Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Ishii, Yui*; Yamamoto, Arisa*; Sato, Naoki*; Nambu, Yusuke*; Kawamura, Seiko; Murai, Naoki; Ohara, Koji*; Kawaguchi, Shogo*; Mori, Takao*; Mori, Shigeo*
Physical Review B, 106(13), p.134111_1 - 134111_7, 2022/10
Times Cited Count:0 Percentile:0(Materials Science, Multidisciplinary)Ohshima, Hiroyuki; Morishita, Masaki*; Aizawa, Kosuke; Ando, Masanori; Ashida, Takashi; Chikazawa, Yoshitaka; Doda, Norihiro; Enuma, Yasuhiro; Ezure, Toshiki; Fukano, Yoshitaka; et al.
Sodium-cooled Fast Reactors; JSME Series in Thermal and Nuclear Power Generation, Vol.3, 631 Pages, 2022/07
This book is a collection of the past experience of design, construction, and operation of two reactors, the latest knowledge and technology for SFR designs, and the future prospects of SFR development in Japan. It is intended to provide the perspective and the relevant knowledge to enable readers to become more familiar with SFR technology.
Nagao, Fumiya; Niizato, Tadafumi; Sasaki, Yoshito; Ito, Satomi; Watanabe, Takayoshi; Dohi, Terumi; Nakanishi, Takahiro; Sakuma, Kazuyuki; Hagiwara, Hiroki; Funaki, Hironori; et al.
JAEA-Research 2020-007, 249 Pages, 2020/10
The accident of the Fukushima Daiichi Nuclear Power Station, Tokyo Electric Power Company Holdings, Inc. occurred due to the Great East Japan Earthquake, Sanriku offshore earthquake, of 9.0 magnitude and the accompanying tsunami. As a result, large amount of radioactive materials was released into the environment. Under these circumstances, Japan Atomic Energy Agency (JAEA) has been conducting "Long-term Assessment of Transport of Radioactive Contaminants in the Environment of Fukushima" concerning radioactive materials released in environment, especially migration behavior of radioactive cesium since November 2012. This report is a summary of the research results that have been obtained in environmental dynamics research conducted by JAEA in Fukushima Prefecture.
Nagao, Fumiya; Niizato, Tadafumi; Sasaki, Yoshito; Ito, Satomi; Watanabe, Takayoshi; Dohi, Terumi; Nakanishi, Takahiro; Sakuma, Kazuyuki; Hagiwara, Hiroki; Funaki, Hironori; et al.
JAEA-Research 2019-002, 235 Pages, 2019/08
The accident of the Fukushima Daiichi Nuclear Power Station (hereinafter referred to 1F), Tokyo Electric Power Company Holdings, Inc. occurred due to the Great East Japan Earthquake, Sanriku offshore earthquake, of 9.0 magnitude and the accompanying tsunami. As a result, large amount of radioactive materials was released into the environment. Under these circumstances, JAEA has been conducting Long-term Environmental Dynamics Research concerning radioactive materials released in environment, especially migration behavior of radioactive cesium since November 2012. This report is a summary of the research results that have been obtained in environmental dynamics research conducted by JAEA in Fukushima Prefecture.
Sato, Toshinori; Sasamoto, Hiroshi; Ishii, Eiichi; Matsuoka, Toshiyuki; Hayano, Akira; Miyakawa, Kazuya; Fujita, Tomoo*; Tanai, Kenji; Nakayama, Masashi; Takeda, Masaki; et al.
JAEA-Research 2016-025, 313 Pages, 2017/03
The Horonobe Underground Research Laboratory (URL) Project is being pursued by the Japan Atomic Energy Agency (JAEA) to enhance the reliability of relevant disposal technologies through investigations of the deep geological environment within the host sedimentary formations at Horonobe, northern Hokkaido. This report summarizes the results of the Phase II investigations carried out from April 2005 to June 2014 to a depth of 350m. Integration of work from different disciplines into a "geosynthesis" ensures that the Phase II goals have been successfully achieved and identifies key issues that need to made to be addressed in the Phase II investigations Efforts are made to summarize as many lessons learnt from the Phase II investigations and other technical achievements as possible to form a "knowledge base" that will reinforce the technical basis for both implementation and the formulation of safety regulations.
