Refine your search:     
Report No.
 - 
Search Results: Records 1-20 displayed on this page of 53

Presentation/Publication Type

Initialising ...

Refine

Journal/Book Title

Initialising ...

Meeting title

Initialising ...

First Author

Initialising ...

Keyword

Initialising ...

Language

Initialising ...

Publication Year

Initialising ...

Held year of conference

Initialising ...

Save select records

Journal Articles

Challenge to charge exchange with pure carbon foil in the J-PARC 3GeV synchrotron

Nakanoya, Takamitsu; Yoshimoto, Masahiro; Saha, P. K.; Takeda, Osamu*; Saeki, Riuji*; Muto, Masayoshi*

Proceedings of 20th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.937 - 941, 2023/11

In the J-PARC 3GeV Rapid Cycling Synchrotron (RCS), the 400MeV H$$^{-}$$ beam is changed to H+ beam by a charge exchange foil and accelerated to 3GeV. So far, RCS had used two types of charge exchange foil. One is the HBC (Hybrid Boron mixed Carbon) foil and the other is the Kaneka GTF (Graphene Thin Film). HBC foil is a patented deposition method developed at KEK for the stable production of thick carbon foil. Initially, the RCS used HBC foil produced atKEK. However, in 2017, JAEA had started HBC foil production and has been using it since then. Recently, we have succeeded in depositing thick pure carbon foil, which had been considered difficult to produce by the arc deposition method. As a new challenge, this pure carbon foil was used in the user operation from March 2023. As a result, Pure carbon foils showed less deformation and more stable charge exchange performance than HBC and GTF.

JAEA Reports

Decommissioning of uranium handling facility for development of nuclear fuel manufacturing equipment

Kageyama, Tomio; Denuma, Akio; Koizumi, Jin*; Odakura, Manabu*; Haginoya, Masahiro*; Isaka, Shinichi*; Kadowaki, Hiroyuki*; Kobayashi, Shingo*; Morimoto, Taisei*; Kato, Yoshiaki*; et al.

JAEA-Technology 2022-033, 130 Pages, 2023/03

JAEA-Technology-2022-033.pdf:9.87MB

Uranium handling facility for development of nuclear fuel manufacturing equipment (Mockup room) was constructed in 1972. The Mockup room has a weak seismic resistance and is deteriorating with age. Also, the original purpose with this facility have been achieved and there are no new development plans using this facility. Therefore, interior equipment installed in this facility had been dismantled and removed since March 2019. After that, the Mockup room was inspected for contamination, and then controlled area in the Mockup room was cancelled on March 29th 2022. A total of 6,549 workers (not including security witnesses) were required for this work. The amount of non-radioactive waste generated by this work was 31,300 kg. The amount of radioactive waste generated by this work was 3,734 kg of combustible waste (103 drums), 4,393 kg of flame resistance waste (61 drums), 37,790 kg of non-combustible waste (124 drums, 19 containers). This report describes about the dismantling and removing the interior equipment in the Mockup room, the amount of waste generated by this work, and procedure for cancellation the controlled area in the facility.

Journal Articles

Recent results of beam loss mitigation and extremely low beam loss operation of J-PARC RCS

Saha, P. K.; Okabe, Kota; Nakanoya, Takamitsu; Shobuda, Yoshihiro; Harada, Hiroyuki; Tamura, Fumihiko; Okita, Hidefumi; Yoshimoto, Masahiro; Hotchi, Hideaki*

Journal of Physics; Conference Series, 2420, p.012040_1 - 012040_7, 2023/01

Journal Articles

Recent usage status of charge-exchange stripper foil for 3GeV synchrotron of J-PARC

Nakanoya, Takamitsu; Yoshimoto, Masahiro; Saha, P. K.; Takeda, Osamu*; Saeki, Riuji*; Muto, Masayoshi*

Proceedings of 19th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.629 - 633, 2023/01

In the J-PARC 3-GeV Rapid Cycling Synchrotron (RCS), a 400 MeV H- beam injected from the linac is exchange to an H+ beam by a charge exchange foil and accelerated to 3 GeV. The charge exchange foils mainly used in the RCS are HBC foil (Hybrid Boron mixed Carbon stripper foil), which are made by adding a small amount of boron to carbon rods and using them as electrodes by the arc deposition method. Since 2018, foils produced by JAEA have been used for user operation. So far, no major problems have occurred due to the foils. Meanwhile, the beam power of the RCS has been gradually increased from 500 kW to 830 kW since 2018. As beam power increases, the foil issues were identified to achieve the RCS design power of 1 MW. In this paper, we will report on the recent foil usage status and issue in the user operation.

