Refine your search:     
Report No.
 - 
Search Results: Records 1-20 displayed on this page of 60

Presentation/Publication Type

Initialising ...

Refine

Journal/Book Title

Initialising ...

Meeting title

Initialising ...

First Author

Initialising ...

Keyword

Initialising ...

Language

Initialising ...

Publication Year

Initialising ...

Held year of conference

Initialising ...

Save select records

JAEA Reports

Manufacture of substitutive assemblies for MONJU reactor decommissioning

Sakakibara, Hiroshi; Aoki, Nobuhiro; Muto, Masahiro; Otabe, Jun; Takahashi, Kenji*; Fujita, Naoyuki*; Hiyama, Kazuhiko*; Suzuki, Hirokazu*; Kamogawa, Toshiyuki*; Yokosuka, Toru*; et al.

JAEA-Technology 2020-020, 73 Pages, 2021/03

JAEA-Technology-2020-020.pdf:8.26MB

The decommissioning is currently in progress at the prototype fast breeder reactor Monju. Fuel assemblies will be taken out of its core for the first step of the great task. Fuel assemblies stand on their own spike plugged into a socket on the core support plate and support with adjacent assemblies through their housing pads each other, resulting in steady core structure. For this reason, some substitutive assemblies are necessary for the purpose of discharging the fuel assemblies of the core. Monju side commissioned, therefore, Plutonium Fuel Development Center to manufacture the substitutive assemblies and the Center accepted it. This report gives descriptions of design, manufacture, and shipment in regard to the substitutive assemblies.

Journal Articles

Accuracy of prediction method of cryogenic tensile strength for austenitic stainless steels in ITER toroidal field coil structure

Sakurai, Takeru; Iguchi, Masahide; Nakahira, Masataka; Saito, Toru*; Morimoto, Masaaki*; Inagaki, Takashi*; Hong, Y.-S.*; Matsui, Kunihiro; Hemmi, Tsutomu; Kajitani, Hideki; et al.

Physics Procedia, 67, p.536 - 542, 2015/07

 Times Cited Count:3 Percentile:73.39

Japan Atomic Energy Agency (JAEA) has developed the tensile strength prediction method at liquid helium temperature (4K) using the quadratic curve as a function of the content of carbon and nitrogen in order to establish the rationalized quality control of the austenitic stainless steel used in the ITER superconducting coil operating at 4K. ITER is under construction aiming to verify technical demonstration of a nuclear fusion generation. Toroidal Field Coil (TFC), one of superconducting system in ITER, have been started procurement of materials in 2012. JAEA is producing materials for actual product which are the forged materials with shape of rectangle, round bar, asymmetry and etc. JAEA has responsibility to procure all ITER TFC Structures. In this process, JAEA obtained many tensile strength of both room temperature and 4K about these structural materials, for example, JJ1: High manganese stainless steel for structure (0.03C-12Cr-12Ni-10Mn-5Mo- 0.24N) and 316LN: High nitrogen containing stainless steel (0.2Nitrogen). Based on these data, accuracy of 4K strength prediction method for actual TFC Structure materials was evaluated and reported in this study.

Journal Articles

Beam size reduction of a several hundred-keV compact ion microbeam system by improving the extraction condition in an ion source

Ishii, Yasuyuki; Okubo, Takeru; Kamiya, Tomihiro; Saito, Yuichi

Nuclear Instruments and Methods in Physics Research B, 348, p.79 - 82, 2015/04

 Times Cited Count:2 Percentile:17.75(Instruments & Instrumentation)

Journal Articles

Status report on technical developments of electrostatic accelerators

Yamada, Keisuke; Saito, Yuichi; Ishii, Yasuyuki; Matoba, Shiro; Chiba, Atsuya; Yokoyama, Akihito; Usui, Aya; Sato, Takahiro; Okubo, Takeru; Uno, Sadanori

JAEA-Review 2013-059, JAEA Takasaki Annual Report 2012, P. 159, 2014/03

no abstracts in English

Journal Articles

Operation of electrostatic accelerators

Uno, Sadanori; Chiba, Atsuya; Yamada, Keisuke; Yokoyama, Akihito; Usui, Aya; Saito, Yuichi; Ishii, Yasuyuki; Sato, Takahiro; Okubo, Takeru; Nara, Takayuki; et al.