Tada, Hiroyuki*; Kumasaka, Hiroo*; Saito, Akira*; Nakaya, Atsushi*; Ishii, Takashi*; Fujita, Tomoo; Sugita, Yutaka; Nakama, Shigeo; Sanada, Masanori*
Doboku Gakkai Rombunshu, F2 (Chika Kukan Kenkyu) (Internet), 73(1), p.11 - 28, 2017/03
This study examined the mechanical characteristics of rock segments and backfill materials and analyzed the stability of the drift that is supported by the rock segments and gravel backfill. The results confirmed the technical aspects of the formation of the rock segments and the effectiveness of the planned efforts to further reduce the amount of cement used.
Usui, Aya; Chiba, Atsuya; Yamada, Keisuke; Yokoyama, Akihito; Kitano, Toshihiko*; Takayama, Terumitsu*; Orimo, Takao*; Kanai, Shinji*; Aoki, Yuki*; Hashizume, Masashi*; et al.
Dai-28-Kai Tandemu Kasokuki Oyobi Sono Shuhen Gijutsu No Kenkyukai Hokokushu, p.117 - 119, 2015/12
no abstracts in English
Usui, Aya; Uno, Sadanori; Chiba, Atsuya; Yamada, Keisuke; Yokoyama, Akihito; Kitano, Toshihiko*; Takayama, Terumitsu*; Orimo, Takao*; Kanai, Shinji*; Aoki, Yuki*; et al.
Dai-27-Kai Tandemu Kasokuki Oyobi Sono Shuhen Gijutsu No Kenkyukai Hokokushu, p.118 - 121, 2015/03
no abstracts in English
Uno, Sadanori; Chiba, Atsuya; Yamada, Keisuke; Yokoyama, Akihito; Usui, Aya; Saito, Yuichi; Ishii, Yasuyuki; Sato, Takahiro; Okubo, Takeru; Nara, Takayuki; et al.
JAEA-Review 2013-059, JAEA Takasaki Annual Report 2012, P. 179, 2014/03
Three electrostatic accelerators at TIARA were operated on schedule in fiscal year 2012 except changing its schedule by cancellations of users. The yearly operation time of the 3 MV tandem accelerator, the 400 kV ion implanter and the 3MV single-ended accelerator were in the same levels as the ordinary one, whose operation time totaled to 2,073, 1,847 and 2,389 hours, respectively. The tandem accelerator had no trouble, whereas the ion implanter and the single-ended accelerator stopped by any troubles for one day and four days, respectively. The molecular ion beam of helium hydride was generated by the ion implanter, because the users required irradiation of several cluster ions in order to study the effect of irradiation. As a result, its intensity of beam was 50 nA at 200 kV. The ion beam of tungsten (W) at 15 MeV was accelerated by the tandem accelerator, whose intensity was 20 nA at charge state of 4+, because of the request from a researcher in the field of nuclear fusion.
Uno, Sadanori; Chiba, Atsuya; Yamada, Keisuke; Yokoyama, Akihito; Usui, Aya; Kitano, Toshihiko*; Takayama, Terumitsu*; Orimo, Takao*; Kanai, Shinji*; Aoki, Yuki*; et al.
Dai-26-Kai Tandemu Kasokuki Oyobi Sono Shuhen Gijutsu No Kenkyukai Hokokushu, p.79 - 81, 2013/07
Three electrostatic accelerators at TIARA were operated on schedule in fiscal year 2012 except changing its schedule by cancellations of users. The yearly operation time of the 3MV tandem accelerator, the 400 kV ion implanter and the 3 MV single-ended accelerator were in the same levels as the ordinary one, whose operation time totaled to 2,073, 1,847 and 2,389 hours, respectively. The tandem accelerator had no trouble, whereas the ion implanter and the single-ended accelerator stopped by any troubles for one day and four days, respectively. The ion implanter generated molecular ion beam of helium hydride by using the Freeman type ion source, because of the request from the user. As a result, its intensity of beam was 50 nA at 200 kV.
Tada, Hiroyuki*; Kumasaka, Hiroo*; Saito, Akira*; Nakaya, Atsushi*; Ishii, Takashi*; Sanada, Masanori; Noguchi, Akira*; Kishi, Hirokazu*; Nakama, Shigeo; Fujita, Tomoo
Dai-13-Kai Iwa No Rikigaku Kokunai Shimpojiumu Koen Rombunshu (CD-ROM), p.133 - 138, 2013/01
The authors have been developing methods for constructing tunnels using the minimum quantities of cement-type support materials in high-level radioactive waste disposal facilities and advancing research and development about the technical formation of rock segment using low alkaline mortar. In this study, the mechanical characteristic values concerning the rock segment and backfill materials were examined. The stability analysis of tunnel supported by the rock segment and backfilling with gravel were performed. Technical formation and effectiveness of the alternative supports planned for further reduction in cement influence was confirmed from a study result above-mentioned.
