Refine your search:     
Report No.
 - 
Search Results: Records 1-3 displayed on this page of 3
  • 1

Presentation/Publication Type

Initialising ...

Refine

Journal/Book Title

Initialising ...

Meeting title

Initialising ...

First Author

Initialising ...

Keyword

Initialising ...

Language

Initialising ...

Publication Year

Initialising ...

Held year of conference

Initialising ...

Save select records

JAEA Reports

Manufacture of substitutive assemblies for MONJU reactor decommissioning

Sakakibara, Hiroshi; Aoki, Nobuhiro; Muto, Masahiro; Otabe, Jun; Takahashi, Kenji*; Fujita, Naoyuki*; Hiyama, Kazuhiko*; Suzuki, Hirokazu*; Kamogawa, Toshiyuki*; Yokosuka, Toru*; et al.

JAEA-Technology 2020-020, 73 Pages, 2021/03

JAEA-Technology-2020-020.pdf:8.26MB

The decommissioning is currently in progress at the prototype fast breeder reactor Monju. Fuel assemblies will be taken out of its core for the first step of the great task. Fuel assemblies stand on their own spike plugged into a socket on the core support plate and support with adjacent assemblies through their housing pads each other, resulting in steady core structure. For this reason, some substitutive assemblies are necessary for the purpose of discharging the fuel assemblies of the core. Monju side commissioned, therefore, Plutonium Fuel Development Center to manufacture the substitutive assemblies and the Center accepted it. This report gives descriptions of design, manufacture, and shipment in regard to the substitutive assemblies.

JAEA Reports

Rise-to-power test in High Temperature Engineering Test Reactor; Test progress and summary of test results up to 30MW of reactor thermal power

Nakagawa, Shigeaki; Fujimoto, Nozomu; Shimakawa, Satoshi; Nojiri, Naoki; Takeda, Takeshi; Saikusa, Akio; Ueta, Shohei; Kojima, Takao; Takada, Eiji*; Saito, Kenji; et al.

JAERI-Tech 2002-069, 87 Pages, 2002/08

JAERI-Tech-2002-069.pdf:10.12MB

Rise-to-power test in the HTTR has been performed from April 23rd to June 6th in 2000 as phase 1 test up to 10MW, from January 29th to March 1st in 2001 as phase 2 test up to 20MW in the rated operation mode and from April 14th to June 8th in 2001 as phase 3 test up to 20MW in the high temperature test operation mode. Phase 4 test to achieve the thermal reactor power of 30MW started from October 23rd in 2001. On December 7th it was confirmed that the thermal reactor power reached to 30MW and the reactor outlet coolant temperature reached to 850$$^{circ}$$C. JAERI obtained the certificate of pre-operation test from MEXT because all the pre-operation tests by MEXT were passed successfully. From the test results of rise-up-power test up to 30MW, the performance of reactor and cooling system were confirmed, and it was confirmed that an operation of reactor facility could be performed safely. Some problems to be solved were found through tests. By means of solving them, the reactor operation with the reactor outlet coolant temperature of 950$$^{circ}$$C will be achievable.

Oral presentation

Magnetism of the ligand site of Np$$T$$Ga$$_5$$ ($$T$$=Co, Ni) studied by X-ray absorption magnetic circular dichroism

Okane, Tetsuo; Okochi, Takuo; Takeda, Yukiharu; Fujimori, Shinichi; Saito, Yuji; Yamagami, Hiroshi; Fujimori, Atsushi*; Kawamura, Naomi*; Suzuki, Motohiro*; Tsutsui, Satoshi*; et al.

no journal, , 

no abstracts in English

3 (Records 1-3 displayed on this page)
  • 1