JAEA-Review 2013-059, JAEA Takasaki Annual Report 2012, P. 179, 2014/03

Three electrostatic accelerators at TIARA were operated on schedule in fiscal year 2012 except changing its schedule by cancellations of users. The yearly operation time of the 3 MV tandem accelerator, the 400 kV ion implanter and the 3MV single-ended accelerator were in the same levels as the ordinary one, whose operation time totaled to 2,073, 1,847 and 2,389 hours, respectively. The tandem accelerator had no trouble, whereas the ion implanter and the single-ended accelerator stopped by any troubles for one day and four days, respectively. The molecular ion beam of helium hydride was generated by the ion implanter, because the users required irradiation of several cluster ions in order to study the effect of irradiation. As a result, its intensity of beam was 50 nA at 200 kV. The ion beam of tungsten (W) at 15 MeV was accelerated by the tandem accelerator, whose intensity was 20 nA at charge state of 4+, because of the request from a researcher in the field of nuclear fusion.

Journal Articles

Development of beam generation and irradiation technology for electrostatic accelerators

Yamada, Keisuke; Chiba, Atsuya; Yokoyama, Akihito; Saito, Yuichi; Ishii, Yasuyuki; Sato, Takahiro; Okubo, Takeru; Uno, Sadanori

JAEA-Review 2012-046, JAEA Takasaki Annual Report 2011, P. 155, 2013/01

no abstracts in English

Journal Articles

Operation of electrostatic accelerators

Uno, Sadanori; Chiba, Atsuya; Yamada, Keisuke; Yokoyama, Akihito; Saito, Yuichi; Ishii, Yasuyuki; Sato, Takahiro; Okubo, Takeru; Nara, Takayuki; Kitano, Toshihiko*; et al.

JAEA-Review 2012-046, JAEA Takasaki Annual Report 2011, P. 173, 2013/01

The three electrostatic accelerators at the TIARA had no mechanical damage when the Tohoku earthquake happened on March 11, 2011. But, they could not be operated during April, due to the influence of planned power outage by TEPCO. These accelerators additionally operated on Saturday for ten days in order to compensate for the lost experiment time. As a result, the yearly operation time had kept the same level as the ordinary one. The ion beam of erbium (Er) with 11.7MeV was accelerated newly by the tandem accelerator, whose intensity was 20nA at charge state of 3+. The sequential generation/irradiation of two different kinds of fullerene ions was achieved at the ion implanter by a mixed powder method without exchange of the Freeman type ion source by the user's request.

Journal Articles

Operation of electrostatic accelerators at TIARA

Uno, Sadanori; Chiba, Atsuya; Yamada, Keisuke; Yokoyama, Akihito; Saito, Yuichi; Ishii, Yasuyuki; Sato, Takahiro; Okubo, Takeru; Nara, Takayuki; Kitano, Toshihiko*; et al.

Dai-7-Kai Takasaki Oyo Kenkyu Shimpojiumu Yoshishu, P. 119, 2012/10

The three electrostatic accelerators at TIARA had no damage when the Tohoku earthquake happened on March 11, 2011. But, they could not be operated until end of April, due to the influence of planned power outage and keep out into the controlled area for radiation. These accelerators additionally operated on Saturday for twelve days in order to compensate for the lost experiment time. Therefore, the yearly operation time had kept the same level as the ordinary one. The tandem accelerator has stopped leakage of the SF$$_{6}$$ gas from the base flange on the tank by the Viton gasket of rectangular cross section at the new type.

Journal Articles

Current status of electrostatic accelerators at TIARA

Uno, Sadanori; Chiba, Atsuya; Yamada, Keisuke; Yokoyama, Akihito; Kitano, Toshihiko*; Takayama, Terumitsu*; Orimo, Takao*; Kanai, Shinji*; Aoki, Yuki*; Yamada, Naoto*; et al.

Dai-25-Kai Tandemu Kasokuki Oyobi Sono Shuhen Gijutsu No Kenkyukai Hokokushu, p.64 - 66, 2012/07

The three electrostatic accelerators at the TIARA had no damage when the Tohoku earthquake happened on March 11, 2011. But, they could not be operated until end of April, due to the influence of planned power outage and keep out into the controlled area for radiation. These accelerators additionally operated on Saturday for twelve days in order to compensate for the lost experiment time. Therefore, the yearly operation time had kept the same level as the ordinary one. The tandem accelerator has stopped leakage of the SF$$_{6}$$ gas from the base flange on the tank by the Viton gasket of rectangular cross section at the new type. The ion implanter could generate two kinds of fullerene ions by a mixed material of ions and a controlled temperature of the oven without exchange of ion source.