Journal Articles

Results of 1-MW operation in J-PARC 3 GeV rapid cycling synchrotron, 2

Yamamoto, Kazami; Yamamoto, Masanobu; Yamazaki, Yoshio; Nomura, Masahiro; Suganuma, Kazuaki; Fujirai, Kosuke; Kamiya, Junichiro; Nakanoya, Takamitsu; Hatakeyama, Shuichiro; Yoshimoto, Masahiro; et al.

Proceedings of 19th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.277 - 281, 2023/01

The J-PARC 3GeV Rapid Cycling Synchrotron (RCS) is aiming to provide the proton beam of very high power for neutron experiments and the main ring synchrotron. We have continued the beam commissioning and the output power from RCS have been increasing. In recent years, we have been trying continuous supply of 1-MW high-intensity beam, which is the design value, to a neutron target. We tried to operate continuously for over 40 hours in June 2020. However, some trouble occurred and the operation was frequently suspended. In June 2021, we tried again 1-MW operation but it was suspended due to deterioration of the cooling water performance. Last summer shutdown period, we recovered performance of the cooling water system and retried in this June. In the final case, the outside temperature became extremely high. We could not keep 1-MW power, whereas 600 kW beam was delivered in stable.

Journal Articles

Achievement of low beam loss at high-intensity operation of J-PARC 3 GeV RCS

Saha, P. K.; Okabe, Kota; Nakanoya, Takamitsu; Yoshimoto, Masahiro; Shobuda, Yoshihiro; Harada, Hiroyuki; Tamura, Fumihiko; Okita, Hidefumi; Hatakeyama, Shuichiro; Moriya, Katsuhiro; et al.

Proceedings of 19th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.1 - 5, 2023/01

Journal Articles

Design and actual performance of J-PARC 3 GeV rapid cycling synchrotron for high-intensity operation

Yamamoto, Kazami; Kinsho, Michikazu; Hayashi, Naoki; Saha, P. K.; Tamura, Fumihiko; Yamamoto, Masanobu; Tani, Norio; Takayanagi, Tomohiro; Kamiya, Junichiro; Shobuda, Yoshihiro; et al.

Journal of Nuclear Science and Technology, 59(9), p.1174 - 1205, 2022/09

 Times Cited Count:6 Percentile:84.97(Nuclear Science & Technology)

In the Japan Proton Accelerator Research Complex, the purpose of the 3 GeV rapid cycling synchrotron (RCS) is to accelerate a 1 MW, high-intensity proton beam. To achieve beam operation at a repetition rate of 25 Hz at high intensities, the RCS was elaborately designed. After starting the RCS operation, we carefully verified the validity of its design and made certain improvements to establish a reliable operation at higher power as possible. Consequently, we demonstrated beam operation at a high power, namely, 1 MW. We then summarized the design, actual performance, and improvements of the RCS to achieve a 1 MW beam.

JAEA Reports

Decommissioning of Pre-dismantling Temporary Waste Storage Facility 3 (FPG-03a,b,c) in Plutonium Fuel Production Facility

Shinozaki, Masaru; Aita, Takahiro; Iso, Takahito*; Odakura, Manabu*; Haginoya, Masahiro*; Kadowaki, Hiroyuki*; Kobayashi, Shingo*; Inagawa, Takumu*; Morimoto, Taisei*; Iso, Hidetoshi; et al.

