikazu; Hayashi, Naoki; Saha, P. K.; Tamura, Fumihiko; Yamamoto, Masanobu; Tani, Norio; Takayanagi, Tomohiro; Kamiya, Junichiro; Shobuda, Yoshihiro; et al.

Journal of Nuclear Science and Technology, 59(9), p.1174 - 1205, 2022/09

 Times Cited Count:10 Percentile:71.75(Nuclear Science & Technology)

In the Japan Proton Accelerator Research Complex, the purpose of the 3 GeV rapid cycling synchrotron (RCS) is to accelerate a 1 MW, high-intensity proton beam. To achieve beam operation at a repetition rate of 25 Hz at high intensities, the RCS was elaborately designed. After starting the RCS operation, we carefully verified the validity of its design and made certain improvements to establish a reliable operation at higher power as possible. Consequently, we demonstrated beam operation at a high power, namely, 1 MW. We then summarized the design, actual performance, and improvements of the RCS to achieve a 1 MW beam.

JAEA Reports

Decommissioning of Pre-dismantling Temporary Waste Storage Facility 3 (FPG-03a,b,c) in Plutonium Fuel Production Facility

Shinozaki, Masaru; Aita, Takahiro; Iso, Takahito*; Odakura, Manabu*; Haginoya, Masahiro*; Kadowaki, Hiroyuki*; Kobayashi, Shingo*; Inagawa, Takumu*; Morimoto, Taisei*; Iso, Hidetoshi; et al.

JAEA-Technology 2021-043, 100 Pages, 2022/03

JAEA-Technology-2021-043.pdf:7.49MB

It is planned that the MOX (Mixed Oxide) from the decommissioned facilities in Nuclear Fuel Cycle Engineering Laboratories is going to be consolidated and stored stably and safely for a long term in Plutonium Fuel Production Facility of the Plutonium Fuel Development Center of Nuclear Fuel Cycle Engineering Laboratories. For this purpose, it is necessary to pelletize nuclear fuel materials in the facility and store them in the assembly storage (hereinafter referred to as "waste packaging work") to secure storage space in the plutonium material storage. As a countermeasure to reduce the facility risk in this waste packing work, it was decided to construct a new powder weighing and homogenization mixing facility to physically limit the amount (batch size) of nuclear fuel materials handled at the entrance of the process. In order to secure the installation space for the new facility in the powder preparation room (1) (FP-101), the pre-dismantling temporary waste storage facility 3 (FPG-03a, b, c) was dismantled and removed. This facility consists of a granulating and sizing facility, an additive mixing facility, and a receiving and delivering guided facility, which started to be used from January 1993, and was discontinued on February 3, 2012 and became a waste facility. Subsequently, the dismantling and removal of the interior equipment was carried out by pellet fabrication section for glove operation to reduce the amount of hold-up, and before the main dismantling and removal, there was almost no interior equipment except for large machinery. This report describes the dismantling and removal of the glove box and some interior equipment and peripherals of the facility, as well as the Green House setup method, dismantling and removal procedures, and issues specific to powder process equipment (dust, etc.).

JAEA Reports

Report of the design examination and the installation work for the radiation shield at the beam injection area in the 3 GeV synchrotron

Nakanoya, Takamitsu; Kamiya, Junichiro; Yoshimoto, Masahiro; Takayanagi, Tomohiro; Tani, Norio; Kotoku, Hirofumi*; Horino, Koki*; Yanagibashi, Toru*; Takeda, Osamu*; Yamamoto, Kazami

JAEA-Technology 2021-019, 105 Pages, 2021/11

JAEA-Technology-2021-019.pdf:10.25MB

Since a user operation startup, the 3 GeV synchrotron accelerator (Rapid-Cycling Synchrotron: RCS) gradually reinforced the beam power. As a result, the surface dose rate of the apparatus located at the beam injection area of the RCS, such as the magnet, vacuum chambers, beam monitors, etc., increases year by year. The beam injection area has many apparatuses which required manual maintenance, so reducing worker's dose is a serious issue. To solve this problem, we have organized a task force for the installation of the shield. The task force has aimed to optimize the structure of the radiation shield, construct the installation procedure with due consideration of the worker's dose suppression. As the examination result of the shield design, we have decided to adopt removal shielding that could be installed quickly and easily when needed. We carried out shield installation work during the 2020 summer maintenance period. The renewal work required to install the shielding has been carried out in a under high-dose environment. For this reason, reducing the dose of workers was an important issue. So, we carefully prepared the work plan and work procedure in advance. During the work period, we implemented various dose reduction measures and managed individual dose carefully. As a result, the dose of all workers could be kept below the predetermined management value. We had installed removal shielding at the beam injection area in the 2020 summer maintenance period. We confirmed that this shield can contribute to the reduction of the dose during work near the beam injection area. It was a large-scale work to occupy the beam injection area during almost of the summer maintenance period. However, it is considered very meaningful for dose suppression in future maintenance works.