Uno, Sadanori; Chiba, Atsuya; Yamada, Keisuke; Yokoyama, Akihito; Saito, Yuichi; Ishii, Yasuyuki; Sato, Takahiro; Okubo, Takeru; Nara, Takayuki; Kitano, Toshihiko*; et al.
JAEA-Review 2012-046, JAEA Takasaki Annual Report 2011, P. 173, 2013/01
The three electrostatic accelerators at the TIARA had no mechanical damage when the Tohoku earthquake happened on March 11, 2011. But, they could not be operated during April, due to the influence of planned power outage by TEPCO. These accelerators additionally operated on Saturday for ten days in order to compensate for the lost experiment time. As a result, the yearly operation time had kept the same level as the ordinary one. The ion beam of erbium (Er) with 11.7MeV was accelerated newly by the tandem accelerator, whose intensity was 20nA at charge state of 3+. The sequential generation/irradiation of two different kinds of fullerene ions was achieved at the ion implanter by a mixed powder method without exchange of the Freeman type ion source by the user's request.
Uno, Sadanori; Chiba, Atsuya; Yamada, Keisuke; Yokoyama, Akihito; Saito, Yuichi; Ishii, Yasuyuki; Sato, Takahiro; Okubo, Takeru; Nara, Takayuki; Kitano, Toshihiko*; et al.
Dai-7-Kai Takasaki Oyo Kenkyu Shimpojiumu Yoshishu, P. 119, 2012/10
The three electrostatic accelerators at TIARA had no damage when the Tohoku earthquake happened on March 11, 2011. But, they could not be operated until end of April, due to the influence of planned power outage and keep out into the controlled area for radiation. These accelerators additionally operated on Saturday for twelve days in order to compensate for the lost experiment time. Therefore, the yearly operation time had kept the same level as the ordinary one. The tandem accelerator has stopped leakage of the SF gas from the base flange on the tank by the Viton gasket of rectangular cross section at the new type.
Shibata, Masahiro; Sawada, Atsushi; Tachi, Yukio; Makino, Hitoshi; Hayano, Akira; Mitsui, Seiichiro; Taniguchi, Naoki; Oda, Chie; Kitamura, Akira; Osawa, Hideaki; et al.
JAEA-Research 2012-032, 298 Pages, 2012/09
JAEA and NUMO have conducted a collaborative research work which is designed to enhance the methodology of repository design and performance assessment in preliminary investigation phase. The topics and the conducted research are follows; (1) Study on selection of host rock: in terms of hydraulic properties, items for assessing rock property, and assessment methodology of groundwater travel time has been organized with interaction from site investigation. (2) Study on development of scenario: the existing approach has been embodied, in addition, the phenomenological understanding regarding dissolution of and nuclide release from vitrified waste, corrosion of the overpack, long-term performance of the buffer are summarized. (3) Study on setting nuclide migration parameters: the approach for parameter setting has been improved for sorption and diffusion coefficient of buffer/rock, and applied and tested for parameter setting of key radionuclides. (4) Study on ensuring quality of knowledge: framework for ensuring quality of knowledge has been studied and examined aimed at the likely disposal facility condition.
Uno, Sadanori; Chiba, Atsuya; Yamada, Keisuke; Yokoyama, Akihito; Kitano, Toshihiko*; Takayama, Terumitsu*; Orimo, Takao*; Kanai, Shinji*; Aoki, Yuki*; Yamada, Naoto*; et al.
Dai-25-Kai Tandemu Kasokuki Oyobi Sono Shuhen Gijutsu No Kenkyukai Hokokushu, p.64 - 66, 2012/07
The three electrostatic accelerators at the TIARA had no damage when the Tohoku earthquake happened on March 11, 2011. But, they could not be operated until end of April, due to the influence of planned power outage and keep out into the controlled area for radiation. These accelerators additionally operated on Saturday for twelve days in order to compensate for the lost experiment time. Therefore, the yearly operation time had kept the same level as the ordinary one. The tandem accelerator has stopped leakage of the SF gas from the base flange on the tank by the Viton gasket of rectangular cross section at the new type. The ion implanter could generate two kinds of fullerene ions by a mixed material of ions and a controlled temperature of the oven without exchange of ion source.