JAEA-Technology 2021-043, 100 Pages, 2022/03

JAEA-Technology-2021-043.pdf:7.49MB

It is planned that the MOX (Mixed Oxide) from the decommissioned facilities in Nuclear Fuel Cycle Engineering Laboratories is going to be consolidated and stored stably and safely for a long term in Plutonium Fuel Production Facility of the Plutonium Fuel Development Center of Nuclear Fuel Cycle Engineering Laboratories. For this purpose, it is necessary to pelletize nuclear fuel materials in the facility and store them in the assembly storage (hereinafter referred to as "waste packaging work") to secure storage space in the plutonium material storage. As a countermeasure to reduce the facility risk in this waste packing work, it was decided to construct a new powder weighing and homogenization mixing facility to physically limit the amount (batch size) of nuclear fuel materials handled at the entrance of the process. In order to secure the installation space for the new facility in the powder preparation room (1) (FP-101), the pre-dismantling temporary waste storage facility 3 (FPG-03a, b, c) was dismantled and removed. This facility consists of a granulating and sizing facility, an additive mixing facility, and a receiving and delivering guided facility, which started to be used from January 1993, and was discontinued on February 3, 2012 and became a waste facility. Subsequently, the dismantling and removal of the interior equipment was carried out by pellet fabrication section for glove operation to reduce the amount of hold-up, and before the main dismantling and removal, there was almost no interior equipment except for large machinery. This report describes the dismantling and removal of the glove box and some interior equipment and peripherals of the facility, as well as the Green House setup method, dismantling and removal procedures, and issues specific to powder process equipment (dust, etc.).

JAEA Reports

Report of the design examination and the installation work for the radiation shield at the beam injection area in the 3 GeV synchrotron

Nakanoya, Takamitsu; Kamiya, Junichiro; Yoshimoto, Masahiro; Takayanagi, Tomohiro; Tani, Norio; Kotoku, Hirofumi*; Horino, Koki*; Yanagibashi, Toru*; Takeda, Osamu*; Yamamoto, Kazami

JAEA-Technology 2021-019, 105 Pages, 2021/11

JAEA-Technology-2021-019.pdf:10.25MB

Since a user operation startup, the 3 GeV synchrotron accelerator (Rapid-Cycling Synchrotron: RCS) gradually reinforced the beam power. As a result, the surface dose rate of the apparatus located at the beam injection area of the RCS, such as the magnet, vacuum chambers, beam monitors, etc., increases year by year. The beam injection area has many apparatuses which required manual maintenance, so reducing worker's dose is a serious issue. To solve this problem, we have organized a task force for the installation of the shield. The task force has aimed to optimize the structure of the radiation shield, construct the installation procedure with due consideration of the worker's dose suppression. As the examination result of the shield design, we have decided to adopt removal shielding that could be installed quickly and easily when needed. We carried out shield installation work during the 2020 summer maintenance period. The renewal work required to install the shielding has been carried out in a under high-dose environment. For this reason, reducing the dose of workers was an important issue. So, we carefully prepared the work plan and work procedure in advance. During the work period, we implemented various dose reduction measures and managed individual dose carefully. As a result, the dose of all workers could be kept below the predetermined management value. We had installed removal shielding at the beam injection area in the 2020 summer maintenance period. We confirmed that this shield can contribute to the reduction of the dose during work near the beam injection area. It was a large-scale work to occupy the beam injection area during almost of the summer maintenance period. However, it is considered very meaningful for dose suppression in future maintenance works.

Journal Articles

Radiation shielding installation for beam injection section of 3GeV synchrotron

Nakanoya, Takamitsu; Kamiya, Junichiro; Yoshimoto, Masahiro; Takayanagi, Tomohiro; Tani, Norio; Kotoku, Hirofumi*; Horino, Koki*; Yanagibashi, Toru*; Takeda, Osamu*; Yamamoto, Kazami

Proceedings of 18th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.238 - 242, 2021/10

Since a user operation startup, the 3GeV synchrotron accelerator (Rapid-Cycling Synchrotron: RCS) gradually reinforced the beam power. As a result, the surface dose rate of the apparatus located at the beam injection area of the RCS increases year by year. The beam injection area has many apparatuses which required manual maintenance, so reducing worker's dose is a serious issue. To solve this problem, we have decided to adopt removal shielding that could be installed quickly and easily when needed. We carried out shield installation work during the 2020 summer maintenance period. The installation work of the shield has been carried out in a under high-dose environment. For this reason, reducing the dose of workers was an important issue. So, we carefully prepared the work plan and work procedure in advance. During the work period, we implemented various dose reduction measures and managed individual dose carefully. As a result, the dose of all workers could be kept below the predetermined management value. We had installed removal shielding at the beam injection area in the 2020 summer maintenance period. We confirmed that this shield can contribute to the reduction of the dose during work near the beam injection area.