Journal Articles

Thermal spin pumping and magnon-phonon-mediated spin-Seebeck effect

Uchida, Kenichi*; Ota, Takeru*; Adachi, Hiroto; Xiao, J.*; Nonaka, Tatsumi*; Kajiwara, Yosuke*; Bauer, G. E. W.*; Maekawa, Sadamichi; Saito, Eiji

Journal of Applied Physics, 111(10), p.103903_1 - 103903_11, 2012/05

 Times Cited Count:121 Percentile:96.12(Physics, Applied)

Journal Articles

Development of beam generation and irradiation technology for electrostatic accelerators

Yokoyama, Akihito; Uno, Sadanori; Chiba, Atsuya; Yamada, Keisuke; Saito, Yuichi; Ishii, Yasuyuki; Sato, Takahiro; Okubo, Takeru; Agematsu, Takashi

JAEA-Review 2011-043, JAEA Takasaki Annual Report 2010, P. 158, 2012/01

no abstracts in English

Journal Articles

Operation of the electrostatic accelerators

Agematsu, Takashi; Uno, Sadanori; Chiba, Atsuya; Yamada, Keisuke; Yokoyama, Akihito; Saito, Yuichi; Ishii, Yasuyuki; Sato, Takahiro; Okubo, Takeru; Yokota, Wataru; et al.

JAEA-Review 2011-043, JAEA Takasaki Annual Report 2010, P. 173, 2012/01

Three electrostatic accelerators of TIARA were operated smoothly in FY 2010, and all the planned experiments were carried out except those canceled by users or the impact of Great East Japan Earthquake on March 11, 2011. On the other hand, Saturday operation for experiments was carried out after October on the Global Nuclear-Human Resource Development Initiative. The yearly operation time of the tandem accelerator, the single-ended accelerator and the ion implanter amounted to 2116, 2367 and 1800 hours, respectively, which were similar to those of usual years. Regarding the single-ended accelerator, the generator in the high-voltage terminal failed and was replaced with new one. A switching magnet was installed for a new branch beam line of the ion implanter. As to the tandem accelerator, In ion was generated and accelerated at intensity of 500 nA.

Journal Articles

Long-range spin Seebeck effect and acoustic spin pumping

Uchida, Kenichi*; Adachi, Hiroto; An, Toshu*; Ota, Takeru*; Toda, Masaya*; Hillebrands, B.*; Maekawa, Sadamichi; Saito, Eiji

Nature Materials, 10(10), p.737 - 741, 2011/10

 Times Cited Count:222 Percentile:98.47(Chemistry, Physical)

We show that, using a NiFe/Pt bilayer wire on an insulating sapphire plate, electrons in the wire recognize their position on the sapphire. Under a temperature gradient in the sapphire, surprisingly, the voltage generated in the Pt layer is shown to reflect the wire position, although the wire is isolated both electrically and magnetically. This non-local voltage due to the coupling of spins and phonons: the only possible carrier of information in this system. We demonstrate this coupling by directly injecting sound waves, which realizes the acoustic spin pumping. Our finding provides a persuasive answer to the long-range nature of the spin Seebeck effect, and it opens the door to "acoustic spintronics" in which sound waves are exploited for constructing spin-based devices.

Journal Articles

Status of TIARA facility

Yamada, Keisuke; Nara, Takayuki; Ishibori, Ikuo; Kurashima, Satoshi; Yoshida, Kenichi; Yuyama, Takahiro; Ishizaka, Tomohisa; Agematsu, Takashi; Uno, Sadanori; Chiba, Atsuya; et al.

Proceedings of 8th Annual Meeting of Particle Accelerator Society of Japan (Internet), 3 Pages, 2011/08

no abstracts in English

Journal Articles

Current status of electrostatic accelerators at TIARA

Uno, Sadanori; Chiba, Atsuya; Yamada, Keisuke; Yokoyama, Akihito; Agematsu, Takashi; Kitano, Toshihiko*; Takayama, Terumitsu*; Orimo, Takao*; Kanai, Shinji*; Aoki, Yuki*; et al.

Dai-24-Kai Tandemu Kasokuki Oyobi Sono Shuhen Gijutsu No Kenkyukai Hokokushu, p.125 - 128, 2011/07

The yearly operation time of three electrostatic accelerators at TIARA of Japan Atomic Energy Agency is keeping the same level since 2000, the tandem accelerator, the ion implanter and the single-ended accelerator amounted to about 2000, 1900 and 2500 hours, respectively. Three electrostatic accelerators did not have damage when the Tohoku Earthquake occurred on March 11, 2011. However, these accelerators were not able to operate during the planned power outage by Tokyo Electric Power Company (TEPCO). The tandem accelerator accelerated ion beam of In, which gave intensity of 500nA with stability. Additionally, the ion implanter generated maximum 400nA at ion beam of Gd, which was used in experiments for the users.