Journal Articles

Radiation shielding installation for beam injection section of 3GeV synchrotron

Nakanoya, Takamitsu; Kamiya, Junichiro; Yoshimoto, Masahiro; Takayanagi, Tomohiro; Tani, Norio; Kotoku, Hirofumi*; Horino, Koki*; Yanagibashi, Toru*; Takeda, Osamu*; Yamamoto, Kazami

Proceedings of 18th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.238 - 242, 2021/10

Since a user operation startup, the 3GeV synchrotron accelerator (Rapid-Cycling Synchrotron: RCS) gradually reinforced the beam power. As a result, the surface dose rate of the apparatus located at the beam injection area of the RCS increases year by year. The beam injection area has many apparatuses which required manual maintenance, so reducing worker's dose is a serious issue. To solve this problem, we have decided to adopt removal shielding that could be installed quickly and easily when needed. We carried out shield installation work during the 2020 summer maintenance period. The installation work of the shield has been carried out in a under high-dose environment. For this reason, reducing the dose of workers was an important issue. So, we carefully prepared the work plan and work procedure in advance. During the work period, we implemented various dose reduction measures and managed individual dose carefully. As a result, the dose of all workers could be kept below the predetermined management value. We had installed removal shielding at the beam injection area in the 2020 summer maintenance period. We confirmed that this shield can contribute to the reduction of the dose during work near the beam injection area.

Journal Articles

Initiatives to address the lifetime improvement of HBC stripper foil for 3GeV synchrotron of J-PARC

Yoshimoto, Masahiro; Nakanoya, Takamitsu; Yamazaki, Yoshio; Saha, P. K.; Kinsho, Michikazu; Yamamoto, Shunya*; Okazaki, Hiroyuki*; Taguchi, Tomitsugu*; Yamada, Naoto*; Yamagata, Ryohei*

Proceedings of 18th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.850 - 854, 2021/10

no abstracts in English

Journal Articles

Dependence of charge-exchange efficiency on cooling water temperature of a beam transport line

Yamamoto, Kazami; Hatakeyama, Shuichiro; Saha, P. K.; Moriya, Katsuhiro; Okabe, Kota; Yoshimoto, Masahiro; Nakanoya, Takamitsu; Fujirai, Kosuke; Yamazaki, Yoshio; Suganuma, Kazuaki

EPJ Techniques and Instrumentation (Internet), 8(1), p.9_1 - 9_9, 2021/07

The 3 GeV Rapid Cycling Synchrotron at the Japan Proton Accelerator Research Complex supplies a high-intensity proton beam for neutron experiments. Various parameters are monitored to achieve a stable operation, and it was found that the oscillations of the charge-exchange efficiency and cooling water temperature were synchronized. We evaluated the orbit fluctuations at the injection point using a beam current of the injection dump, which is proportional to the number of particles that miss the foil and fail in the charge exchange, and profile of the injection beam. The total width of the fluctuations was approximately 0.072 mm. This value is negligible from the user operation viewpoint as our existing beam position monitors cannot detect such a small signal deviation. This displacement corresponds to a 1.63$$times$$10$$^{-5}$$ variation in the dipole magnetic field. Conversely, the magnetic field variation in the L3BT dipole magnet, which was estimated by the temperature change directly, is 4.08$$times$$10$$^{-5}$$. This result suggested that the change in the cooling water temperature is one of the major causes of the efficiency fluctuation.

Journal Articles

Alternation of magnetic anisotropy accompanied by metal-insulator transition in strained ultrathin manganite heterostructures

Kobayashi, Masaki*; Anh, L. D.*; Suzuki, Masahiro*; Kaneta-Takada, Shingo*; Takeda, Yukiharu; Fujimori, Shinichi; Shibata, Goro*; Tanaka, Arata*; Tanaka, Masaaki*; Oya, Shinobu*; et al.

Physical Review Applied (Internet), 15(6), p.064019_1 - 064019_10, 2021/06

 Times Cited Count:10 Percentile:44.38(Physics, Applied)

63 (Records 1-20 displayed on this page)