Journal Articles

Initiatives to address the lifetime improvement of HBC stripper foil for 3GeV synchrotron of J-PARC

Yoshimoto, Masahiro; Nakanoya, Takamitsu; Yamazaki, Yoshio; Saha, P. K.; Kinsho, Michikazu; Yamamoto, Shunya*; Okazaki, Hiroyuki*; Taguchi, Tomitsugu*; Yamada, Naoto*; Yamagata, Ryohei*

Proceedings of 18th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.850 - 854, 2021/10

no abstracts in English

Journal Articles

Dependence of charge-exchange efficiency on cooling water temperature of a beam transport line

Yamamoto, Kazami; Hatakeyama, Shuichiro; Saha, P. K.; Moriya, Katsuhiro; Okabe, Kota; Yoshimoto, Masahiro; Nakanoya, Takamitsu; Fujirai, Kosuke; Yamazaki, Yoshio; Suganuma, Kazuaki

EPJ Techniques and Instrumentation (Internet), 8(1), p.9_1 - 9_9, 2021/07

The 3 GeV Rapid Cycling Synchrotron at the Japan Proton Accelerator Research Complex supplies a high-intensity proton beam for neutron experiments. Various parameters are monitored to achieve a stable operation, and it was found that the oscillations of the charge-exchange efficiency and cooling water temperature were synchronized. We evaluated the orbit fluctuations at the injection point using a beam current of the injection dump, which is proportional to the number of particles that miss the foil and fail in the charge exchange, and profile of the injection beam. The total width of the fluctuations was approximately 0.072 mm. This value is negligible from the user operation viewpoint as our existing beam position monitors cannot detect such a small signal deviation. This displacement corresponds to a 1.63$$times$$10$$^{-5}$$ variation in the dipole magnetic field. Conversely, the magnetic field variation in the L3BT dipole magnet, which was estimated by the temperature change directly, is 4.08$$times$$10$$^{-5}$$. This result suggested that the change in the cooling water temperature is one of the major causes of the efficiency fluctuation.

Journal Articles

Alternation of magnetic anisotropy accompanied by metal-insulator transition in strained ultrathin manganite heterostructures

Kobayashi, Masaki*; Anh, L. D.*; Suzuki, Masahiro*; Kaneta-Takada, Shingo*; Takeda, Yukiharu; Fujimori, Shinichi; Shibata, Goro*; Tanaka, Arata*; Tanaka, Masaaki*; Oya, Shinobu*; et al.

Physical Review Applied (Internet), 15(6), p.064019_1 - 064019_10, 2021/06

 Times Cited Count:4 Percentile:27.71(Physics, Applied)

Journal Articles

Analysis of J-HBC stripper foil for the J-PARC RCS

Yoshimoto, Masahiro; Nakanoya, Takamitsu; Yamazaki, Yoshio; Saha, P. K.; Kinsho, Michikazu; Yamamoto, Shunya*; Okazaki, Hiroyuki*; Taguchi, Tomitsugu*; Yamada, Naoto*; Yamagata, Ryohei*

JPS Conference Proceedings (Internet), 33, p.011019_1 - 011019_7, 2021/03

BB2019-1209.pdf:0.86MB

The multi-turn charge-exchange H$$^{-}$$ beam injection scheme with stripper foils is one of the key techniques to achieve a MW-class high power proton beam. The J-PARC RCS adopts Hybrid type Boron-doped Carbon (HBC) stripper foil, which was developed in KEK to improve the lifetime. Indeed, the RCS user operation confirmed that HBC foil has the great advantage of a longer lifetime against high beam irradiation. To examine characteristics of the HBC foils, various beam studies were performed, such as the stripping efficiency measurement and long-term observation with an H$$^{-}$$ beam in the J-PARC RCS, foil analysis using RBS, EDR and PIXE methods, and SEM and TEM observation after the ion beam irradiation in Takasaki Ion Accelerators for Advanced Radiation Application (TIARA) on National Institutes for Quantum and Radiological Science and Technology (QST). Recently, the deposition apparatus for the HBC foils from the KEK Tsukuba-site was relocated to the JAEA Tokai-site, and we started fabrication of new HBC foil in 2017. (The new one fabricated in JAEA we call J-HBC foil.) And, we continue investigations in TIARA with the J-HBC foils. Furthermore, in-depth researches by changing the process parameters of the foil deposition are carried on. Recent results suggest that the amount of the boron doped in the foil is more important parameter than the ratio of the discharge amount of carbon from cathode and anode electrodes. In this presentation, we will report the details of recent analysis of the J-HBC foil.