Journal Articles

Development of beam generation and irradiation technology for electrostatic accelerators

Yokoyama, Akihito; Uno, Sadanori; Chiba, Atsuya; Yamada, Keisuke; Saito, Yuichi; Ishii, Yasuyuki; Sato, Takahiro; Okubo, Takeru; Agematsu, Takashi

JAEA-Review 2010-065, JAEA Takasaki Annual Report 2009, P. 175, 2011/01

no abstracts in English

Journal Articles

Operation of the electrostatic accelerators

Agematsu, Takashi; Uno, Sadanori; Chiba, Atsuya; Yamada, Keisuke; Yokoyama, Akihito; Saito, Yuichi; Ishii, Yasuyuki; Sato, Takahiro; Okubo, Takeru; Yokota, Wataru; et al.

JAEA-Review 2010-065, JAEA Takasaki Annual Report 2009, P. 181, 2011/01

Three electrostatic accelerators of TIARA were operated smoothly in FY 2009, and all the planned experiments were carried out except those canceled by users. The yearly operation time of the tandem accelerator, the single-ended accelerator and the ion implanter amounted to 2100, 2416 and 1866 hours, respectively. Regarding the single-ended accelerator, the radio frequency oscillator of the ion source mounted in high-voltage terminal and the sequencer for control of the SB beam line failed, and they were replaced. The oven controller of Freeman ion source of the ion implanter was renewed. As to the tandem accelerator, Mn ion was successfully generated and accelerated with intensity of 150 nA.

Journal Articles

Current status of electrostatic accelerators at TIARA

Chiba, Atsuya; Uno, Sadanori; Yamada, Keisuke; Yokoyama, Akihito; Agematsu, Takashi; Yokota, Wataru; Kitano, Toshihiko*; Takayama, Terumitsu*; Kanai, Shinji*; Orimo, Takao*; et al.

Dai-23-Kai Tandemu Kasokuki Oyobi Sono Shuhen Gijutsu No Kenkyukai Hokokushu, p.119 - 122, 2010/11

Operation times of each accelerator are keeping the same level as in recent 10 years, Tandem accelerator, Single-ended and Ion implanter amounted to about 2,000, 2,500 and 1,900 hours, respectively. In the last fiscal year, we succeeded in maintaining the terminal voltage of the tandem accelerator to high stability for long periods by exchanging the material of a corona-probe needle to the tungsten (NPS Co.). In the ion-implanter, the oven control system equipped with the Freeman ion source was renewed. There was no trouble to affect on the machine-time in the last fiscal year, so the all planned experiments were carried out.

Journal Articles

Spin Seebeck insulator

Uchida, Kenichi*; Xiao, J.*; Adachi, Hiroto; Oe, Junichiro; Takahashi, Saburo; Ieda, Junichi; Ota, Takeru*; Kajiwara, Yosuke*; Umezawa, Hiromitsu*; Kawai, Hirotaka*; et al.

Nature Materials, 9(11), p.894 - 897, 2010/11

 Times Cited Count:1023 Percentile:99.88(Chemistry, Physical)

Thermoelectric generation is an essential function in future energy-saving technologies. However, it has so far been an exclusive feature of electric conductors, a situation which limits its application; conduction electrons are often problematic in the thermal design of devices. Here we report electric voltage generation from heat flowing in an insulator. We reveal that, despite the absence of conduction electrons, the magnetic insulator LaY$$_{2}$$Fe$$_{5}$$O$$_{12}$$ can convert a heat flow into a spin voltage. Attached Pt films can then transform this spin voltage into an electric voltage as a result of the inverse spin Hall effect. The experimental result require us to introduce a thermally activated interface spin exchange between LaY$$_{2}$$Fe$$_{5}$$O$$_{12}$$ and Pt. Our findings extend the range of potential materials for thermoelectric applications and provide a crucial piece of information for understanding the physics of the spin Seebeck effect.

Journal Articles

Observation of longitudinal spin-Seebeck effect in magnetic insulators

Uchida, Kenichi*; Adachi, Hiroto; Ota, Takeru*; Nakayama, Hiroyasu*; Maekawa, Sadamichi; Saito, Eiji

Applied Physics Letters, 97(17), p.172505_1 - 172505_3, 2010/10

 Times Cited Count:602 Percentile:99.68(Physics, Applied)

60 (Records 1-20 displayed on this page)