Refine your search:     
Report No.
 - 
Search Results: Records 1-8 displayed on this page of 8
  • 1

Presentation/Publication Type

Initialising ...

Refine

Journal/Book Title

Initialising ...

Meeting title

Initialising ...

First Author

Initialising ...

Keyword

Initialising ...

Language

Initialising ...

Publication Year

Initialising ...

Held year of conference

Initialising ...

Save select records

Journal Articles

Operation training of new JMTR

Kameyama, Yasuhiko; Onoue, Ryuji; Hanawa, Yoshio; Nemoto, Nobuaki

UTNL-R-0483, p.10_6_1 - 10_6_6, 2013/03

no abstracts in English

JAEA Reports

Investigation on integrity of canal expanded joint

Oto, Tsutomu; Kimura, Tadashi; Miyauchi, Masaru; Nemoto, Nobuaki; Tobita, Kenji; Fukasaku, Akitomi; Takahashi, Kunihiro

JAEA-Review 2010-017, 21 Pages, 2010/07

JAEA-Review-2010-017.pdf:7.68MB

An integrity investigation of a Canal Expanded Joint was carried out as one of the integrity investigation of the JMTR reactor building related facilities and components, before the repair or replacement work of the JMTR related facilities that had begun in FY2007. The Canal Expanded Joint will be used for long-term after the JMTR restart. In the integrity investigation, the visual inspection, the performance test (Surface observations, Durometer hardness test) were investigated respectively and the integrity of the Canal Expanded Joint was confirmed. In order to use the Canal Expanded Joint continuously for long-term, it is important for maintaining the integrity of the Canal Expanded Joint by the periodical maintenance and the repairing work including that has been conducted up to now.

JAEA Reports

Investigation on integrity of JMTR concrete structure

Miyauchi, Masaru; Kimura, Tadashi; Oto, Tsutomu; Nemoto, Nobuaki; Tobita, Kenji; Fukasaku, Akitomi; Takahashi, Kunihiro

JAEA-Review 2010-008, 106 Pages, 2010/06

JAEA-Review-2010-008.pdf:8.89MB

An integrity investigation was carried out for the JMTR Concrete Structure (Vent Stack, Trench, Canal Building, Filter Bank), which was the concrete structure and would be used for the long-term after JMTR restart, before the repair or replacement work of the JMTR related facilities that had begun in FY2007. In the integrity investigation, the concrete surface deterioration, the rebound number (nondestructive strength test), compressive strength using drilled concrete core test piece, the static modules of elasticity, the carbonation depth, the reinforced bar corrosion and the chloride ion content were investigated respectively and the integrity of concrete was confirmed. After the investigation, repair works such as re-painting of the Vent Stack and Trench were carried out from the viewpoint of prevention of flaking off, floating of the painting and the thinning due to the investigation results. In order to use the JMTR concrete structure continuously for long-term, it is important for maintaining the integrity of a concrete structure by the periodical maintenance and the repairing work including the building outer-wall surface painting that has been conducted up to now.

JAEA Reports

Investigation on integrity of JMTR UCL elevated water tank

Kimura, Tadashi; Oto, Tsutomu; Miyauchi, Masaru; Nemoto, Nobuaki; Tobita, Kenji; Fukasaku, Akitomi; Takahashi, Kunihiro

JAEA-Review 2010-001, 27 Pages, 2010/03

JAEA-Review-2010-001.pdf:18.81MB

In order to investigate an integrity of the UCL (Utility Cooling Line) elevated water tank to be used for a long term after the JMTR restart, investigation on the base of the UCL elevated tank, especially for the part which had a significant aged effect, was carried out before the refurbishment work of the JMTR related facilities which had begun in FY2007. In the integrity investigation, it was confirmed that some part of the base bolts had significant aged effects, there were no evidence of crack and false indication in the welding region though thinning were observed in some parts of the base plate and the surrounding plate. After the investigation, repair works such as re-painting of the UCL elevated water tank were carried out from the viewpoint of prevention of flaking off, floating of the painting and the thinning due to corrosion based on the investigation results. In order to maintain the integrity of the UCL elevated tank, the periodical maintenance and the repair works of the base of the UCL elevated tank are important for continuous use of it in future.

JAEA Reports

Investigation on integrity of JMTR reactor building

Kimura, Tadashi; Oto, Tsutomu; Miyauchi, Masaru; Nemoto, Nobuaki; Tobita, Kenji; Fukasaku, Akitomi; Takahashi, Kunihiro

JAEA-Review 2009-054, 73 Pages, 2010/03

JAEA-Review-2009-054.pdf:6.79MB

An integrity investigation was carried out for the JMTR reactor building, which was the concrete structure and would be used for the long-term after JMTR restart, before the repair or replacement work of the JMTR related facilities that had begun in FY2007. In the integrity investigation, the concrete surface deterioration, the rebound number (nondestructive strength test), compressive strength using drilled concrete core test piece, the static modules of elasticity, the carbonation depth, the reinforced bar corrosion and the chloride ion content were investigated respectively and the integrity of concrete was confirmed. In order to use the JMTR reactor building continuously for long-term, it is important for maintaining the integrity of a concrete structure by the periodical maintenance and the repairing work including the building outer-wall surface painting that has been conducted up to now.

JAEA Reports

The Outline of investigation on integrity of JMTR concrete structures, cooling system and utility facilities

Ebisawa, Hiroyuki; Hanakawa, Hiroki; Asano, Norikazu; Kusunoki, Hidehiko; Yanai, Tomohiro; Sato, Shinichi; Miyauchi, Masaru; Oto, Tsutomu; Kimura, Tadashi; Kawamata, Takanori; et al.

JAEA-Technology 2009-030, 165 Pages, 2009/07

JAEA-Technology-2009-030.pdf:69.18MB

The condition of facilities and machinery used continuously were investigated before the renewal work of JMTR on FY 2007. The subjects of investigation were reactor building, primary cooling system tanks, secondary cooling system piping and tower, emergency generator and so on. As the result, it was confirmed that some facilities and machinery were necessary to repair and others were used continuously for long term by maintaining on the long-term maintenance plan. JMTR is planed to renew by the result of this investigation.

Journal Articles

Tritium release behavior from lithium titanate pebbles at low irradiation temperature

Kawamura, Hiroshi; Tsuchiya, Kunihiko; Nakamichi, Masaru; Fujita, J.*; Sagawa, Hisashi; Nagao, Yoshiharu; Y.Gohar*; ; Saito, Takashi; ; et al.

Fusion Technology 1998, 2, p.1289 - 1292, 1998/00

no abstracts in English

Journal Articles

Computerized operator support system for the JMTR

Oyamada, Rokuro; Yamamoto, Katsumune; Ishii, Yoshiki; ;

Japan-China Symp. on Research and Test Reactors, 15 Pages, 1988/00

no abstracts in English

8 (Records 1-8 displayed on this page)
  • 1