Journal Articles

Results of 1-MW operation in J-PARC 3 GeV rapid cycling synchrotron

Yamamoto, Kazami; Yamamoto, Masanobu; Yamazaki, Yoshio; Nomura, Masahiro; Suganuma, Kazuaki; Fujirai, Kosuke; Kamiya, Junichiro; Hatakeyama, Shuichiro; Hotchi, Hideaki; Yoshimoto, Masahiro; et al.

Proceedings of 17th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.209 - 213, 2020/09

The J-PARC 3GeV Rapid Cycling Synchrotron (RCS) is aiming to provide the proton beam of very high power for neutron experiments and the main ring synchrotron. We have continued the beam commissioning and the output power from RCS have been increasing. In recent years, just before the summer shutdown period, we have been trying continuous supply of 1-MW high-intensity beam, which is the design value, to a neutron target. First trial was 1-hour continuous operation in July 2018, and second trial was 10-hours continuous in July 2019. In both cases, we achieved almost stable operation. Furthermore, in June 2020, we tried to operate continuously for over 40 hours. But in this case, some trouble occurred and the operation was frequently suspended. Through these continuous operation trials, we have identified issues for stable operation of 1 MW. In this presentation, we will report the results of 1-MW continuous operation and issues obtained from these results.

Journal Articles

Progress status in fabrication of HBC stripper foil for 3-GeV RCS at J-PARC in Tokai site

Yoshimoto, Masahiro; Yamazaki, Yoshio; Nakanoya, Takamitsu; Saha, P. K.; Kinsho, Michikazu

EPJ Web of Conferences, 229, p.01001_1 - 01001_7, 2020/02

In the 3-GeV Rapid Cycling Synchrotron (RCS) of the Japan Proton Accelerator Research Complex (J-PARC), we adopted thick Hybrid type Boron-doped Carbon (HBC) stripper foil for the multi-turn H$$^{-}$$ charge-exchange injection. The HBC stripper foil developed at KEK has been successfully demonstrated to improve the foil lifetime significantly. Early manufacturing process of the stripper foil in the J-PARC had been carried out in following two steps: foil fabrication in KEK Tsukuba-site and foil preparation in JAEA Tokai-site. However, to proceed with the foil manufacturing in a same place efficiently, the carbon discharge arc-evaporation system for HBC stripper foil was removed from the Tsukuba-site and relocated in the Tokai-site. After reassembling of the carbon discharge arc-evaporation system, performance evaluation tests of new HBC foil which are produced at the JAEA Tokai site (J-HBC) are implemented at the TIARA facility of QST-Takasaki. As results of argon beam irradiation for lifetime evaluation, components analysis with RBS method, and impurity evaluation with micro-PIXE method, we can verify that the J-HBC foil performs pretty much equally to the original HBC foil. After the irradiation test by using 400MeV H$$^{-}$$ beam in the J-PARC RCS, user operation by using the J-HBC foil was successfully demonstrated for 10 days.

Journal Articles

Fabrication status of charge stripper foil for 3 GeV synchrotron of J-PARC

Nakanoya, Takamitsu; Yoshimoto, Masahiro; Yamazaki, Yoshio; Takeda, Osamu*; Saeki, Riuji*; Muto, Masayoshi*

Proceedings of 16th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.545 - 549, 2019/07

In the 3 GeV Rapid Cycling Synchrotron (RCS) of the Japan Proton Accelerator Research complex (J-PARC), we adopted the carbon stripper foil for the multi-turn H- charge exchange injection. The charge exchange foil which use in RCS is fabricated by the arc discharge method with the boron doped carbon electrode. The foil fabricated this method is called HBC foil (Hybrid Boron mixed Carbon stripper foil). HBC foil had been developed at KEK. It has high durability for the beam irradiation damage. In past days, the foil fabrication process was conducted in KEK Tsukuba-site and the foil preparation process was conducted in JAEA Tokai-site. In 2017, the foil deposition apparatus has been relocated from KEK to JAEA, and we started both processes in Tokai-site. We carried out the offline beam irradiation test for the new HBC foil which fabricated in JAEA, and we confirmed that its performance is equivalent to the original HBC foil. Next we tested a new HBC foil with actual beam in RCS and we confirmed it could withstand 1 week beam irradiation. After that, we started user operation with the new HBC foil in 2018. So far we accomplished stable user operation for one year by using the new HBC foil only.