Agematsu, Takashi; Uno, Sadanori; Chiba, Atsuya; Yamada, Keisuke; Yokoyama, Akihito; Saito, Yuichi; Ishii, Yasuyuki; Sato, Takahiro; Okubo, Takeru; Yokota, Wataru; et al.
JAEA-Review 2011-043, JAEA Takasaki Annual Report 2010, P. 173, 2012/01
Three electrostatic accelerators of TIARA were operated smoothly in FY 2010, and all the planned experiments were carried out except those canceled by users or the impact of Great East Japan Earthquake on March 11, 2011. On the other hand, Saturday operation for experiments was carried out after October on the Global Nuclear-Human Resource Development Initiative. The yearly operation time of the tandem accelerator, the single-ended accelerator and the ion implanter amounted to 2116, 2367 and 1800 hours, respectively, which were similar to those of usual years. Regarding the single-ended accelerator, the generator in the high-voltage terminal failed and was replaced with new one. A switching magnet was installed for a new branch beam line of the ion implanter. As to the tandem accelerator, In ion was generated and accelerated at intensity of 500 nA.
Harada, Satoshi*; Ehara, Shigeru*; Ishii, Keizo*; Sato, Takahiro; Yamazaki, Hiromichi*; Matsuyama, Shigeo*; Kamiya, Tomihiro
JAEA-Review 2011-043, JAEA Takasaki Annual Report 2010, P. 89, 2012/01
Uno, Sadanori; Chiba, Atsuya; Yamada, Keisuke; Yokoyama, Akihito; Agematsu, Takashi; Kitano, Toshihiko*; Takayama, Terumitsu*; Orimo, Takao*; Kanai, Shinji*; Aoki, Yuki*; et al.
Dai-24-Kai Tandemu Kasokuki Oyobi Sono Shuhen Gijutsu No Kenkyukai Hokokushu, p.125 - 128, 2011/07
The yearly operation time of three electrostatic accelerators at TIARA of Japan Atomic Energy Agency is keeping the same level since 2000, the tandem accelerator, the ion implanter and the single-ended accelerator amounted to about 2000, 1900 and 2500 hours, respectively. Three electrostatic accelerators did not have damage when the Tohoku Earthquake occurred on March 11, 2011. However, these accelerators were not able to operate during the planned power outage by Tokyo Electric Power Company (TEPCO). The tandem accelerator accelerated ion beam of In, which gave intensity of 500nA with stability. Additionally, the ion implanter generated maximum 400nA at ion beam of Gd, which was used in experiments for the users.
Hayashi, Katsuhiko; Noguchi, Akira; Kishi, Hirokazu; Kabayashi, Yasushi*; Nakama, Shigeo; Fujita, Tomoo; Naito, Morimasa; Tada, Hiroyuki*; Kumasaka, Hiroo*; Goke, Mitsuo*; et al.
JAEA-Research 2010-057, 101 Pages, 2011/03
Cement-type materials that are used for supports or grouting at high-level radioactive waste disposal facilities leach into the groundwater and create a highly alkaline environment. Of concern in highly alkaline environments are the alteration of bentonite used as buffers or backfill materials, and of surrounding rock mass, and the increased uncertainty regarding the provision of performance of the disposal system over a long period of time. In this study, to reduce the quantity of cement-type materials that cause highly alkaline environments, technical feasibility of the support structure including the materials which considered the long-term performance of the HLW disposal system are discussed by using knowledge and technology accumulated in JAEA and Shimizu Construction. Moreover, based on the results, the problems remained in the application to the future HLW disposal institution are summarized.
Agematsu, Takashi; Uno, Sadanori; Chiba, Atsuya; Yamada, Keisuke; Yokoyama, Akihito; Saito, Yuichi; Ishii, Yasuyuki; Sato, Takahiro; Okubo, Takeru; Yokota, Wataru; et al.
JAEA-Review 2010-065, JAEA Takasaki Annual Report 2009, P. 181, 2011/01
Three electrostatic accelerators of TIARA were operated smoothly in FY 2009, and all the planned experiments were carried out except those canceled by users. The yearly operation time of the tandem accelerator, the single-ended accelerator and the ion implanter amounted to 2100, 2416 and 1866 hours, respectively. Regarding the single-ended accelerator, the radio frequency oscillator of the ion source mounted in high-voltage terminal and the sequencer for control of the SB beam line failed, and they were replaced. The oven controller of Freeman ion source of the ion implanter was renewed. As to the tandem accelerator, Mn ion was successfully generated and accelerated with intensity of 150 nA.