Journal Articles

Activation in injection area of J-PARC 3-GeV rapid cycling synchrotron and its countermeasures

Yamamoto, Kazami; Yamakawa, Emi*; Takayanagi, Tomohiro; Miki, Nobuharu*; Kamiya, Junichiro; Saha, P. K.; Yoshimoto, Masahiro; Yanagibashi, Toru*; Horino, Koki*; Nakanoya, Takamitsu; et al.

ANS RPSD 2018; 20th Topical Meeting of the Radiation Protection and Shielding Division of ANS (CD-ROM), 9 Pages, 2018/08

The existing beam power of the J-PARC Rapid Cycling Synchrotron is up to 500 kW, and higher radiation doses are concentrated in the injection area. These activations are caused by the interaction between the foil and the beam. To reduce dose exposure to workers near the injection point, we study a new design of the injection scheme. Experience has shown that eddy currents are generated in the metal flange near the magnet owing to the pulsed magnetic field, and the temperature exceeds 100 degrees C. The shield installed in the new injection system needs to have a layer structure, in which an insulator is inserted between iron shields to reduce the eddy current. From the results of the shielding calculation, even if 1 mm of polyethylene was inserted between two 9-mm-thick SUS 316 plates, which serve as shielding material, the shielding performance was reduced only about 5%, and we confirmed that it would function well.

Journal Articles

Non-destructive examination of jacket sections for ITER central solenoid conductors

Takahashi, Yoshikazu; Suwa, Tomone; Nabara, Yoshihiro; Ozeki, Hidemasa; Hemmi, Tsutomu; Nunoya, Yoshihiko; Isono, Takaaki; Matsui, Kunihiro; Kawano, Katsumi; Oshikiri, Masayuki; et al.

IEEE Transactions on Applied Superconductivity, 25(3), p.4200904_1 - 4200904_4, 2015/06

 Times Cited Count:3 Percentile:20.23(Engineering, Electrical & Electronic)

The Japan Atomic Energy Agency (JAEA) is responsible for procuring all amounts of Central Solenoid (CS) Conductors for ITER, including CS jacket sections. The conductor is cable-in-conduit conductor (CICC) with a central spiral. A total of 576 Nb$$_{3}$$Sn strands and 288 copper strands are cabled around the central spiral. The maximum operating current is 40 kA at magnetic field of 13 T. CS jacket section is circular in square type tube made of JK2LB, which is high manganese stainless steel with boron added. Unit length of jacket sections is 7 m and 6,300 sections will be manufactured and inspected. Outer/inner dimension and weight are 51.3/35.3 mm and around 90 kg, respectively. Eddy Current Test (ECT) and Phased Array Ultrasonic Test (PAUT) were developed for non-destructive examination. The defects on inner and outer surfaces can be detected by ECT. The defects inside jacket section can be detected by PAUT. These technology and the inspected results are reported in this paper.

Journal Articles

Studies on maintainability and repairability for Japan Sodium-cooled Fast Reactor (JSFR)

Isono, Kenichi; Kubo, Shigenobu; Chikazawa, Yoshitaka; Dozaki, Koji*; Oya, Takeaki*; Yui, Masahiro*

Proceedings of 22nd International Conference on Nuclear Engineering (ICONE-22) (DVD-ROM), 7 Pages, 2014/07

Aiming at enabling maintenance and repair of almost all components in JSFR demonstration reactor to a level equivalent to that attained for the light water reactors, we identified a number of parts which have difficulty in maintenance and repair in main components of the reactor structure and the primary/secondary main coolant system. And we defined the criteria for design improvement and then provided candidates of improvement measures for the identified parts. Furthermore, we made a modification of the plant design in a consistent manner integrating the improvements investigated for each major component. A series of evaluations were conducted to check the feasibility as a power plant. As the result, we found that the concept could be adopted not only to the demonstration reactor (750 MWe) but to the commercial one (1500 MWe).

53 (Records 1-20 displayed on this page)